Second engineering run and production (Fall 03-Winter 04)
November 18th, 03 : loss
gain during 03 hall C regular configuration (measured with cosmics)
(addentum light
guide yellowing, Sept 04 )
December 4th,03 : loss
gain during 03 hall C regular configuration (measured with proton
signals)
December 12th,03 : HV
changes to align pion
March 11th, 04 : gain
lost between January 04 and March 04
April 01st, 04 : gain
lost between March 19th and April 1st
April 06th, 04 : gain
change for 4-11-fr (new base) and new gain loss evaluation
May 1st, 04 : PMT
gain lost :changes to be made before running AL frame
followed by May 2nd, 04 : HV
changes
End of the forward production run :
The programs I used for the online analysis are
under CUE:~jroche/g0/g0-online/fastbus/gofar
The HV files used during the forward angle
measurements are under
this link.
Backward angle running :
July 1st, 04 : Gain
change for the backward angle preparation.
July 29th, 04 to August 3rd,04 : Cosmics data taking : report
with some more
precisions