Short term Runplan
-
Optics studies with 1h elastics singles. Leave spectrometer angles at present
location.
-
Use LH2 15cm target
-
Hadron arm is in negative polarity for electrons. Set hadron momentum to
1.674 with sieve out.
Set electron momentum to 3.956 with sieve in.
-
Do short run to check spectrometers out. The rate for hadron arm should
be about 2 Hz at 40 uA.
You should be able to see elastic. Electron should be able to see sieve
pattern.
-
Put in hadron sieve slit in . Need two hours of data.
-
Next run is with 12C target in same conditions. Take two to three hours
of data. Check if you see the sieve.
-
-
Next is bringing the hadron dipole to zero for the polarity switch. This
takes a while (1-2 hours).
Call tech to come in about 1/2 hour before
-
While hadron field is dropping do a target luminousity scan with the electron
arm using elastics on 1H without sieve.
Start with 1,2,5 ,10 ,20, 30, 40, 50 , increase by 10 until the max current.
Would like at least 50,000 counts.
Keep run less than 30 min but at least 10min.
Then do the same with 12C target.
-
Next set up for thcm=155 ph=180 kinematics. Follow regular run plan.