udated 12-07-03 00:20 #Hook NA cfd outputs to scalers. For each setting take 10 mn of data : #nominal threshold : 40,30,20,10,5,15,25,35 uA beam #threshold=0.75 *threshold : 40,30,20,10 uA (0.75 need to be confirmed by Angela) # This test cannot be done this night because it has not been arranged with MCC yet : skip using diode beam and nominal threshold repeat the scan !!! attention !!! this require a special beam, need to be coordinated with MCC before hand, contact RC before requesting that to MCC. #un-hook NA cfd output from scalers (all runs with no fastclear on fastbus) #take 45 mn runs at 4 different current #take 1 hour run with some of the cfd delays set at 8ns instead of 10 ns (to check that the timing resolution is not worst with the delay of 10 instead of 8ns) #take 1 hour of proton gain *5 with the same threshold to measure single rates. request no more than 8 uA beam. (HV file = HV.halfgain_time_five_2nd_engineering_run_2nd_iter_alloct_a.hvc) if you have trouble with the french tube tripping in over current, consider turning them off for this test do not forget to reload the normal gain HV. (HV file = HV.halfgain_2nd_engineering_run_2nd_iter_alloct_a.hvc) at the end of this test