Jindong and Xiaofeng made new RTD connector for the oven
three-wire connection is used to reduce the lead wire resistance
Oven controller  Pin#(connector upstairs) Pin#(connector downstairs)  RTD leg 
-E  white wire   C   5   c
-S  balck wire  B   7   a
+E,+S red wire  A   1   b
Kevin's tips:
Don't using  cupper wire with red coating. The coating will turn black in high temperature. Using wire   with golden coating instead. For the connector near the pumping chamber, don't using any connector with pins made of stainless steel. Using the special connector made by Sasha.
RTD for the oven is replaced with a new one.

Pavel helped to fixed the problem for epics controller. The oven system  and the helicity motor are ready.
 

VME serail card port# Devices:
2 helcity motor
4 target motor
5 (baudit rate:9600, no parity check!!!) oven controller
 
10/22/2001
Jindong and Vince finished the wall thickness measurement for the 40cm water cell.

EPICS controls for the target moter and half wave plate motor are ready. But the home position need to be recalibrated.

Except for the oven RTD, the oven system is ok.

Kevin finished the  replay of the carbon quasi-elastic data 9, run#2486-2620.




10/18/2001
 
If you want to see beautiful plots of the large coil field calibration done by Vince, click here.

Vince and Jindong started wall thickness measurement for the 40cm water cell.

Javier helped to fix the problem with the GUI for He3 target control.
    To start the GUI:  login in pinky first. Then type "/94010/epics/hlamain_web "

After three days'  sweating,  the network printer PHYHP6 was finally configed onto the 2 NT machine in target lab.




10/17/2001
 Vince did two  good water calibrations on 25cm water cell.  However, we haven't got good Q-curve signal yet.

The interlock for the Opto-power laser in the laser hut is setup with help from Mark Taylor, and checked by Vince.

The connection for the oven heating system is  ok now. Al found new connectors for the heating gas flow.

EPICS remote control system:
      IOC26,  used in the  hall during the  A1/g2 experiment,  has been moved out of VME crate, and kept in the cabinet upstairs for the future experiment .
      IOC23, used in the laser lab before the experiment, is inserted in the VME crate .( IP: 129.57.36.129)
      We still need sometime to get the epics-gui work.



10/15/2001
 The LCD display for kepco4  works again. This morning, Vince turned on its  power , and the LCD  worked . However,  We emailed the manufactor about the problem what happened last week.

50GByte disk on Pinky is available. You can mount it to your local machine by typing:  "mount -tnfs pinky:/94010 /mnt"

The Oven heating system is almost ready, and it will be checked by Al tomorrow.

Tomorrow  morning, Pavel will help to setup the epics control system in the target lab.

Vince did very good water calibration in the weekend.


 



10/12/2001
 
Vince  finished field calibration for the small helmholtz coils. See the  fitting result   . The water cell  is ready to install for calibration,  and the pickup coils has been tested.

Jindong will continue the study for RF coil calibration, trying different capacitors settings.

Al installed the new pipe for the heating system.

One copy of the  experimental logbooks  were shipped to Kentucky.




10/11/2001
 
Todd  helped to check the Kepco3 power supply. it still works for current output. However, the LCD display is broken.We need to contact the manufacturer, since it is still under warranty.

Next Wednesday morning, Mike Taylor will come for the interlock system for the laser lab.

Kevin did  effciency study for VDC  and scintillators studies.
 


10/10/2001
 

Kepco3  ,  the power supply for the large coils , has some problem. We checked the cable connection,  and it was ok. But it just does not work. ????

Kepco4 is working well.  We started warming up the small coils, and  planned to do the field calibraion tomorrow.
Jindong finished calibration for the RF coil.

Vince and Xiaofeng installed the mirrors for the target chamber.

Vince  removed the Q-coil, and is going to make a new one.

Vince finished the wall thickness measurement of GORE. The  results are well agreed with the summer data.

10/09/2001
 
 Vince and Xiaochao started optic alignment . Vince and Jindong also started density measurements of target cell :GORE.

 Jindong finished modification of the connection box for the RF current monitoring.

  Xiaofeng checked the pedstals history files, which contain the pedstals's centers  after each pedstals' run. From June to Sept, there are no obvious pedstals shifts during A1/g2 's running . The shift of  starting channels in the adc spectra comes from the fitting during the pedstals' run.
 


10/08/2001

Xiaofeng modified header files for espace, the geometric corrections for the spectrometers were added. The new header file and their location are :
 hdr_12c_qe_l
 hdr_12c_qe_r
 hdr_pol3He_0_l
 hdr_pol3He_0_r
hdr_pol3He_1_r
 hdr_pol3He_1_l
hdr_pol3He_2_l
 hdr_pol3He_2_r
 hdr_pol3He_3_r
hdr_pol3He_3_l
 hdr_pol3He_4_l
 hdr_pol3He_4_r
 hdr_pol3He_5_r
 hdr_pol3He_5_l
 hdr_pol3He_el_r
/w/work502/e97103/pinky/espace
Kevin showed Vince and Jindong the labview software.
Kevin checked the connection for  RF current monitors, and suggested modifications for connection box.

10/05/2001
 

  • Target lab status:
  • Helmholtz coils were connected, new 10AWG cables for the mutlimeters was made. Connection downstairs was checked by Kevin.
  • Vince is ready to clean the optics and start  alignments. Posts are already been setup with help from Xiaochao.
  • Al will make a new set  frames for pickup coil , with modified dimensions .
  • Jindong started "labview".
  • Analysis
  • Xiaochao did  study on the asymmetry of cut dependency for A1.
  • To study  cutting on beam ramping, scipts to add  beam current ( extracted from scaler event)  to detector events for g2 is prepared by Xiaofeng.
  • Nilanga updated  espace  code, so the event_time and beta were added to variable list in the CWN ntuple.
  • Tasks  in the coming week:
  • Kevin will  show to Vince and Jindong the labview software.
  • The VDC and scitillator efficency study , by Kevin.
  • BPM information and database for the second replay,  By Nilanga and Bodo.
  • Holding field calibrations by Vince and Kevin.
  • Install oven system and get target ready for water calibration by Vince, Xiaofeng and Al
  • Clean optic component and align the optics ,  by Vince and Xiaochao.
  • Shower counter and pion rejector calibraions ,by Xiaofeng and Xiaodong
  • update header files for espace,  by Xiaofeng and Nilanga
  • RTDs and the epis software, by Xiaofeng and Jindong
  •  


    10/02/2001
     
  • Target lab status:
  • Local control for target ladder motor is ready. Jindong found loose connections for the limit switches, and fixed it.
  •  Optical table has been moved to the proper position. The jack was borrowed from FEL yesterday, and returned back today. (FEL contact person: Gubeli, Joe ,  phone 7862, pager 989-4229)
  • Cable list has been updated to include the latest changes made in the hall and laser lab.  The pin maps for the connectors are also done.
  • Vince finished the inventory of items in the target lab.
  • Pick up coils is prepared by Vince.
  • Jindong made extension  cables for the  I-meter.
  • Al came to install and fix one of the pipe for the heater,  but we still need time to make  the other pipe.
  • e97103
  • backup file from adaql1. If there is anything necessary to be backup, please send me an email.
  • espace source code (/adaql1/home/espace) was copied to /w/work502/e97103/espace_src
  • the analysis program and parameter files  under  was copied to /w/work502/e97103/espace
  • For optical study, Survey  of spectrometer  :
  •  left arm ( degrees) right arm( degrees)
    Central ray  Central ray after correction Central ray  Central ray after correction
    Aug  2nd,   kin#1,2  18.620 18.598 -18.592 -18.603
    Aug 12th,   kin#3,4 15.822 15.803 -15.798 -15.809
    Sep. 17th,   kin#5 18.606 18.601 -18.585 -18.603
  • The scaler array in the Column Wised Ntuple file  was checked with data  from  run3313 for left arm and run31313 for right arm, , which is correctly listed  corresponding to the  scalermap in the  raw data structure


  • 9/27/2001 Target group weekly meeting
    Item Project Person in charge Status Comments
    1 set up target motor Xiaofeng,Jindong done local control only
    2 pick up coils Vince  done  
    3 NMR system Vince, Xiaofeng  done  
    4 Helmholtz coils,RF coils Vince  done power supplies, I-meter
    5 Field calibrations Vince, Kevin done 
    6 install water cell Vince  done  
    7 Q-coil Vince  done  
    8 water signal Vince  done  
    9 study water signal Vince done  with phase changes 
    10 move optical table Xiaofeng, Jindong  done  
    11 oven/air/heating system Xiaofeng, Jindong  ready need test 
    12 optical system, start with alignment laser Vince, Xiaochao   one transverse path  finished 
    13 install pol3he cell Vince   start with a low quality cell
    14 RTDs Xiaofeng, Jindong    
    15 alignment Vince    
    16 spin up test Vince    
    17 setup EPR Xiaofeng, Jindong    
    18 EPR test Xiaofeng, Jindong    
    19 change to a good cell Vince   bush/sally
    20 test to maximum polarization Vince    
    21 more tests : H1 measurements, temperature tests ... Vince, Xiaofeng, Jindong   loss , rotation, masing, diffusion
    22 cell study Vince    
    23 density/wall measurement Vince, Jindong   Gore  wall thickness is done. 
    24 transverse pumping ( lasers? )    
    25 epr study ( lasers? )   both longitudinal and transverse
    26 field feedback study ( lasers? )