| D. Crabb | Polarized Target: Status (Oxford and Genoa): Coils reached 5.04 T but detrained. Will probably have to be rewound. Setback of at least 2 additional weeks (my estimate). Target won't be here before April. BAD! Also: Target stick design - to be discussed in upcoming target meeting. | |
| D. Kashy et al. | Target + Beamline design work at JLab - Status: Showed drawings for Banjo entrance and exit windows, large vacuum exit window, installation drawings. Some discussion on interface between exit window and shielding pipe. Main items in the near future: Final numbers from target stick design, and discussion with alignment group. | |
| S. Kuhn, V. Burkert, D. Branford | Additional beam line issues: Derek reported on progress for correction steerers in the region behind CLAS. We all voted to proceed building them. Volker and Fernando Barbosa reported on Rastering progress. Sebastian reported on work in progress to read out BPMs at 30 Hz and to characterize Møller and Mott background. Full simulation in progress at UVa. | |
| B. Raue, L. Kramer | Møller Update: Foils polarized, everything on track for simple first test in March. Some discussion on absolute normalization, backgrounds etc. | |
| S. Kuhn | Runplan, Schedule: Schedule is now very likely to slip. Showed some simulations of count rates and acceptance. |