July 2008 WBS 1.04 Budget vs Spending Graphs
WBS 1.04 Accelerator Rollup without Power/Cryogens
WBS 1.04.01 Accelerator Leadership
- WBS 1.04.02 Beam Delivery without power/cryogens
- WBS 1.04.02.002 Real Time Support & Repair (RSR)
- WBS 1.04.02.003 Accelerator Power
- WBS 1.04.02.004.001 Helium
- WBS 1.04.02.004.002 Liquid Nitrogen
WBS 1.04.03 Accelerator Maintenance & Improvements
- WBS 1.04.03.001 Accelerator Preventative Maintenance
- WBS 1.04.03.001.001 APM - Beam Physics/Optics (APMBPH)
- WBS 1.04.03.001.002 APM - Control System Software (APMSFT)
- WBS 1.04.03.001.003 APM - CHL
- WBS 1.04.03.001.004 APM - ESR (APMESR)
- WBS 1.04.03.001.005 APM - DC Power & Magnets (APMDC)
- WBS 1.04.03.001.006 APM - Facilities (APMFAC)
- WBS 1.04.03.001.007 APM - Installation (APMINS)
- WBS 1.04.03.001.008 APM - Instrumentation Control & Diganostics (APMIC)
- WBS 1.04.03.001.010 APM - RF Systems (APMRF)
- WBS 1.04.03.001.011 APM - Safety Systems (APMSAF)
- WBS 1.04.03.001.012 APM - Source (APMSRC)
- WBS 1.04.03.001.013 APM - SRF (APMSRF)
- WBS 1.04.03.001.0014 APM - Survey & Alignment (APMSRV)
- WBS 1.04.03.001.015 APM - Vacuum (APMVAC)
- WBS 1.04.03.001.016 APM - Infrastructure (APMINF)
- WBS 1.04.03.001.017 APM - Other (APMOTH)
- WBS 1.04.03.001.018 APM - ESR C2 Compressor Motor (APMC2)
- WBS 1.04.03.001.019 APM - Diagnostics (APMDIA) WBS 1.04.03.002 Accelerator Improvements (AIM)