check that the Hall Aarc B-dL measurement system is running (AES). |
|
|
data logging script ready |
|
|
medm "spindance2001" screen ready |
|
|
data logging database lists ready (add Arc1_MeV, etc.) |
|
|
MPS BCM current increase signed-off (Kees/Andrew) to 100uA |
|
|
Hall C access confirmed with Donal |
|
|
MPS BCM crew ready |
|
|
RF separator crew ready |
|
|
laser rf/dc mode switch ready (Ronnie to install TCP/IP powerstrip) |
|
|
check of MARC1A setpoint for linac imbalance monitoring |
|
|
new Hall A Arc energy measurement procedures in place (Arun/Law) |
|
|
groups notified about weekend security measures |
|
|
start log of ArcN_MeV prior to midnight |
|
|
survey Hall C by ~6am for survey/alignment crew |