Privacy and Security Notice

e94104_checklist

E94104 Shift Checklist

Date and Time
          
          
          
          
          
Your Name
 
 
 
 
 
Beam Energy (GeV)
 
 
 
 
 
Beam Energy Lock  on?          
Beam Current (µA)          
Spot x×y (mm)
 
 
 
 
 
BPMB x/y (< 0.3 mm) 
 
 
 
 
 
Fast FB ON?           
Argon Pres.(PSI)
  
       
Ethane Pres.(PSI)          
CO2 Pres.(PSI)          
RIGHT  VDC Gas Flow(T/B)
 
 
 
 
 
LEFT VDC Gas Flow(T/B)          
RIFHT VDC HV(T/B)
 
 
 
 
 
LEFT VDC HV(T/B)          
RIGHT Angle(deg)
 
 
 
 
 
LEFT Angle(deg)          
RIGHT P0(GeV/c)
 
 
 
 
 
LEFT P0(GEV/c)          
RIGHT Quad #1 (T/A)
  
  
  
  
  
RIGHT Quad #2 (T/A)          
RIGHT Dipole (T/A)           
RIGHT Quad #3 (T/A)          
LEFT Quad #1 (T/A)
 
       
LEFT Quad #2 (T/A)          
LEFT Dipole (T/A)          
LEFT Quad #3 (T/A)          
(To be continued)

E94104 Shift Checklist

(Continued)
RIGHT Cryo Level OK?
(He>60%,N>25%) 
          
          
          
          
          
LEFT Cryo Level OK?
(He>60%, N>25%)
         
RIGHT S1 HV OK? 
 
 
 
 
 
RIGHT S2 HV OK?          
RIGHT GAS C HV OK?          
RIGHT AM HV OK?           
RIGHT Preshower HV OK?           
RIGHT Shower HV OK?           
LEFT S1 HV OK?
 
 
 
 
 
LEFT S2 HV OK?          
LEFT GAS C HV OK?          
LEFT A1 HV OK?          
LEFT A2 HV OK?          
LEFT PR HV OK?          
RIGHT Collimator
 
 
 
 
 
LEFT Collimator          
Target in use
 
 
 
 
 
Target Temperature(K) LD2/LH2          
Target Pressure(PSI) LD2/LH2          
Fan Frequency(Hz) LD2/LH2          
Radiator
 
       
Latest Run Number
 
       
Computer Deadtime
 
       
Prescales 1/2/3/4/5
 
 
 
 
 
Event Rates 1/2/3/4/5  
 
 
 
 
Visual Hall Inspection OK?