Safety Documents

Title

Serial Number

Issue Date

Expiration

CEBAF

CEBAF Injector Laser Cleanroom

A09-001-LSOP

2June09

2June12

Injector Test Stand: bld 58 Rm 127-129

Field Emission Measurements at the North Cave  

Revised North Cave OSP

ACC-10001.120-OSP

 

ACC-10-031-OSP

28Sept09

revision

17June10

1March12

22Oct12  

High Voltage Electron Gun Operation

ACC-10-018-OSP

31Mar10

31Mar13

Electron Gun Test Stand

ACC-10006-120-LSOP

11Dec09

11Dec12

EEL 118

Facility Safety Overview

ACC-10002.120-OSP

24Feb10

24Feb13

MicroMott Polarimeter

ACC-10009.120-OSP

18Dec09

18Dec12

MicroMott LOSP (Ti-Sapphire)

ACC-12-005-LOSP

2Nov12

2Nov15


 

 

 

 

 

Additional Documents

 

CEBAF: Procedure for Manipulating Photogun High voltage Leads

 

Injector Test Stand

Electronics

ITS electronics summary

FETS electronics summary

South Cave, Rm. 127 (South)

Laser Interlock Operating Procedures

Laser Interlock Photos

 

Source Laboratory - EEL Bldg. 98, Rm. 118

MicroMott

MM Procedure Tech Note

Micro Mott Task Hazard Analysis

NEG Sputtering Stand

JLAB-TN-10-003 Sputtering Tech note (docx),

Sputtering: Quick reference.pptm

 

Vacuum and Bake Documents – various locations

Vacuum Work Task Hazard Analysis Vacuum_THA.docx

General Bake Task Hazard Analysis Bake_THA.docx

Tunnel Gun Procedure and Quick Checklist

Photocathode Anodization

Prints for anodizing chamber

 

Laser Safety Documents

Archival Expires/Superceded Procedures

Procedure for Securing Photogun High Voltage Leads

Anodization

2006– solvent free

20072000 Paul Rutt version

 

Page maintenance performed on Nov 6, 2012  hansknec@jlab.org

Maintained by grames@jlab.org