Here are various versions of the G0 installation plan:
Revision 2 of the Sept. ferris wheel and octant installation plan (9/10/01)
2002 dedicated installation plan, latest version, (7/8/02).
2002 dedicated installation plan, old version, (5/7/02).
2002 dedicated installation plan, old version, (4/1/02).
2002 dedicated installation plan, March 4 start date version, (3/12/02).
2002 dedicated installation plan, March 5 start date version, (2/21/02).
2002 dedicated installation plan, March 5 start date version, table format (2/21/02).

Here are some pictures of G0 after installation in Hall C:
Picture of G0 after installation, with the ferris wheel separated from the magnet. (~7/11/02)
Picture of G0 after installation. (10/17/02)
Another picture of G0 after installation. (10/17/02)
Picture of G0 after installation, showing SMS, FW, & C-can platform, etc. (10/17/02)
Picture of the G0 girder. (10/17/02)
Side view of G0 after installation, with the FW pulled a little downstream from the SMS. (10/17/02)
Shot of the 24" gate valve downstream of the FW. (10/17/02)
The downstream vacuum window spool piece just in front of the dump tunnel. (10/17/02)
The Pb/polyB shielding on the SMS exit windows. (10/17/02)

Here are some pictures of G0 during installation in Hall C:
Picture of the SMS arriving at JLab on the superload truck (3/25/02)
Picture of the magnet being lifted onto its stand with jacking towers (3/29/02)
Picture of the magnet on its stand at JLab (3/26/02)
Mike Fowler's 3d, shaded view of G0 in Hall C with the SMS platform, C-can platform, gate valve & dump shielding (9/5/01)
FW signal patch panel from the upstream side, ie the 40' connections. (10/22/01)
FW signal patch panel from the upstream side, ie the 40' connections, along the width of the FW. (10/22/01)
FW HV slack storage + laser box. (10/22/01)
FW patch panels from the downstream side, with one happy camper. (10/22/01)
Closeup of French octant cabling, straight up. (10/22/01)
Closeup of French octant cabling. (10/22/01)
Closeup of French octant cabling. (10/22/01)
Top 3 octants, a nice shot.
Whole FW with scaffolding, looking upstream. (10/22/01)
Articulated cable tray. (10/22/01)
Whole FW looking downstream. (10/22/01)
Preliminary G0 layout in Hall C
Preliminary G0 layout in Hall C, fat shielding wall version
Preliminary G0 layout in Hall C, zoom of the cave, version 3: 5/17/00
Preliminary G0 layout in Hall C, full view of the hall with the cave, version 3: 5/17/00
Quasi-final G0 layout in Hall C, prettied up zoom of G0 area. 8/9/00
PS file of 1st readiness review writeup for installation & infrastructure. 8/9/00. Note Brindza's 2 page G0 installation pert is not part of this PS file, it's attached by hand.
Latex source file of same. 8/9/00.
Drawing of the downstream spider for the heat exchanger. 2/23/01.