Injector
Group Picture Pages
Photo album of many source group
photos
File Name |
Discription |
Date |
Size |
Laser Table Setup |
05-25-97 |
85K |
|
Some of the Polarized
Source Team |
05-25-97 |
241K |
|
The 3 Laser System Table #1 |
05-25-97 |
218K |
|
The 3 Laser System Table #1 |
05-25-97 |
196K |
|
The 3 Laser System Table #1 |
05-25-97 |
215K |
|
The Polarized Source #1 |
05-25-97 |
269K |
|
The Polarized Source #2 |
05-25-97 |
293K |
|
The Polarized Source #3 |
05-25-97 |
263K |
|
The Polarized Source #4 |
05-25-97 |
245K |
|
Floating Pico Ammeter |
April 1999 |
Page |
|
Group Pictures from April
1999 |
April 1999 |
Page |
|
Group Pictures from April
1999 |
April 1999 |
Page |
|
Laser Pictures from May 03,
1999 |
May 1999 |
Page |
|
Pictures from Paul's Photo
Cathode Preperation |
September 15, 2000 |
Page |
|
Pictures from Gun 2
Re-Build |
October 5, 2000 |
Page |
|
Pictures from Test Cave Gun
Dis-assembly |
October 26, 2000 |
Page |
|
Matt and Michael go to Spin
Workshop |
October 2000 |
Page |
|
Pictures from Test Cave Gun
Re-Work |
November 7, 2000 |
Page |
|
Pictures from cathode gone
bad |
January 10, 2001 |
Page |
|
Pictures from Tunnel
Chopper Work |
January 31, 2001 |
Page |
|
Pictures from Tunnel
Chopper Work |
February 2, 2001 |
Page |
|
Pictures from Faraday Cup
Rebuild |
March 20, 2001 |
Page |
|
Pictures from the NEG
coating deposition device |
April, 2001 |
Page |
|
Picture from Mott Foil
Exchange during May 2001 shutdown |
May 5, 2001 |
Page |
|
Layout of G0 optical
components from May 2001 test |
June 5, 2001 |
Page |
|
John installing the New
& Improved Multi-Laser/G-Zero Table |
September, 2001 |
Page |
|
Best Technology Load-lock
Polarized Electron Gun |
January 14, 2002 |
Page |
Site maintenance performed on September
15, 2008
Maintained by marcy@jlab.org