| Item | Task | Log Entry | ||||||||||||||||||
For a beam energy of 3.245 GeV set the spectrometers to:
cdaqs1> ~cdaq/FIELD/field99 Input HMS momentum in GeV, electron is negative. -1.540 Set current for Q1 = 199.95106908699 amps Set current for Q2 = -158.89101504061 amps Set current for Q3 = 78.043998185057 amps Set NMR for Dipole = -0.42201189296333 Tesla
|
||||||||||||||||||||
| Ask for 10 uA beam. Determine SOS 3/4 rate and then increase current such as to give 600kHz SOS 3/4 rate. 30 uA should be possible. | ||||||||||||||||||||
| Take a short run. Adjust prescale factors such that HMS and SOS singles rates are approx. 5% each. Determine deadtime for this setting. | ||||||||||||||||||||
| Take runs with 1M triggers. |
| Hall C Operating Manual | |
| Last updated 11/19/99
By Jörg Reinhold(reinhold@fiu.edu) |