Privacy and Security Notice

J. Roche's page on G0 last update  01/25/06

Main page

                                 Julie Roche's   page on
 

The A-Team was in charge of preparing software for the next G0 running.  The projects were : quasi real time automated run summary  (K. Nakahara & J. Roche,  run_summary template ), data taking  summary based on the data base results (B. Guillon) template , graphical interface with the data base  (K. Grimm & J. Roche & J. Liu) (manual), analysis shift instructions : analysis shift taker vademecum (the tex files), shift worker instruction : how_to_for_shift_taker, automated replays (P. King), Franco-American detectors analysis (P. King, D. Marchand, J. Liu), data base setup / maintenance (D. Spayde)


                       

 
 
G0-03-015, G0-03-055, G0-03-093, G0-04-054, G0-05-013 : Forward angle analysis status report.
G0-04-001 : The G0 collaboration  (J. Roche : principal editor) : Results from the G0 Engineering Runs (Answers to the JLab management's  questions).
G0-03-105 : Information to Establish the Radiological Safety Analysis Document (RSAD) for G0 Running in Fall 2003 and Spring 2004.
G0-03-104 : Conduct of Operations (COO) for Hall C Experiment E00-006.
G0-03-103 : Experiment Safety Assessment Document (ESAD) for the forward angle phase of the G0 experiment.
G0-02-071 : Tests of the G0 North American Focal Plane Detector
G0-02-027 : The G0 Experiment: Measurements of the Strange Form Factors of the Proton
                        (A report submitted to the Baryon '02 Conference)
G0-01-012 : Experimental Background Contributions to the G0 Backward Angle Measurements
G0-00-036 : Estimation of PI-plus Rates for the G0 Forward Measurement Using SOS Data  
G0-99-032 : Status Report of the G0 Detector 8 Prototype Studies