Privacy and Security Notice

Control of Equipment and System Status next up previous contents
Next: Equipment and Piping Labeling Up: Operating Procedures Previous: Scheduling of Work by

Control of Equipment and System Status

The operation of the experimental equipment is documented in the Hall C Experimental Equipment Operations Manual. This document includes information on the normal response to alarms and equipment malfunctions. Supplementary information specific to experiment E91-016 may be found in the ESAD.

The document ``Personnel Allowed to Operate Hall C Equipment'' lists the authorized subsystem experts. This list may be amended as necessary to reflect personnel and training changes with the signed authorization of the subsystem expert. A copy of these amendments will be attached to the main document and kept in the Counting House.

All general equipment installation, maintenance, and testing activities are to be carried out in accordance with the JLab EH&S Manual.



 

Joerg Reinhold
9/7/1999