CABLE_TRAYS_3

12GeV Design Tasks

CLAS 12GeV Design and Engineering Schedule

[Sep 18 2012]  [Sep 27 2012]

HTCC_4_HTCC (HIGH THRESHHOLD CHERENKOV DETECTOR) (wiki)

 

R3_MAGNET_CART_2_DRIFT CHAMBER STRINGING FIXTURES: (wiki)

REGION 1

REGION 2

REGION 3

Related specification:

SPT-0000000-S-0015_revC

 

ELEC_RACK_SPACE_FRAME_3_PRE-SHOWER CALORIMETER

 

ELEC_RACK_SPACE_FRAME_3_LTCC

 

_FORWARD TIME OF FLIGHT

 

TORUS_5_TORUS

 

IC_AIR_SPACE_1_FORWARD TAGGER

 

 

ELEC_RACK_SPACE_FRAME_3_RACKS & CABLES

 

 

HTCC_ctof_section_4_CENTRAL PMT COORDINATES

Abbreviated list:   _________________List with +/- 2cm:

_

 

_SUPPORT STRUCTURES