Privacy and Security Notice

Background Determination

Background Determination


Progress So Far

  1. Verified elastic kinematics are correct in the simulation (4500 and 5000 A)
  2. Extracted elastic peak proton timing for detector 9 from data using three gaussian fit (run 16136 octant 2)
  3. Extracted elastic peak proton timing for detector 9 from simulation using three gaussian plus zeroth order polynomial fit

Page maintained by Damon Spayde (spayde@jlab.org).
Last updated on 13 October 2003.