Privacy and Security Notice

 
 

Jefferson Lab Experiment E91-016

Superharp Scan


Item Task check\
Log Entry
1 Make sure there is no target in the beamline.  
2 Request beam with 2 uA and Fast Raster OFF.  
3 Take scans with superharps 3H00 and 3H00A.  
4 Verify that the beam size is as expected: sx= 80 um, sy = 150 um.  
5 Request Fast Raster ON: dx=+- 1 mm, dy=+- 1 mm  
6 Take scans with superharps 3H00 and 3H00A.  
7 Verify raster size  
8 Take a short run and verify that the FR and BPM signals are in the data acquisition. Verify the BPM calibration.  
Hall C Operating Manual
Last updated 11/4/99
By Jörg Reinhold (reinhold@fiu.edu)