G0 Backward Angle Run 2006
Meetings
Documents
- Beam Parameter
Specifications for G0 Backward Angle Run, 10/7/05 (PDF)
Hall C
- Modification of
Hall C Moller polarimeter spectrometer (Q1)
- Modification of
Hall C quadrupole configuartion (3C18-20)
- Hall C safety
platform for cyrogenic can access
- HKS beamline
deinstallation
- HKS spectrometer
degaussing
- Hall C Halo and
G0 girder installation
- Hall C beam dump
integrity
Accelerator
- Polarized source
setup
- Parity quality
beam measurement and feedback systems
- Injector
matching at low beam energy
- Accelerator
operation at low beam energy
- Extraction to
two halls at low beam energy (summer '06)