9/15 Setup Checklist


           Done 
Item
Y
check that the Hall Aarc B-dL measurement system is running (AES).
Y
data logging script ready
Y
medm "spindance2001" screen ready
Y
data logging database lists ready (add Arc1_MeV, etc.)
Y
MPS BCM current increase signed-off (Kees/Andrew) to 100uA
Y
Hall C access confirmed with Donal
Y
MPS BCM crew ready
Y
RF separator crew ready
Y
laser rf/dc mode switch ready  (Ronnie to install TCP/IP powerstrip)
Y
check of MARC1A setpoint for linac imbalance monitoring
Y
new Hall A Arc energy measurement procedures in place (Arun/Law)
Y
groups notified about weekend security measures
Y
start log of ArcN_MeV prior to midnight
Y
survey Hall C by ~6am for survey/alignment crew