DT # |
Description |
Date |
Recipient |
|
|
B2064 |
Hall B Polarized target, rasters, and BPM 25th January 2023 survey report |
01/27/2023 |
S. Stepanyan, B. Miller, E. Pasyuk, J. Brock |
B2061 |
Hall B Polarized target, rasters, and HTCC January 2023 survey report |
01/13/2023 |
S. Stepanyan, B. Miller, E. Pasyuk, J. Brock |
B559 |
Survey of Pb collimator in B dump |
10/28/99 |
Freyberger Kashy |
B573 |
Hall B target & upstream componets survey jan 27/2000 |
2/07/00 |
Kashy Freyberger |
B580 |
Hall B Condensor |
3/9/00 |
Kashy |
B587 |
Hall B double Cell target survey |
3/29/00 |
Kashy |
B589 |
Final Hall B double Cell target survey |
3/31/00 |
Kashy |
B590 |
Results Hall B target survey April 4 2000 |
4/7/00 |
Kashy Freyberger |
B591 |
Hall B support beam centerline survey |
4/10/00 |
Kashy |
B596 |
Hall B BPM box (IBC2H01, IPM2H01V, IPM2H01H) april 26, 2000 |
4/27/00 |
Kashy Freyberger |
B597 |
Upstream wall profile |
4/28/00 |
Kashy Hemler |
B603 |
Rad Phi target/detector |
5/19/00 |
Craig Steffen |
B609 |
Insertion cart calibration |
6/13/00 |
David Kashy |
B614 |
Levels upstream in Line B |
7/10/00 |
Dave Kashy |
B615 |
Mini Torus Center Flange Check |
7/10/00 |
Dave Kashy |
B619 |
Hall B Polarized Target |
7/19/00 |
Chris Keith |
B620 |
Mini torus docking point |
7/20/00 |
Arne Freyberger, David Kashy |
B623 |
Hall B polarized target |
8/17/00 |
Arne Freyberger, David Kashy |
B626 |
Hall B upst beamline |
8/31/00 |
Arne Freyberger, David Kashy |
B675 |
PrimeX magnet mapper probe location. |
6/13/01 |
Abdellah Ahmidouch |
B692 |
Region 3 chamber removal/reinstall |
8/13/2001 |
Mac Mestayer |
B693 |
Hall B beam line components |
8/17/01 |
Arne Freyberger, Dave Kashy |
B698 |
Hall B mini torus inspection/fiducialization. |
9/11/01 |
D. Kashy |
B2048 |
Hall B Polarized target and rasters summary of last two surveys |
09/07/2022 |
C. Wiggins, S. Stepanyan, B. Miller, E. Pasyuk, J. Brock |
B2041 |
Hall B Polarized target and rasters summary of last three surveys |
07/25/2022 |
C. Wiggins, S. Stepanyan, B. Miller, E. Pasyuk, J. Brock |
B2036 |
HB Rich Detector as-founds |
06/13/2022 |
M. Mirazita, T. Lemon, E. Pasyuk, B. Miller |
B2038 |
Hall B HPS 2021 As-Found after run |
06/16/2022 |
B. Miller, S. Stepanyan |
B2035 |
Hall B Polarized target and US components for June 2022 run |
06/08/2022 |
C. Wiggins, S. Stepanyan, B. Miller, E. Pasyuk, J. Brock |
B2021 |
Hal5l B Band as-fnd Aug. 2021 |
12/06/2021 |
F. Hauenstein, J. Estee |
B2025 |
Hall B Saclay Target |
01/24/2022 |
S. Stepanyan, B. Miller |
B2028 |
Distance between HPS Collimator and Harp |
02/23/2022 |
S. Stepanyan |
B2018 |
Saclay Target as-found |
11/12/2021 |
S. Stepanyan, B. Miller, Y. Gotra |
B2003 |
Hall B HPS 2021 upstream components location |
09/03/2021 |
S. Stepanyan, B. Miller, C. Wiggins, D. Insley |
B2002 |
Hall B HPS 2021 downstream components location |
08/31/2021 |
S. Stepanyan, B. Miller, C. Wiggins, D. Insley |
B1986 |
FMT as-found post-run survey1986 |
10/22/2020 |
E. Pasyuk, B. Miller, S. Stepanyan |
B1977 |
Saclay regular and Solid targets from February 2 & 4th surveys |
07/24/2020 |
B.Miller S.Stepanyan |
B1974 |
Bonus alignment after FMT repair. |
07/20/2020 |
E. Pasyuk, B. Miller, S. Stepanyan |
B1973 |
Bonus 3 (second Bonus detector during run) measured March 19th 20201973 |
04/05/2020 |
E. Pasyuk, B. Miller, S. Stepanyan |
B1962 |
Band Box detector as-found for December 2019 run, with the information that F. Hauenstein requested, added |
01/09/2020 |
S. Stepanyan, F. Hauenstein, B.Miller |
B1954 |
Target survey for Winter-2019 Hall B Run1955 |
12/04/2019 |
S. Stepanyan, B. Miller |
B1955 |
Band Box detector as-found for December 2019 run1956 |
12/04/2019 |
S. Stepanyan, F. Hauenstein, B.Miller |
B1943 |
HTCC check of Ring positions |
10/25/2019 |
B. Miller, C.Wiggins |
B1941 |
Hall B HPS 2019 As-Found after run |
10/09/2019 |
B. Miller, S. Stepanyan |
B1927 |
Hall B HPS 2019 Component Locations1927 |
06/13/2019 |
B. Miller, S. Stepanyan |
B1921 |
HPS 2019 Pair Spec/Frascatti ds/ rails |
04/30/2019 |
S. Stepanyan, B. Miller, C. Wiggins |
B1918 |
HPS Hodoscope Inspection / Fiducialization |
04/25/2019 |
S. Stepanyan, M. Cook IV, B. Miller |
B1908 |
Band Box detector as-found for winter 2019 run |
02/18/2019 |
S. Stepanyan, F. Hauenstein, B.Miller |
B1901 |
SVT / Target survey for Winter Hall B Run |
02/04/2019 |
V. Burkart, S. Stepanyan, B. Miller, M. Mestayer |
B1895 |
As-found Target - target rail stops moved and then repositioned |
11/30/2018 |
S. Stepanyan, B. Miller |
B1864 |
Hall B Rails Adjustment - SVT / Target Cart - post run |
05/23/2018 |
B. Miller, C. Wiggins |
B1865 |
Rich Detector as installed |
06/05/2018 |
Marco Mirazita |
B1866 |
January 2018 location of Hall B Forward Carriage |
06/07/2018 |
B.Miller, S. Stepanyan |
B1868 |
Rail elevation [plane] for new polarized target cart |
06/15/2018 |
K. Harding |
B1870 |
Foward tagger hodoscope data with nose cone - June 2018 survey |
06/22/2018 |
R. DeVita, S.Stapanyan, B.Miller |
B1872 |
HTCC and Solenoid July 2018 as-set location (step2A not sure if we will get 2B) |
07/19/2018 |
B. Miller, S. Stepanyan, Y. Sharabian |
B1879 |
Rework of Region 1,2,3 as set positions in Sector 1 orientation |
08/16/2018 |
M. Mestayer, B. Miller |
B1882 |
August 2018 hall b target |
08/28/2018 |
B. Miller, S. Stepanyan, Y. Sharabian |
B1887 |
Foward tagger June 2018 and August survey data |
09/21/2018 |
R. DeVita, M.Battaglieri, S. Stapanyan, B. Miller |
B1853 |
Polarized Target Chamber Flange Inspections |
03/06/2018 |
J. Brock |
B1851 |
As-set location of MVT and SVT for the 2017-2018 run |
02/08/2018 |
Y. Gotra |
B1850 |
As found of detectors panel ecal / pcal on fwd carriage - January 2018 Run |
01/25/2018 |
D. Carman, B. Miller |
B1849 |
As found of detectors panel 1a/1b and panel 2 on fwd carriage - January 2018 Run |
01/18/2018 |
D. Carman, B. Miller |
B1848 |
As-found Target - upstream beamline for Winter 2018 run |
01/11/2018 |
S. Stepanyan, B. Miller |
B1846 |
Reset Region 1 Sector 5 and 6 to Nov2017 settings |
01/09/2018 |
S. Stepanyan, B. Miller |
B1844 |
As found of detectors panel ecal / pcal on fwd carriage - December 2017 Run |
01/08/2018 |
D. Carman, B. Miller |
B1841 |
As found of detectors panel 1a/1b and panel 2 on fwd carriage - December 2017 Run |
12/21/2017 |
D. Carman, B. Miller |
B1839 |
As-Set Rail survey data |
12/15/2017 |
B. Miller, D. Tilles |
B1837 |
Foward tagger hodoscope data |
12/14/2017 |
S. Stepanyan, B. Miller |
B1835 |
CTOF Plane geometry values |
12/06/2017 |
D. Carman, B. Miller, C. Wiggins |
B1831 |
KPP Run Data from Jan 2017 |
11/30/2017 |
S. Stepanyan |
B1829 |
as-set Solenoid HTCC SVT 12G_Target |
11/21/2017 |
S.Stepanyan, B. Miller, V. Burkert |
B1827 |
SVT and Target Rail survey data |
11/03/2017 |
B. Miller, D. Tilles |
B1824 |
CTOF as-found radii checks |
10/26/2017 |
D. Carman, B. Miller |
B1821 |
MVT Curved Detector Fiducial |
10/18/2017 |
M. Defurne |
B1818 |
Location of Polarimeter Target as-founds |
09/25/2017 |
S. Stepanyan |
B1813 |
Analysis of Region 1 Detector - data from 9/2014 |
08/31/2017 |
M. Mestayer, B. Miller |
B1805 |
As found of detectors panel 1a/1b and panel 2 on fwd carriage - revised as per D. Carman |
07/26/2017 |
D. Carman, B. Miller |
B1801 |
Forward Tagger Calorimeter alignment plus nose piece |
07/10/2017 |
B. Miller, M. Battaglieri, S. Stepayan |
B1800 |
Solenoid Cold Mass to Inner Bore relationship |
07/05/2017 |
B. Miller, J. Hogan, R. Fair |
B1799 |
CM Inspection after delivery to Hall B and the Z port locations |
06/30/2017 |
B, Miller, D, Kashy, R. Fair |
B1798 |
Solenoid to Cart report |
06/22/2017 |
B. Miller, J. Hogan, R. Fair |
B1797 |
Moller target, Quads locations as of Oct. 2015 |
06/15/2017 |
B. Miller, S. Stepanyan, B. Raue |
B1794 |
MicroMegas Fiducialization and Integration with SVT R123 |
06/08/2017 |
A. Stephan, M. Defurne, F, Sabatie |
B1789 |
Collimator, I-Beam, Beam Stopper and Faraday Cup As-found and As-set |
05/22/2017 |
B. Miller, N. Baltzell, S.Stepanyan |
B1785 |
beampipe in the Hall B downstream alcove - downstream 1st shield wall |
04/18/2017 |
S. Stepanyan |
B1781 |
As found of all detectors on fwd carriage |
03/14/2017 |
D. Carman, B. Miller |
B1770 |
central time of flights in dummy container (CTOF) in beamline for KPP |
02/15/2017 |
B. Miller, D. Carman |
B1769 |
Solenoid cart data based on coordinate system |
02/14/2017 |
J. Hogan, B. Miller |
B1764 |
Forward carraige as-found with all detectors / FTOF loaded |
01/18/2017 |
B. Miller, D. Carman |
B1763 |
Central Time of Flight stand initial alignment data |
01/05/2017 |
B. Miller |
B1759 |
Region 1,2,3 as set positions |
12/21/2016 |
M. Mestayer, B. Miller |
B1758 |
Flange locations HB Downstream alcove |
12/13/2016 |
C. Wiggins |
B1756 |
Shim movements for forward carriage |
12/08/2016 |
B. Miller |
B1755 |
Hall B Collimator locations. |
11/30/2016 |
N. Baltzell, S. Stepanyan |
B1751 |
Step1 alignment of 12Gev Solenoid Cart |
11/14/2016 |
B Miller |
B1732 |
12 Gev Torus Mapper |
10/03/2016 |
M. Mestayer, B. Miller, R. Rajput-Ghoshal |
B1731 |
Solinoid Cart inspection |
09/29/2016 |
J. Hogan, B. Miller |
B1730 |
Region 2, Sectors 2 and 3 detector alignment |
09/15/2016 |
B. Miller, M. Mestayer |
B1725 |
Torus 12 Region 1 - Sector 1 detector test |
08/15/2016 |
Mac Mestayer |
B1721 |
Hycal / Gem locations for PRad Experiment |
06/06/2016 |
B.Miller, S. Stepanyan, A. Gasparian |
B1719 |
Torus mapper plate fiducialization |
05/31/2016 |
R. Rajuput-Ghoshal, B. Miller |
B1718 |
prad equipment / beamline |
05/20/2016 |
B. Miller, S. Stepanyan |
B1716 |
torus bolt hole locations from prad area |
05/16/2016 |
D. Kashy |
B1714 |
Downstream Pair Spectrometer As-found |
05/02/2016 |
B. Miller, S. Stepanyan |
B1712 |
Probe Holder Fiducialization |
04/26/2016 |
R. Rajput-Ghoshal, R. Fair, J. Meyers |
B1708 |
HALL B CF MAPPER SURVEY |
03/23/2016 |
J. MYERS |
B1707 |
Hall B Torus coils, inspection/ fiducialization - Pre Seal Up of vacuum chambers |
03/22/2016 |
B. Miller, D. Kashy |
B1703 |
Hall B Torus coils, inspection/ fiducialization |
03/08/2016 |
B. Miller, D. Kashy |
B1698 |
Hall B Torus coils, inspection/ fiducialization |
02/22/2016 |
B. Miller, D. Kashy |
B1697 |
Final position for Panel 2 supports |
02/15/2016 |
B. Miller |
B1695 |
Hall B beam pipe and component location |
02/08/2016 |
S. Stepyan |
B1690 |
Inspection of Torus coil fiducials and hub - last inspection on spit |
01/13/2016 |
D. Kashy, B. Miller, V. Burkert |
B1689 |
MVT Inspection |
12/22/2015 |
S. Aune, S. Mandal |
B1688 |
HB Torus Region 2 supports |
12/21/2015 |
B. Miller |
B1687 |
Hall B Torus coils, Z and Y supports, DC supports |
12/15/2015 |
B. Miller, D. Kashy |
B1684 |
Torus coil fiducial angles wrt hubline |
11/18/2015 |
D. Kashy |
B1681 |
Torus Magnet Inspection Connectors, Cold Bar and Vacuum Jacket |
11/04/2015 |
D.Kashy |
B1677 |
Locations for Hall B Cryo Lines |
10/20/2015 |
F. Martin, B. Miller, J. Matalevich |
B1675 |
Final coordinates of all SVT Regions 1-41675 |
10/08/2015 |
Mandal, Gotra, Eng |
B1673 |
Torus Edge Points Plane and Circle data |
09/10/2015 |
D. Kashy |
B1670 |
12G Torus Fiducials at hub os to cryo case - relative to Vacuum Jacket |
09/09/2015 |
D. Kashy |
B1668 |
Torus Hub fiducial comparision to found |
09/04/2015 |
D. Kashy |
B1667 |
Line Data for Torus vacuum Jacket hub planes |
09/02/2015 |
D. Kashy |
B1666 |
HPS Ecal as found survey |
08/31/2015 |
S. Stepanyan |
B1665 |
LTCC Unit #2 focusing laser alignment |
08/27/2015 |
M. Ungaro, B. Miller |
B1664 |
re-shoot of 12G Torus with cryostats in proper rough alignment |
08/27/2015 |
D. Kashy, O. Pastor |
B1661 |
Coil X vacuum jacket survey |
08/05/2015 |
C. Luongo, B. Legg, D. Kashy, O. Pastor, G. Biallas |
B1659 |
Realign the HTCC mirror laser |
07/17/2015 |
Y.Sharabian, S. Christo |
B1657 |
Installed Torus 12 Gev Coils - All 6 Cryostats |
07/02/2015 |
C. Luongo, D. Kashy, O. Pastor |
B1656 |
SVT R4 Fiducialization |
06/29/2015 |
S. Mandal |
B1654 |
CCM009 vacuum jacket survey |
06/19/2015 |
C. Luongo, B. Legg, D. Kashy, O. Pastor, G. Biallas |
B1653 |
SVT R3 Fiducialization |
06/17/2015 |
S. Mandal |
B1650 |
Installed Torus 12 Gev Coils B, C, D E and 5th Cryostat F |
06/10/2015 |
C. Luongo, D. Kashy, O. Pastor |
B1649 |
Cakepan CCM009 |
06/09/2015 |
C. Luongo, B. Legg, O.Pastor, J. Fischer |
B1646 |
CCM007 vacuum jacket survey |
06/01/2015 |
B. Legg, D. Kashy, G. Biallas |
B1645 |
Elevations on floor for 12G Torus Stand |
05/27/2015 |
M. Zarecky |
B1644 |
R4 Support Tube Inspection |
05/27/2015 |
S. Mandal |
B1643 |
Region 4 SVT Alignment |
05/27/2015 |
S. Mandal |
B1642 |
General elevation differences Hall B 1994-2014 |
05/19/2015 |
O. Pastor, B. Miller |
B1639 |
Installed Torus 12 Gev Coils B, C, Dand 4th Cryostat E |
05/13/2015 |
C. Luongo, D. Kashy, O. Pastor |
B1637 |
Cakepan CCM008 |
05/11/2015 |
C. Luongo, B. Legg, O.Pastor, J. Fischer |
B1636 |
LTCC Unit #1 focusing laser alignment |
05/08/2015 |
M. Ungaro, B. Miller |
B1635 |
SVT R1 Module Fiducialization |
05/07/2015 |
S. Mandal |
B1634 |
R2 module Fiducialization |
05/07/2015 |
S. Mandal |
B1633 |
R4 Machine Assy Inspection B000000101-7200 |
05/07/2015 |
S. Mandal |
B1632 |
Forward Carraige bolt hole location (surveyed 2013) |
05/07/2015 |
B. Marzolf, B. Miller |
B1630 |
CCM006 - vacuum jacket survey for setting coils |
05/04/2015 |
C. Luongo, B. Legg, D. Kashy, O. Pastor, J. Fischer |
B1629 |
Cakepan CCM008 inspection resurvey after pan re-worked |
04/29/2015 |
C. Luongo, B. Legg, J. Fischer, O. Pastor |
B1628 |
Extra data request for HTCC |
04/28/2015 |
Y. Sharabian, S. Christo, B. Miller, B. Marzolf |
B1627 |
Installed Torus 12 Gev Coils B, C and 3rd Cryostat D |
04/28/2015 |
C. Luongo, D. Kashy, O. Pastor |
B1626 |
Region 1 SVT Alignment |
04/24/2015 |
S. Mandal |
B1624 |
Cakepan CCM008 inspection |
04/20/2015 |
C. Luongo, B. Legg, J. Fischer, O. Pastor |
B1623 |
Installed Torus 12 Gev Coils B and C |
04/17/2015 |
C. Luongo, D. Kashy, O. Pastor |
B1621 |
CCM005 vacuum jacket survey |
04/14/2015 |
B. Legg, D. Kashy, G. Biallas |
B1618 |
Hall B HPS SVT location and pivot rod repeatability |
03/27/2015 |
B. Miller, S. Stepanyan |
B1616 |
Region 2 SVT Module Inspection/ Fiducialization |
03/25/2015 |
S. Mandal, B. Marzolf |
B1613 |
Position of Cold Beams CCM003 |
03/20/2015 |
D. Kashy, O. Pastor |
B1611 |
Region 2 SVT Alignment |
03/13/2015 |
S. Mandal |
B1609 |
Region 1 SVT Fiducialization |
03/11/2015 |
S. Mandal |
B1604 |
SVT Region 1 Inspection and Alignment |
03/05/2015 |
S. Mandal |
B1602 |
Calorimeter Location |
03/04/2015 |
B.Miller,S.Stepanyan |
B1601 |
HTCC PreAlignment of Mueller Cup / Fiducialiaztion |
03/03/2015 |
S. Christo, Y. Sharabian |
B1599 |
fit of fiducials on CCM 003 |
02/23/2015 |
D. Kashy, B. Legg |
B1598 |
Hall B SVT Support Tube Inspection |
02/19/2015 |
S. Mandal |
B1597 |
FTOF 1A-1B centroid and rotations |
02/13/2015 |
B. Miller, S. Stepanyan, D. Carmen |
B1596 |
Elevations level 2 and 3 space frame |
02/12/2015 |
F. Martin |
B1595 |
HTCC 12Gev Pre-alignment |
02/11/2015 |
Youri Sharabian, Steve Christo |
B1592 |
Pair Spec SVT as-found location / foul point |
12/10/2014 |
S. Stepanyan |
B1591 |
US COLD BEAM INSPECTION |
11/17/2014 |
O.PASTOR |
B1589 |
Hall B Solenoid Practice Coil Inspection and Alignment |
11/14/2014 |
Renuka Rajput-Ghoshal |
B1587 |
I-Beam and Rail Heights |
11/10/2014 |
R. Getz, B. Malzof |
B1581 |
Downstream Cold Beam |
11/04/2014 |
O. Pastor |
B1579 |
Pair Spec/ Chamber and calorimeter pre aligned locations |
10/30/2014 |
S. Stepanyan |
B1578 |
Element locations from IPM2C21A downstream to Pair Spec. |
10/30/2014 |
M. Tiefenback, S. Stepanyan |
B1575 |
Region 2 SVT Fiducialization |
10/01/2014 |
S. Mandal |
B1573 |
floor spot shots and check on rails - elevations only |
07/18/2014 |
M. Howard |
B1569 |
Coil Case #8 Inspection |
06/09/2014 |
O. Pastor |
B1568 |
Torus Hub Inspection |
06/03/2014 |
O. Pastor |
B1567 |
Torus Vacuum Jacket set 2 |
05/29/2014 |
Pastor, Kashy |
B1566 |
FTOF 1A and 1B Fid/Insp |
05/21/2014 |
B. Miller, S Stepanyan, D. Carmen |
B1565 |
FTOF PCAL & EC Fiducialization |
05/16/2014 |
B. Miller, S Stepanyan |
B1564 |
SVT Inspection |
05/15/2014 |
S. Mandal |
B1560 |
SVT Bar Inspection |
04/21/2014 |
S. Mandal |
B1558 |
Height of goniometer cartridges |
04/09/2014 |
B. Miller |
B1557 |
Torus Vacuum Jacket set 1 |
04/07/2014 |
Pastor, Kashy |
B1545 |
Hall B Torus Shielding plate BH plate |
01/28/2014 |
J. Fischer, O. Pastor |
B1544 |
Hall B Torus Shielding plate BG plate |
01/28/2014 |
J. Fischer, O. Pastor |
B1543 |
Hall B Torus Shielding plate BF plate |
01/28/2014 |
J. Fischer, O. Pastor |
B1542 |
Hall B Torus Shielding plate BE plate |
01/27/2014 |
J. Fischer, O. Pastor |
B1541 |
Hall B Torus Shielding plate BD plate |
01/27/2014 |
J. Fischer, O. Pastor |
B1540 |
Hall B Torus Shielding plate BC plate |
01/27/2014 |
J. Fischer, O. Pastor |
B1539 |
Hall B Torus Shielding plate BB plate |
01/27/2014 |
J. Fischer, O. Pastor |
B1537 |
Hall B Torus Shielding plate BA plate |
01/24/2014 |
J. Fischer, O. Pastor |
B1536 |
Torus Lifting Frame #4 |
01/17/2014 |
J. Fischer |
B1532 |
HTCC Inspection |
01/06/2014 |
S. Christo |
B1531 |
Coordinates for Hall B alcove control |
12/17/2013 |
Cyril Wiggins |
B1529 |
Region 3 Forward Drift Chamber Flatness Inspection |
11/22/2013 |
S. Cristo |
B1524 |
Torus coil lifting fixture |
10/16/2013 |
J. Fischer |
B1514 |
I-Beam elevations. |
07/03/2013 |
Bob Miller |
B1513 |
Fcal base plate alignment. |
07/01/2013 |
Bob Miller |
B1490 |
Forward Calorimeter inspection. |
01/18/2013 |
S. Mandal, B. Miller |
B1485 |
Region 3 Sectors 2&3 side plates. |
12/11/2012 |
S. Christo |
B1483 |
CTOF Light Guide Addendum |
10/16/2012 |
B. Miller, C. Wiggins, V. Baturin |
B1479 |
CTOF light guide inspection |
10/10/2012 |
B. Miller, C. Wiggins |
B1478 |
CTOF light guide inspection. |
08/31/2012 |
B. Miller, C. Wiggins |
B1471 |
Pre shower calorimeter inspection. |
07/23/2012 |
Bob Miller |
B1470 |
CTOF light guide inspection. |
07/13/2012 |
B. Miller, C. Wiggins |
B1467 |
Central Time of Flight Light Guide Model 1405 QC |
07/03/2012 |
Bob Miller, Cyril Wiggins |
B1458 |
HPS detector |
05/29/2012 |
J. Jaros |
B1457 |
Reg 3 drift chamber deformation (ODU) |
05/25/2012 |
M. Mestayer |
B1448 |
HPS detector |
04/24/2012 |
J. Jaros |
B1413 |
Region 3 Detector Nosepiece |
03/22/2012 |
B. Miller, S. Christo, C. Wiggins |
B1412 |
Region 2 chamber inspection R301a/R302a |
10/26/2010 |
B. Miller, S. Christo |
B1377 |
Region 2 chamber inspection |
02/15/2011 |
B.Miller, C.Wiggins |
B1361 |
Region 2 clean room data (multi sector positions) deformation |
01/04/2011 |
M. Mestayer, B. Miller, S. Christo |
B1354 |
Hall B TPE Data |
12/06/2010 |
L Weinstein, S. Stepanyan, D. Kashy |
B1350 |
Hall B TPE Collimator |
11/18/2010 |
L Weinstein, S. Stepanyan, D. Kashy |
B1344 |
Region 2 chamber inspection - redo to verify point locations |
11/09/2010 |
B. Miller, S. Christo |
B1336 |
Region 2 chamber inspection |
10/26/2010 |
B. Miller, S. Christo |
B1334 |
Prime X II upstream components |
10/15/2010 |
A. Gasparian, L. Gan, D. Kashy |
B1331 |
Prime X 2 Hycal / TAC / Beam Profiler Run orientation |
10/11/2010 |
A. Gasparian, L. Gan, D. Kashy |
B1323 |
Prime X 2 Hycal / TAC / Beam Profiler |
10/01/2010 |
A. Gasparian, L. Gan, D. Kashy |
B1320 |
PrimeX 2 beamline asfound report |
09/24/2010 |
A. Gasparian, L.Gan, D. Kashy |
B1284 |
Region 2 chamber inspection |
05/12/2010 |
B. Miller, S. Christo |
B1276 |
Hall B G9B eperiment beamline survey. |
03/26/2010 |
D. Kashy, N. Okay |
B1266 |
Hall B floor elevations forward carriage dnst. |
03/04/2010 |
D. Kashy, D. Tilles |
B1261 |
Hall B floor elevations. |
01/28/2010 |
D. Kashy, D. Tilles |
B1259 |
Mini torus inspection. |
01/22/2010 |
B. Miller |
B1257 |
12 gev drift chamber end plate 201-301survey. |
01/08/2010 |
B. Miller |
B1256 |
Rohacell forming mold. |
01/06/2010 |
S. Mandal |
B1230 |
IPM2H01 - BPM Box internal locations |
05/05/2009 |
Jay Benesch |
B1228 |
Hall B April 09 Target/Calorimeter. |
04/24/2009 |
D. Kashy, N. Okay |
B1216 |
Hall B DVCS 09 Experiment beamline survey. |
02/05/2009 |
D. Kashy, N. Okay |
B1212 |
Hall B DVCS E1 Experiment beamline survey. |
01/13/2009 |
D. Kashy, N. Okay |
B1209 |
DVCS mapper |
01/08/2009 |
D. Kashy, T. Carstens |
B1200 |
As found of DVCS E1 solenoid / target / calorimeter |
11/18/2008 |
D. Kashy, V. Burkert, E. Smith, N. Okay |
B1192 |
Hall B DVCS E1 Experiment beamline survey. |
10/30/2008 |
D. Kashy, N. Okay, E. Smith, V. Burkert, Sharabian, Stepany |
B1186 |
OTR downstream of torus - in dump alcove |
10/15/2008 |
Youri Sharabian, Dave Kashy, Stepan Stepanyan |
B1165 |
Hall B G12 beamline survey. |
04/01/2008 |
D. Kashy, N. Okay, E. Smith |
B1150 |
Active collimator. |
12/07/2007 |
D. Kashy, N. Okay, D. Tilles |
B1136 |
Hall B Frost beamline survey. |
11/01/2007 |
D. Kashy, N. Okay, E. Smith |
B1126 |
Location of bolt holes in tabs on Forward Carriage |
08/30/2007 |
J. Robertson, D. Kashy |
B1124 |
Reg 1 inspection. |
08/15/2007 |
Bob Miller |
B1119 |
Reg 1 inspection. |
07/18/2007 |
Bob Miller |
B1115 |
Reg 1 position on CNC. |
06/20/2007 |
S. Christo |
B1112 |
12 Gev Region 1 end plate QC. |
05/16/2007 |
S. Christo |
B1098 |
Collimator box. |
02/21/2007 |
D. Kashy |
B1097 |
Active collimator. |
02/13/2007 |
D. Kashy |
B1083 |
G13A hodoscope survey |
10/31/2006 |
D. Kashy, D. Dale |
B1082 |
G13A experimental component survey |
10/30/2006 |
D. Kashy |
B1077 |
BCal / TPE beamline survey |
09/21/2006 |
D. Kashy, N. Okay, S. Suhring, E. Smith |
B1038 |
Installed position of INFN Cerenkov #6 |
02/07/2006 |
D. Kashy, S. Cuneo |
B1037 |
EP4A target and beamline survey |
01/30/2006 |
D. Kashy, M. Zarecky |
B1036 |
Location of INFN Cerenkov #6 |
01/30/2006 |
D. Kashy, S. Cuneo |
B1035 |
INFN Cerenkov #6 tube locations |
01/20/2006 |
D. Kashy, S. Christo |
B1034 |
Second pre-alignment of INFN Cerenkov chamaber |
01/20/2006 |
D. Kashy, S. Cuneo |
B1032 |
Heights to original Cerenkov chamber |
01/13/2006 |
D. Kashy, S. Christo |
B1031 |
INFN Cerenkov 6 Pre-Alignment. |
01/13/2006 |
D. Kashy, S. Cuneo |
|
B1030 |
Lead Bullet survey |
01/11/2006 |
D. Kashy |
B1028 |
Lead Bullet fiducial data |
01/05/2006 |
D. Kashy |
B1027 |
INFN Cerenkov inspection/fiducialization |
12/20/2005 |
D. Kashy |
B1014 |
BoNus survey |
10/13/2005 |
D. Kashy, E. Smith |
B1002 |
Cerenkov lifting fixture bolt hole inspection |
06/29/2005 |
D. Kashy, M. Zarecky |
B999 |
G8b beamline survey |
06/23/2005 |
D. Kashy, S. Stepanyan, E. Smith, P. Cole |
B994 |
Cerenkov #5 and #6 survey |
05/10/2005 |
D. Kashy, M. Zarecky |
B991 |
Polarized target fiducial data |
04/21/2005 |
M. Seely |
B983 |
DVCS beamline survey |
03/17/2005 |
D. Kashy, S. Stepanyan, E. Smith |
B968 |
DVCS calorimeter inspection |
12/22/2004 |
D. Kashy, S. Stepanyan |
B966 |
EG3 beamline survey |
12/10/2004 |
D. Kashy, S. Stepanyan, E. Smith |
B961 |
Cerenkov #6 inspection |
11/01/2004 |
M. Zarecky, D. Kashy |
B960 |
Start counter fiducialization |
10/26/2004 |
Y. Sharabian, D. Kashy |
B949 |
Transport rail elevation survey |
09/15/2004 |
P. Hemler |
B946 |
Beamline component survey |
09/10/2004 |
D. Kashy |
B945 |
TAC calibration survey |
09/10/2004 |
M. Ito |
B944 |
Primex target calibration |
09/10/2004 |
M. Ito |
B943 |
Pair spectrometer paddle detector survey |
09/09/2004 |
D. Dale |
B940 |
Hy-Cal detector calibration |
09/03/2004 |
M. Ito, D. Kashy |
B937 |
Mini Torus inspection/fiducialization |
07/20/2004 |
D. Kashy |
B936 |
Hy-Cal detector inspection/fiducialization |
07/14/2004 |
D. Kashy |
B932 |
G11A target and Start Counter alignment |
06/09/2004 |
D. Kashy |
B924 |
Strip detector inspection |
04/15/2004 |
S. Stepanyan |
B914 |
Mini Torus, Target and IPM2H01 survey |
12/18/2003 |
A. Freyberger, D. Kashy, M. Spata |
B910 |
DVCS, Target and IPM2H01 survey |
12/02/2003 |
A. Freyberger, D. Kashy, M. Spata, S. Stepanyan |
B892 |
Pair spectrometer paddle detector survey |
09/03/2003 |
D. Dale |
B873 |
PrimeX detector. |
06/18/2003 |
D. Kashy |
|
B848 |
PrimeX box beam columns. |
03/19/2003 |
D. Kashy |
|
B843 |
Support Pillar survey for Primex Magnet - additional points |
02/10/2003 |
Dave Kashy |
|
B831 |
Support Pillar survey for Primex Magnet |
12/05/2002 |
Dave Kashy |
B824 |
E1E target cell inspections. |
10/29/2002 |
D. Kashy, S. Christo |
|
B811 |
Hall B collimator harp. |
09/17/2002 |
Arne Freyberger |
|
B807 |
G7A-1,2,3 target cell inspections. |
09/06/2002 |
S. Christo |
|
B804 |
Primex Paddle Detectors (As-Found) |
08/27/2002 |
D. Dale |
|
B794 |
Hall B HyCal Prototype calibration. |
07/18/2002 |
M. Ito, D. Kashy |
|
B791 |
Primex Paddle Detectors (As-Found) |
07/09/2002 |
Dave Kashy |
|
B787 |
SHOT detector inspection. |
06/19/2002 |
D. Kashy, A. Gasparian |
Asfounds |
INFN Cerenkov 6 Pre-Alignment spreadsheet. |
01/13/2006 |
D. Kashy, S. Cuneo |
|
|
|
|
|
|
|
|
|
|
|
|
|