Privacy and Security Notice

Summary of the E2 Run

E2 Run Summary

Stepan Stepanyan

Presentation on CLAS collaboration meeting, June 3-5



 
 
 
 
 

E2 run includes seven proposals of multihadron physics group.
Six of this proposals were included in the single package PR-91-009.
The package was approved to run for 800 hours.
38 days of running was scheduled to run from April 15 until May 28.
(456 hours of running with 50% efficiency)

 
 

Run coordinators (ECO) - Stepan Stepanyan, Larry Weinstein, Dave Rowntree, Maurik Holtrop, Tony Forest.

Chief of Operation (COP) - Mac Mestayer, Mark Ito.
 
 
 
 
 
Physics proposals: 

 
 
 
 

E89015 - Study of Coincidence Reactions in the Dip and Delta-Resonance Regions (Hossain Baghaei)

E89017 - Electroexcitation of the Delta(1232) in Nuclei (Richard Sealock).
E89027 - Coincidence Reaction Studies with the LAS (William Bertozzi, Werner Boeglin, Lawrence Weinstein)
E89031 - Study of Multi-Nucleon Knockout With the CEBAF Large Acceptance Spectrometer (Bill Hersman, Jack Lightbody, Rory Miskimen).
E89032 - Study of the Local Properties of Nuclear Matter in Electron-Nucleus and Photon-Nucleus Interactions with Backward Particle Production Using the CLAS Detector (Valdimir Gavrilov, Georgy Leksin).
E89036 - Study of Short-Range Properties of Nuclear Matter in Electron-Nucleus and Photon-Nucleus Interactions with Backward Particle Production using the CLAS Detector (Kim Egiyan).
E98104 - Measurement of the polarized electron beam asymmetry on exclusive reactions in nuclei with CLAS (Bill Hersman, Maurik Holtrop).

 
 
 
 
Proposed run plan for e2 (4/15 - 5/28)
 
Dates
Ebeam (GeV)
Target
It (A)
Im (A)
Comments
4/13-4/14
Maint.
 
 
 
Put the heat shield
4/15 -
4.4
56Fe
2250
6000
Beam tune 4 hours 
test run with 4He 4 hours 
1 day 

Molybdenum shield is in

 
 
4He
2250
 
6 days
Molybdenum shield is out
- 4/26
4.4
12C
2250
6000
4 days
4/27-4/29
Maint.
 
 
 
3 days
Cange the cell if needed
4/30-5/04
4.4
3He
2250
6000
5days
5/05-
1.1 
3He
750
 
.7 days
-5/07
1.1 
12C
750
6000
.3 days
5/08-5/13
Facil.D.
 
Maint
 
3/3 days
05/14 -
2.2 
4He
2250
6000
5 days
 
 
3He
2250
 
5 days
Change 4He to H2
- 5/28
2.2
12C
2250
6000
4 days

Conditions:

Trigger EC only at 4.4 GeV, EC*CC at 2.2 GeV and 1.1 GeV;
Moller runs every 2 days;
Empty target runs - about 5% of He data;
CH2 runs at 4.4 GeV and 1.1 GeV for calibration;
Hydrogen run at 2.2 GeV for calibration;

 
Run plan for e2 (4/15 - 5/28)
 
Dates
Ebeam (GeV)
Target
It (A)
Im (A)
Comments
4/13-4/14
Maint.
 
 
 
Put the heat shield
4/15 -
4.4
 
56Fe
2250
6000
1 day
Molybdenum shield is in
 
 
4He
2250
 
6 days
Molybdenum shield is out
- 4/26
4.4
12C
2250
6000
4 days
4/27-4/29
Maint.
 
 
 
3 days
5/1 - 
2.2
12C
2250
6000
5 days
5/04
 
Target
is
back
1 day
- 5/10
2.2 
4He
2250
6000
6 days
5/11-5/13
 
 
Maint
 
3 days
05/14 - 
1.1 
12C
1500
750
6000
1 days
- 5/18
1.1
3He
1500/
750
 
2 days
5/18 - 5/23
2.2
3He
2250
 
5 days
5/24 - 5/27
4.4
12C
2250
6000
3 days

Conditions:

Trigger EC only at 4.4 GeV, EC*CC at 2.2 GeV and 1.1 GeV;
Moller runs every 2 days;
Empty target runs - about 5% of He data;
CH2 runs at 4.4 GeV, 2.2 GeV and 1.1 GeV for calibration;
He + 12C runs for calibration;

 
 
 
 
E2 targets -
Beam current at 4.4/2.2/1.1 (nA)
12C     d = 0.1cm                 L = 0.85x1033/nA                             10/15/6
56Fe   d = 0.015cm             L = 0.44x1033/nA                             10/10
             CH2    d = 0.07cm               L = 0.35x1033/nA                              10/12
4He    d = 5.cm                    L = 2.35x1033/nA                             4.5/6
3He    d = 5.cm                    L = 1.2x1033/nA                               10/11/5
Empty (4 types) d = 0.005cm  L = 0.05x1033/nA                        35/35/32
Unstable liquid targets with fluctuating density in the cell.
Measurements with combined liquid and solid targets have been made to estimate systematics of the fluctuations.

 
 
The main events during the run -
Exelent work have been done by Dave Kashy and the group (as usual).
 
 
The main problems:
 
 
 
Summary of the run:
 

Although there were many problems and beam time lost we were able to -

collect 2303M triggers in the 4278 files of 365 runs.


The next step -

Calibrate ( ~ 3 month) and process data.