| Item | Task | Log Entry |
| 1 | Install Aerogel beetwen S2Y & S2X; record position with respect to scintillators. | |
| 2 | Hook up HV and signal cables; record in log book. | |
| 3 | Modify HV file and backup. | |
| 4 | With low trigger threshold measure 1 P.E. peak for each tube with SOS momentum set to +1 GeV/c and +1.56 GeV/c. If peak position changes measure also in steps of 0.1 GeV/c from 1 - 1.5 GeV/c. | |
| 5 | If necessary, adjust gain (HV) according to 4, in order to match the 1 P.E. peaks. | |
| 6 | Run cosmic tests. |
Last updated 10/17/99
By Jörg Reinhold(reinhold@fiu.edu)