Run summary, Q2= 5.6 GeV2, second period (12/01 - 12/07)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1585-1591 |
|
|
||
|
1597-1623 1625-1633 |
|
|
||
|
1652-1670 |
|
|
||
|
1699-1703 |
|
|
Check any run in the December
HALOG.
Settings, Q2= 5.6 GeV2 ,second period
At this setting, a survey of the
left spectrometer was done:
Vertical offset: +0.032 mm
-> yoffset
= +0.00032 m
Pointing: 1.93 mm upstream
-> xoffset
= +0.001822 m,
zoffset =
-0.000637
m