Privacy and Security Notice

Independent Verification next up previous contents
Next: Logkeeping Up: Operating Procedures Previous: Equipment and Piping Labeling

Independent Verification

The Run Coordinator will provide the shift crew with a set of measures for checking the quality of the experimental data. The up-to-date Hall C shift checklist (and instructions) shall be made available to shift personnel at hall-specific sites on the data acquisition computers. The checklist will be completed at least once per shift during operating shifts and once per day during standby shifts. Additional items may be added to the list by the Run Coordinator or subsystem experts.

The Hall C Experimental Equipment Operations Manual provides more general check lists for closing the experimental Hall and conditions when the Hall is used as an accelerator dump.



Joerg Reinhold
9/7/1999