status of Forward Tracker 7/14/2005



1.) Readout:
Configuring I/O card to initialize Helix board registers to default values.


2.) Detector
Completed installation new 2-D charge collector into 1st prototype detector. Will install GEM foils and cathode today and test detector next week.

3.) Detector rotator apparatus
The Model 80111 Omnidirectional Lever has arrived and is being installed. Software has been established to increment a counter whenever switch is depressed so the number of teeth can be counted =>(0.1 mrad angle positioning accuracy). We are now searching for an enclosure for the power supply and controllers. The majority of the detector positioning infrastructure should be completed by August. A control GUI to work through EPICs and more encoding elements will still need to be worked on.
A manual for the installation and operation of the Rotator has been started. It details the components of the system for installation at JLAB and the operation of the control system software.


Tony Forest