DT # |
Description |
Date |
Recipient |
|
|
|
|
L2059 |
C100_10R fiducials and final flange location Nov. 2022 |
11/16/2022 |
J. Fisher |
L2053 |
Alignment of Gun Chamber Assembly(Cathode/Anode) R_30-3 |
10/12/2022 |
C. Hernandez-Garcia |
L2032 |
West Arc Torque Results - SAD '22 |
05/13/2022 |
T. Michalski, A. Dipette, W. Oren. |
L2001 |
1C components coordinates report |
08/25/2021 |
Y. Roblin, C. Dubbe, N. Gauthier |
L1998 |
Injector components and Gun Chopper in mechanical coords |
07/06/2021 |
M. Bruker, J. Grames |
L1998 |
Injector components and Gun Chopper in mechanical coords |
07/06/2021 |
M. Bruker, J. Grames |
L1965 |
Injector components in mechanical coords |
01/23/2020 |
S. Gregory, D. Machie |
L1971 |
Inspection Spherical Electrode Shell |
02/27/2020 |
C. Garcia, J. Grames |
L1929 |
Injector as-founds for upgrade |
06/26/2019 |
D. Machie |
L1916 |
Inspection of new Electrode insulator-flange assembly |
03/21/2019 |
C. Garcia, J. Grames |
L1905 |
2D line, IPM and IHA2D00 |
02/08/2019 |
A. Hofler |
L1923 |
Spring SAD Torqued Stands |
05/16/2019 |
T. Michalski, A. DiPette, C. Dubbe, S. Suhring |
L1906 |
CEBAF Magnet Locations |
02/11/2019 |
A. Freyberger; T. Michalski; M. Tiefenback |
L1857 |
2018 SAD Cryomodule Swap Waveguide Locations |
03/22/2018 |
S. Gregory, R. Lassiter |
L1862 |
Bubble Chamber Survey |
05/09/2018 |
R. Suleiman |
L1874 |
As-Found Locations of the Gun BPM's, Solenoind and 2D line BPM |
08/03/2018 |
M. Poelker, J. Grames, A. Hofler |
L1875 |
Final location of Zone 7 1L07 CM and girders |
08/08/2018 |
Y. Roblin |
L1828 |
Beam piple locations at injector chicane |
11/08/2017 |
S. Suhring, M. Tiefenback |
L1811 |
Locations of 3C Energy Super Harps for Hall C |
08/23/2017 |
J. Benesch, D. Gaskell, K. Cole, M. Keesee |
L1804 |
Front end injector dimensions from the chopper upstream to laser hut |
07/21/2017 |
D. Machie |
L1803 |
Final positions of the polarimeter in the 1D Injector line |
07/20/2017 |
J. Grames |
L1788 |
Location of the 4D Isotope Target as well as the BPM's and Harps |
05/03/2017 |
J. Gubeli, Y. Roblin, P. Francis, J. Grames |
L1787 |
Report on Injector Chicane As-Founds |
04/28/2017 |
Y. Roblin |
L1786 |
Locations of OL quads and 4D line Pre production Isotope Run |
04/24/2017 |
J. Gubeli, Y. Roblin, P Francis |
L1782 |
Inspection of T_Electrode ceramics |
03/29/2017 |
D. Machie, P. Adderley |
L1754 |
RF cavities B and D girder inspection |
11/22/2016 |
M.Wissman |
L1740 |
UITF Ground elevations |
10/21/2016 |
J. Grames |
L1678 |
INJ. 5D MQD5D00 and MQD5D01 |
10/23/2015 |
R. Suleiman, J. Grames |
L1674 |
N. Linac gas return pipe |
09/24/2015 |
M. Wright, S. Suhring |
L1669 |
Bubble Chamber Survey |
09/08/2015 |
S. Riad |
L1662 |
IHA7E01 Super Harp |
08/18/2015 |
M. Spata, A. Freyberger, J. Benesch |
L1658 |
Electrode insulator QC |
07/10/2015 |
D. Machie |
L1655 |
A1-Brock Survey |
06/29/2015 |
M. Stutzman, J. Grames |
L1640 |
Peppo Gap Inspection |
05/15/2015 |
J. Benesch, J. Grames |
L1638 |
MBLOL021 5mev dipole |
05/12/2015 |
J. Benesh |
L1572 |
East and West Arc and 0L0R SLM locations |
07/18/2014 |
J. Gubeli, M. Tiefenback |
L1550 |
BPM locations in the Injector, 1S, Transport Recombiner & BSY |
02/21/2014 |
M.Spata, M. Joyce, A. Freyberger |
L1551 |
4D00 Line Injector |
02/21/2014 |
J. Benesch, M.Spata, Y Wang, R. Kazimi |
L1546 |
As-founds 1C Quads QR1C19 QR1C20 |
01/31/2014 |
M. Bevins, Y. Roblin, A. DiPettie |
L1534 |
Superharp bench as-found line 1C (downstream bench) |
01/13/2014 |
Chase Dubbe |
L1533 |
West Arc SLM Issues |
01/13/2014 |
J. Gubelli |
L1530 |
4D00 Line Injector |
12/13/2013 |
J, Benesch, M. Spata |
L1528 |
BCM beampipe correction |
11/15/2013 |
J. Grames |
L1527 |
Mott Ladder |
11/13/2013 |
J.Grames |
L1526 |
bpms / beampipe 2E region at 2E03->AE03 |
11/11/2013 |
M. Bevins, P. Hansen, C. Dube |
L1525 |
1D Line Survey |
10/31/2013 |
J. Grames |
L1524 |
Injector _MQD5D00 and MQD5D01 |
10/31/2013 |
J. Grames |
L1523 |
Inspection of the SW Ext. YB dipole chamber flanges |
10/15/2013 |
M. Bevins, P, Hanson |
L1522 |
BPM locations in the Spreader Recombiner regions |
10/09/2013 |
M. Joyce, A. Freyberger, M.Bevins, P.Francis |
L1521 |
Dog Leg Magnets in the NECR and SWCR |
09/03/2013 |
M. Spata |
L1520 |
Beampipe survey at MBF4D01, IPMOL05 and QJ0l05 |
08/09/2013 |
M. Bevins |
L1519 |
YR Magnet Chamber Inspection |
08/08/2013 |
M. Bevins |
L1516 |
MBF4D01 45mev beam pipe and magnet location |
07/17/2013 |
M. Bevins |
L1515 |
Inspection of SWCR and NECR Flanges |
07/11/2013 |
M. Bevins |
L1513 |
YA Chamber Inspection |
07/02/2013 |
M. Bevins |
L1512 |
Inspection of 45Mev Cross |
06/20/2013 |
M. Bevins, P. Hanson |
L1510 |
12 GeV Ideal data for 45MeV Spectrometer Dipole |
06/05/2013 |
R. Kazimi, J. Grames |
L1508 |
Northeast Corner Dogleg Stand Interference |
05/31/2013 |
M. Bevins |
L1507 |
Peppo Survey |
05/08/2013 |
Joe Grames |
L1500 |
B COM vacuum chamber checks. |
03/25/2013 |
P. Hansen, M. Bevins |
L1481 |
Cryo module wave guides in slot NL22 -> NL25 |
10/03/2012 |
Andrew Kimber |
L1477 |
Step2A position of Cryomodule 0L05 |
08/17/2012 |
M Tiefenback, Y. Roblin, A. Freyberger |
L1462 |
Peppo Survey |
06/13/2012 |
Joe Grames |
L1456 |
Injector and Peppo Quads |
05/25/2012 |
Joe Grames |
U1444 |
beam pipe and pipe jigs |
04/17/2012 |
A. Dipette |
U1433 |
C100-9 VV inspection |
02/09/2012 |
G. Chen, B. Carpenter, J. Fisher |
L1429 |
Magnet Stand QC |
01/10/2012 |
A. DiPetti |
U1428 |
C100 spaceframe #10 inspection. |
01/09/2012 |
J. Matalevich |
U1425 |
C100-7 VV inspection |
01/04/2012 |
G. Chen, B. Carpenter, J. Fisher |
U1411 |
C100 spaceframe #9 inspection. |
10/14/2011 |
J. Matalevich |
L1410 |
45 MeV Dump Survey |
10/14/2011 |
Reza Kazimi, Arne Freyberger |
U1409 |
C100 spaceframe #8 inspection. |
10/10/2011 |
J. Matalevich |
U1405 |
C100 spaceframe #7 inspection. |
08/05/2011 |
J. Matalevich |
L1367 |
Acc. 0R region chicane beam pipe flanges. |
01/21/2011 |
A. Freyberger, S. Suhring |
L1330 |
Inj. Wien filter 2 girder. |
10/11/2010 |
R. Kazimi, J. Grames, M. Polker |
L1324 |
SRF supply/return end can QC. |
10/04/2010 |
J. Fischer |
L1322 |
Z distances from Chopper to A4 |
10/01/2010 |
R. Kazimi, J. Grames |
L1318 |
Quad components in Line A within Hall A |
09/14/2010 |
S. Worthington, T. Michalski |
U1273 |
XB 4M dipole vacuum vessel inspection. |
03/24/2010 |
M. Bevins, R. Bailes |
L1263 |
Inverted Gun as-found data |
02/12/2010 |
K. Surles-Law |
L1242 |
BPMs IPM2S10 IPM1C05 IPM2C04 IPM3C05 |
08/24/2009 |
David Green |
L1224 |
elevations near sl07 u-tubes |
04/02/2009 |
S. Suhring, M Drury, M. Wright |
L1211 |
YR magnet information - beams in YR etc |
01/13/2009 |
Jay Benesch |
L1202 |
Injector 5mev spectrometer. |
11/21/2008 |
J. Grames, J. Dumas, R. Kazimi, M. Spata |
L1199 |
Beam Pipe info in Line A Compton region |
11/13/2008 |
A. Freyberger, N. Okay |
L1176 |
Location survey of Load Lock Gun |
07/30/2008 |
J. Grames |
L1174 |
BQ summary for 12 Gev Study |
07/25/2008 |
D. Green, M. Bevins, M. Spata, P. Hansen |
U1158 |
N linac west end stand locations. |
02/28/2008 |
M. Bevens |
L1151 |
East West arc dipole roll. |
01/02/2008 |
J. Benesch |
U1143 |
Attachment drawings for BCom magnet |
11/15/2007 |
J. Smith, M. Wiseman, J. Takacs |
L1135 |
As-found Comparison of Line A Superharp after modification |
10/30/2007 |
H. Park, M. Wiseman, N. Okay |
L1132 |
500KeV, Mott polarimeter. |
10/15/2007 |
R. Kazimi, K. Mahoney, J. Grames |
L1128 |
Line C Harp encoders. |
09/06/2007 |
A. Freyberger |
L1125 |
As-found locations of A3 and A4 |
08/15/2007 |
K. Mahoney, J.Grames, M. Spata |
L1122 |
As-found locations of A3 and A4 after run |
07/27/2007 |
M. Poelker, J.Grames, M. Spata |
L1118 |
Load Lock Gun - derivation of calculation point |
07/17/2007 |
J. Grames, M. Poelker, D. Machie |
L1117 |
Existing Gun 2 Injector Gun Flanges |
07/16/2007 |
J. Grames, M. Poelker, D. Machie |
L1108 |
Monitoring Superharp for movement for alterations |
04/24/2007 |
H. Park, R. Lassiter, M. Wiseman |
U1107 |
Location survey cryo relief valve near end of injector |
04/20/2007 |
M. Wiseman, C. Butler, J. Takacs |
L1103 |
Injector gun Prep chamber survey. |
03/14/2007 |
J. Grames, M. Poelker, P. Adderley |
L1081 |
April 2000 S.Linac Quad Movements
|
10/27/2006 |
M. Tiefenback A. Freyberger, Y. Chao |
|
L1065 |
Injector 2D (5MeV) dump report |
06/26/2006 |
M. Spata, R. Kazimi, S. Suhring, J. Grames |
|
L1064 |
Injector 1D (500keV) dump report |
06/15/2006 |
M. Spata, R. Kazimi, K. Mahoney, S. Suhring |
|
L1062 |
Load Lock Gun solenoid survey |
06/12/2006 |
M. Poelker |
|
L1056 |
Arc Harp Locations |
05/02/2006 |
J. Benesch |
|
L1055 |
Injector Harp Locations |
04/26/2006 |
J. Benesch |
|
L1054 |
Line B Harp Locations |
04/14/2006 |
J. Benesch |
|
L1053 |
Line A Harp Locations |
04/04/2006 |
J. Benesch |
|
L1050 |
Injector Gun Alignment |
03/22/2006 |
M. Poelker, P. Adderley |
|
L1047 |
Line C Harp Locations |
03/10/2006 |
J. Benesch |
|
L1045 |
A3, A4 Inspection |
03/06/2006 |
J. Takacs, K. Mahoney |
|
L1013 |
Measurements in 500keV area of Injector |
10/10/2005 |
R.Kazimi, K.Mahoney, A.Guerra, M.Tiefenback, M.Spata |
|
L1007 |
Inspection of line C Moeller ceramic pipe |
08/01/2005 |
C. Yan, T. Whitlatch |
|
L990 |
ESR compressor pad inspection |
04/20/2005 |
P. Knudsen |
|
L989 |
AT09 viewer as-set location |
04/18/2005 |
A. Freyberger, J. Benesch, M. Spata |
|
L988 |
BPM locations in NL27 / 1S01 areas |
04/15/2005 |
A.Freyberger, O. Garza |
|
L980 |
12GeV return end cap inspection |
03/21/2005 |
E. Daly |
|
L979 |
Injector area roll as-found data |
02/14/2005 |
Y. Chao |
|
L978 |
Extractor line YA/YB report |
02/03/2005 |
M. Spata |
|
L975 |
Inspection of CHL C5 and C6 stands |
01/25/2005 |
J. Wilson |
|
L972 |
Elevation survey of Accelerator |
01/13/2005 |
D. Kashy, W. Oren, M. Spata, S. Suhring |
|
L964 |
Renascence end cap and bridging ring inspection |
03/28/2005 |
E. Daly |
|
L957 |
Injector Z measurements from 1/4 to 1st cryomodule |
09/23/2004 |
R. Kazimi, M. Spata, M. Tiefenback Y.Zhang |
|
L942 |
AT08-AT09 viewer as-set locations |
09/09/2004 |
A. Freyberger, J. Benesch, M. Spata |
|
L941 |
BPM locations in Transport Channel Recombiner |
09/07/2004 |
J. Benesch, A. Freyberger, M. Spata |
|
L939 |
45 MeV dump survey |
08/26/2004 |
R. Kazimi |
|
L928 |
BPM locations near Compton Magnet MC1P03 |
05/21/2004 |
J. Benesch |
|
L916 |
Z locations downstream of Injector cryomodule |
02/05/2004 |
Y. Zhang |
|
L908 |
Apperture A2 offsets |
10/31/2003 |
P. Adderly, M. Poelker |
|
L907 |
BPM locations in SW/NE spreaders |
10/31/2003 |
M. Spata, J. Benesch |
|
L904 |
Injector Quad locations QJ0L01/2/3/4 |
10/24/2003 |
J. Benesch, Y. Zhang |
|
L900 |
BPM locations in SWCR11 (2T region) |
09/30/2003 |
M. Spata, J. Benesch |
|
L889 |
Transfer from Gyro
Lines to NLnc & SLnc |
08/18/2003 |
Joe Grames |
|
L885 |
QA3C12 super harp/flange survey |
08/05/2003 |
Robby Hicks |
|
L884 |
Upgrade NL11 Space frame inspection |
08/04/2003 |
Tim Whitlatch, Brian Carpenter |
|
L878 |
BPM Locations in Spreader / Recombiner areas |
07/21/2003 |
Jay Benesch |
|
L856 |
Inspection CARRIER 01 AND RETURN 02 END CANS |
04/11/2003 |
Tim Whitlatch and Brian Carpenter |
|
L849R |
Upgrade vacuum vessel NL11 |
3/20/2003 |
Tim Whitlatch, Brian Carpenter |
L849 |
Upgrade vacuum vessel NL11 |
03/20/2003 |
Tim Whitlatch, Brian Carpenter |
|
L847 |
Z Measurements in the Injector |
03/17/2003 |
M. Tiefenback, R. Kazimi, M. Spata,
D. Machie |
L841 |
PCGun alignment in test cave. |
01/23/2003 |
Joe Grames |
|
L810 |
Injector Quad Locations QJ0L02/03 |
09/12/2002 |
Alex Bogacz, Jackie Smith |
|
L798 |
RF4T02 |
07/30/2002 |
M. Spata, J. Benesch, J. Musson |
|
L781 |
YR magnet inspection of arc |
06/04/2002 |
Jackie Smith |
|
L756 |
Chopper position (historic) |
04/10/2002 |
P. Adderly, M Poelker, J. Benesch |
|
L754 |
12 Gev vacuum vessel #002 inside rail inspection. |
04/05/2002 |
Whitlach, Carpenter |
|
L752 |
A1-A2 girder survey. |
04/01/2002 |
Phil Adderly |
|
L702 |
0R02 SLM vacuum chamber. |
09/20/2001 |
Robby Hicks |
|
L679 |
Line B Re-alignment |
7/2/2001 |
Benesch, Bogacz, Freyburger, Mecking, Spata |
L663 |
Faraday Cup |
3/20/01 |
J. C. Denard, Phil Adderly |
L657 |
Elevation survey of Accelerator |
3/1/2001 |
Bogacz, Carlini, DeJager, Mecking, Spata, Suhring, Oren, Wiseman |
L654 |
Chopper cavity survey. |
2/21/01 |
Charles Sinclair |
L645 |
Injector Polarized Injector Gun |
12/15/2000 |
Phil Adderley |
L644 |
SNS Cryo Module Survey Repeatablity test |
12/13/2000 |
Joe Preble |
L643 |
Transfer from Gyro Lines to Inj, SLnc, A and C |
12/12/2000 |
J. Grames, J. Mitchell, C. Sinclair |
L642 |
SNS 1/4 Cryo Module deformation |
12/5/2000 |
Joe Preble |
L634 |
Transfer from Gyro Lines to SLnc, A and C |
10/4/2000 |
J. Grames, J. Mitchell, C. Sinclair |
L630 |
Cryo Transfer Line Support Elevations |
9/26/00 |
Peter Knudsen |
L628 |
HV test system alignment survey 23Dec1999 |
9/14/00 |
Sinclair Siggins |
L625 |
Gyro survey of Network Lines |
8/29/2000 |
J. Grames, J. Mitchell, C. Sinclair |
L621 |
SNS Helium Vessel Surveys |
7/28/00 |
Brian Carpenter |
L574 |
HV test system alignment survey 23Dec1999 |
2/08/00 |
Sinclair Siggins |
L571 |
Mott Polarimeter survey / location |
1/24/00 |
Steigerwald |
L569 |
SuperHarp location at 3C12 -- Nov 22 Survey |
1/18/00 |
Hutton |
|
|
|
|
|
|
|
|
|
|
|
|
|
|