Veto Progress Checklist

Veto Progress Checklist

Here is the checklist:

  1. Timing - DONE
  2. Position reconstruction (x,y) - DONE
  3. Time walk correction - 95%
  4. ADC calibration/ energy reconstruction - 50%
  5. Charged-particle efficiency - DONE
  6. Neutral-particle detection probabilty - DONE
  7. Integrated with HYCALCLUSTER bank - DONE
  8. Tested with compton analysis - 0%
  9. Simulation with charged- and neutral-particle detection probabilities - 5%

Notes

Regarding the time walk correction, the coding is complete. I want to check it one last time for completeness.

I have not started any compton analysis and need to talk with Yelena about this test.

I have started to run the standard Primex simulation package "primsim" to see how to incorporate the experimental charged-particle efficiency and neutral-particle false-veto probability.

The compton analysis and simulation work are my highest priorities.