E99007 ,  GEp(II)
 

Run summary, Q2= 5.6 GeV2, first period (11/12 - 11/21)



 
 
 
 
 
 
 
 
 

Date
Run numbers
Helicity (Compton averaged)
Half-wave plate
Number of triggers 
Comments
11/12 - 11/13
1249-1257
1259-1266
1268-1269
71.5
OUT
16.93
 
11/13
1278-1280
1286-1290
71.0
OUT
7.57
 Changed the ADC gate on calorimeter by 32 ns before run 1278
11/13
1292
71.0
IN
0.60
 
11/13
1293
71.0
OUT
1.00
 
11/13 - 11/15
1295-1308
1310-1326
1328-1333
1335-1336
72.5
IN
33.92
 
11/15 - 11/17
1337-1339
1341-1351
1353
1355-1369
1373-1374
1376-1377
70.0
OUT
   
11/17 - 11/19
1378-1380
1382-1400
1402-1404
1406
1408-1425
69.5
IN
   
11/19 - 11/20
1426-1451
1454
1457-1463
70.0
OUT
   
11/20 - 11/21
1464-1472
1474-1488
70.0
IN
18.23

Check any run in the November HALOG.
 
 

Settings, Q2= 5.6 GeV2 ,first period


Check the corresponding beam energy for that period.
You can download the header file.

At this setting, the left spectrometer offsets were calculated using the LVDT:
                        Vertical offset:   -0.34 mm         -> yoffset -0.00034 m
                        Pointing:    2.07 mm upstream     -> xoffset+0.001953 m,   zoffset = -0.000686 m