Run Date E PHMS $\Theta_{HMS}$ PSOS $\Theta_{SOS}$ Target 3ccounts [k] Book Comments    
    [GeV] [GeV/c] [deg] [GeV/c] [deg]   HMS SOS COIN    
13p10cmSOS A1 HV restored to its obviously wrong value for consistency (XI-102); un fortunately not corrected later                        
10834 9/29 3.245 -1.593 15.47 +1.240 19.92 4cmLH2     250 XI-105 aerogel veto still removed
10835 9/29 3.245 -1.593 15.47 +1.240 19.92 4cmLH2 124 110 99 XI-105 aerogel veto in
10836 9/29 3.245 -1.593 15.47 +1.240 19.92 4cmLH2 480 467 425 XI-105 S2Y8+ has no data
10837 9/29 3.245 -1.593 15.47 +1.240 19.92 4cmLH2 536 522 475 XI-105  
10838 9/29 3.245 -1.593 15.47 +1.240 19.92 4cmLH2 568 553 502 XI-105  
13p10cmfixed S2Y8+ (XI-106): changed wiring at splitter; modified MAP; new MAP is cdaq/online-aug96/MAPS/aug96.map.10839; changed SOS thresholds; from now on changes of SOS thresholds are dangerous                        
10839 9/30 3.245 -1.593 15.47 +1.240 19.92 4cmLH2       XI-106 test run; partly pulsed beam
10840 9/30 3.245 -1.593 15.47 +1.240 19.92 4cmLH2 656 639 580 XI-109  
10841 9/30 3.245 -1.593 15.47 +1.240 19.92 4cmLH2 489 476 434 XI-109  
10842 9/30 3.245 -1.593 15.47 +1.240 19.92 4cmLH2 150 146 132 XI-109  
10843 9/30 3.245 -1.593 15.47 +1.240 19.92 4cmLH2       XI-109 bad run (MCC problems)
10844 9/30 3.245 -1.593 15.47 +1.240 19.92 4cmLH2 655 638 581 XI-109  
10845 9/30 3.245 -1.593 15.47 +1.240 19.92 4cmLH2 239 249 211 XI-111 HMS hodo HV died at end
10846 9/30 3.245 -1.593 15.47 +1.240 19.92 4cmLH2 381 371 338 XI-111 MCC corrects beam position during run
10847 9/30 3.245 -1.593 15.47 +1.240 19.92 4cmLH2 639 622 567 XI-111  
10848 9/30 3.245 -1.593 15.47 +1.240 19.92 4cmLH2 746 726 662 XI-111  