| Item | Task | Log Entry | ||||||||||||||||||
For a beam energy of 3.245 GeV set the spectrometers to:
Input HMS momentum in GeV, electron is negative. -1.425 Set current for Q1 = 185.00952510844 amps Set current for Q2 = -147.00558385297 amps Set current for Q3 = 72.196281624747 amps Set NMR for Dipole = -0.39049801783945 Tesla
|
||||||||||||||||||||
| Ask for 10 uA beam. Determine SOS 3/4 rate and then increase current such as to give 600kHz SOS 3/4 rate. 30 uA should be possible. | ||||||||||||||||||||
| Take a short run. Adjust prescale factors such that HMS and SOS singles rates are approx. 5% each. Determine deadtime for this setting. | ||||||||||||||||||||
| Take runs with 1M triggers. |
| Hall C Operating Manual | |
| Last updated 11/19/99
By Jörg Reinhold(reinhold@fiu.edu) |