 |
Picture of the SMS arriving at JLab on the superload truck (3/25/02)
|
 |
Picture of the magnet being lifted onto its stand with jacking towers (3/29/02)
|
 |
Picture of the magnet on its stand at JLab (3/26/02)
|
 |
Mike Fowler's 3d, shaded view of G0 in Hall C with the SMS platform, C-can platform, gate valve & dump shielding (9/5/01)
|
 |
FW signal patch panel from the upstream side, ie the 40' connections. (10/22/01)
|
 |
FW signal patch panel from the upstream side, ie the 40' connections, along the width of the FW. (10/22/01)
|
 |
FW HV slack storage + laser box. (10/22/01)
|
 |
FW patch panels from the downstream side, with one happy camper. (10/22/01)
|
 |
Closeup of French octant cabling, straight up. (10/22/01)
|
 |
Closeup of French octant cabling. (10/22/01)
|
 |
Closeup of French octant cabling. (10/22/01)
|
 |
Top 3 octants, a nice shot.
|
 |
Whole FW with scaffolding, looking upstream. (10/22/01)
|
 |
Articulated cable tray. (10/22/01)
|
 |
Whole FW looking downstream. (10/22/01)
|
 |
Preliminary G0 layout in Hall C
|
 |
Preliminary G0 layout in Hall C, fat shielding wall version
|
 |
Preliminary G0 layout in Hall C, zoom of the cave, version 3: 5/17/00
|
 |
Preliminary G0 layout in Hall C, full view of the hall with the cave, version 3: 5/17/00
|
 |
Quasi-final G0 layout in Hall C, prettied up zoom of G0 area. 8/9/00
|
 |
PS file of 1st readiness review writeup for installation & infrastructure. 8/9/00. Note Brindza's 2 page G0 installation pert is not part of this PS file, it's attached by hand.
|
 |
Latex source file of same. 8/9/00.
|
 |
Drawing of the downstream spider for the heat exchanger. 2/23/01.
|