status of Forward Tracker 3/12/2008



1.) Chamber:
We have used our manual milling machine to build another 10 cm x 10 cm prototype detector while waiting for our CNC time to machine the gasket tranches for the final Qweak detector.
The CNC machine has been used to mill two gasket trenches for the final Qweak detectors.
Both gaskets
One gasket
The CNC machining was a bottleneck to constructing that has been overcome.
CERN has received our final charge collector design and is able to read everything. I have asked for a quote and I need to have a final check before CERN fabricates the charge collector.


2.)Readout electronics
I communicated with Walter Snoey reguarding a delivery date for the VFAT boards. He metioned the end of March as a date where CERN will be performing final tests. The hope is to have a shipment arrive at ISU in May. We will then incorporate the boards into our DAQ system and prepare for beam tests during the summer. I still wory about the arrival date for the boards.
3.) rotator LaTech report


Tony Forest