Presentation on CLAS collaboration meeting, June 3-5
E2 run includes seven proposals of multihadron physics group. Six of this proposals were included in the single package PR-91-009. The package was approved to run for 800 hours.
38 days of running was scheduled to run from April 15 until May 28. (456 hours of running with 50% efficiency)
Run coordinators (ECO) - Stepan Stepanyan, Larry Weinstein, Dave Rowntree, Maurik Holtrop, Tony Forest.
Chief of Operation (COP) - Mac Mestayer, Mark Ito.
|
Physics proposals:
|
E89015 - Study of Coincidence Reactions in the Dip and Delta-Resonance Regions (Hossain Baghaei)
| Proposed run plan for e2 (4/15 - 5/28) |
|
|
|
|
|
|
|
|---|---|---|---|---|---|
|
|
|
|
|
|
|
|
|
|
|
|
|
Molybdenum shield is in |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Conditions:
Trigger EC only at 4.4 GeV, EC*CC at 2.2 GeV and 1.1 GeV;
Moller runs every 2 days;
Empty target runs - about 5% of He data;
CH2 runs at 4.4 GeV and 1.1 GeV for calibration;
Hydrogen run at 2.2 GeV for calibration;
|
Run plan
for e2 (4/15 - 5/28)
|
|
Dates
|
Ebeam (GeV)
|
Target
|
It (A)
|
Im (A)
|
Comments
|
|---|---|---|---|---|---|
|
4/13-4/14
|
Maint.
|
|
|
|
Put the heat shield
|
|
4/15 -
|
4.4
|
56Fe
|
2250
|
6000
|
1 day
Molybdenum shield is in
|
|
|
|
4He
|
2250
|
|
6 days
Molybdenum shield is out
|
|
- 4/26
|
4.4
|
12C
|
2250
|
6000
|
4 days
|
|
4/27-4/29
|
Maint.
|
|
|
|
3 days
|
|
5/1 -
|
2.2
|
12C
|
2250
|
6000
|
5 days
|
|
5/04
|
|
Target
|
is
|
back
|
1 day
|
|
- 5/10
|
2.2
|
4He
|
2250
|
6000
|
6 days
|
|
5/11-5/13
|
|
|
Maint
|
|
3 days
|
|
05/14 -
|
1.1
|
12C
|
1500
750
|
6000
|
1 days
|
|
- 5/18
|
1.1
|
3He
|
1500/
750
|
|
2 days
|
|
5/18 - 5/23
|
2.2
|
3He
|
2250
|
|
5 days
|
|
5/24 - 5/27
|
4.4
|
12C
|
2250
|
6000
|
3 days
|
Conditions:
Trigger EC only at 4.4 GeV, EC*CC at 2.2 GeV and 1.1 GeV;Moller runs every 2 days;Empty target runs - about 5% of He data;CH2 runs at 4.4 GeV, 2.2 GeV and 1.1 GeV for calibration;He + 12C runs for calibration;
|
E2 targets
-
|
Beam current at 4.4/2.2/1.1 (nA)
12C d = 0.1cm L = 0.85x1033/nA 10/15/6
56Fe d = 0.015cm L = 0.44x1033/nA 10/10
4He d = 5.cm L = 2.35x1033/nA 4.5/6
3He d = 5.cm L = 1.2x1033/nA 10/11/5Empty (4 types) d = 0.005cm L = 0.05x1033/nA 35/35/32
|
The main events
during the run -
|
|
The main problems:
|
| Summary of the run: |
Although there were many problems and beam time lost we were able to -