Privacy and Security Notice

J. Roche's page on G0 last update  08/09/04  

First engineering run  (Fall 02)
January 29th,03 :  gain tracking through out the run

Second engineering run and production (Fall 03-Winter 04)

November 18th, 03 : loss gain during 03 hall C regular configuration (measured with cosmics)
                            (addentum light guide yellowing, Sept 04 )
December 4th,03 :  loss gain during 03 hall C regular configuration (measured with proton signals)
December 12th,03 : HV changes to align pion
March 11th, 04 : gain lost between January 04 and March 04
April 01st, 04 :  gain lost between March 19th and April 1st
April 06th, 04 : gain change for 4-11-fr (new base) and new gain loss evaluation
May 1st, 04 : PMT gain lost :changes to be made before running AL frame
                       followed by May 2nd, 04 : HV changes

End of the forward production run :

    The programs I used for the online analysis are under CUE:~jroche/g0/g0-online/fastbus/gofar
    The HV files used during the forward angle measurements are under this link.

Backward angle running :  
July 1st, 04 : Gain change for the backward angle preparation.
July 29th, 04  to August 3rd,04 : Cosmics data taking : report  with some more precisions