Run summary, Q2= 3.5 GeV2 (11/04-11/07)
|
|
|
|
|
|
1064-1065 |
|
|
|
|
1081 1084 |
|
|
|
|
1121 |
|
|
|
|
1132-1137 1143-1145 |
|
|
|
Check any run in the November
HALOG.
Settings, Q2= 3.5 GeV2
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Check the corresponding beam energy
for that period.
You can download the header file.
At this setting, a survey of both spectrometers was done:
Left spectrometer:
Vertical offset: -0.48mm
-> yoffset
= -0.00048 m
Pointing: 2.26 mm upstream
-> xoffset
= +0.001921 m,
zoffset =
-0.001190
m
Right spectrometer:
Vertical offset: -0.040 mm
-> yoffset
= -0.00004 m
Pointing: 3.28 mm downstream
-> xoffset
= +0.002823 m,
zoffset =
+0.001670
m