DT # |
Description |
Date |
Recipient |
|
D2070 |
Hall D FCAL as found and 3m in z movement locations |
05/19/2023 |
T. Whitlatch |
D2066 |
Hall D COMPCAL February 2023 as found |
02/28/2023 |
T. Whitlatch |
D2062 |
Hall D microscope, TAC and luminosity paddle, hodoscope plate 3&4, DIRC mirror boxes and bar boxes as found January 2023 |
01/18/2023 |
T. Whitlatch |
D2047 |
Hall D PAIR SPEC, HIGH-LOW DETECTORS, BELYRIUM TARGET, MICROSCOPE, HODOSCOPE PLATE 3,4,5,6,7 and Pb ABSORBER APERTURE AS FOUND AUGUST 2022 |
08/30/2022 |
T. Whitlatch |
D2039 |
Hall D CPP wire chambers |
06/21/2022 |
T. Whitlatch |
D2033 |
Hall D TAC, 3.4mm, 5mm collimator hole, and lead target position May 2022 |
05/25/2022 |
T. Whitlatch |
D2029 |
Hodoscope 2B alignment-March 2022 |
03/18/2022 |
T. Whitlatch |
D2024 |
Hall D Tagger Microscope. |
01/24/2022 |
T. Whitlatch |
D2022 |
HALL D Solid Tgt and Liquid Hydrogen Tgt |
12/16/2021 |
T. Whitlatch, E. Chudakov, A Somov, C.Keith |
D2017 |
Report on Solenoid position based on control survey |
11/03/2021 |
T. Whitlatch |
D2014 |
Hall D, COMPCAL 20th Oct 2021 survey summary |
10/20/2021 |
T. Whitlatch |
D2010 |
As found report for the solenoid based on final adjusted geonet coordinates |
10/07/2021 |
T. Whitlatch |
D2009 |
mRICH Survey |
10/06/2021 |
B. Karki |
D2008 |
Hall D liquid helium target 2B fall 2021 run |
10/06/2021 |
T. Whitlatch |
D2007 |
Hall D, 5H line components summary |
09/23/2021 |
T. Whitlatch |
D2006 |
HALL D Beryllium target as-set |
09/22/2021 |
T. Whitlatch, E. Chudakov, A Somov, C.Keith |
D1997 |
2nd Iteration - FTOF and FCAL locations after HD made adjustments to rotation and position. |
07/01/2021 |
T. Whitlatch |
D1951 |
Summary of Hall D fall 2019 |
11/25/2019 |
T. Whitlatch |
D1952 |
GEM detector 3 positions - with repeats |
11/26/2019 |
T. Whitlatch |
D1959 |
Hodoscope Plates Inspection- October 2019 |
12/12/2019 |
B. Crahen, T. Whitlatch |
D1961 |
Pair Spectrometer, Aerogel and Crystal Test Stand Coordinates |
01/07/2020 |
T. Whitlatch |
D1979 |
GEM detector ideal pitch rotation -9 deg |
09/04/2020 |
T. Whitlatch |
D1987 |
Post-run 2020 Dirc Detector as-founds |
10/28/2020 |
T. Whitlatch |
D1991 |
Microscope alignent in Tagger area |
11/20/2020 |
T. Whitlatch |
D1994 |
FTOF and FCAL locations after HD made adjustments to rotation and position. |
03/10/2021 |
T. Whitlatch |
D1950 |
Foil Targets on FTOF as-set |
11/22/2019 |
B. Zihlman, T. Whitlatch |
D1945 |
Additional Targets measured on FTOF |
11/05/2019 |
B. Zihlman, T. Whitlatch |
D1915 |
Dirc Beam Right Bar Box Mirrors |
03/21/2019 |
T. Whitlach |
D1914 |
Tagger Microscope |
03/14/2019 |
T. Whitlach |
D1911 |
HALL D Liquid Hydrogen target / set / fnd [std target] |
03/04/2019 |
T. Whitlatch, E. Chudakov, A Somov, C.Keith |
D1910 |
HALL D Beryllium target / set / fnd |
02/26/2019 |
T. Whitlatch, E. Chudakov, A Somov, C.Keith |
D1909 |
HALL D COMPCAL |
02/26/2019 |
T. Whitlatch, L. Gan, A. Somov |
D1900 |
Step 2 B locations of DIRC L1 and L2 |
02/01/2019 |
T. Whitlach, W. Li, G.Liping, J. Stevens |
D1896 |
HALL D COMPCAL ALIGN |
12/11/2018 |
T. Whitlatch, L. Gan, A. Somov |
D1880 |
Tgt survey 2018 Fall Run |
08/16/2018 |
T. Whitlatch |
D1884 |
Fall Run 2018 HD Beamline components |
09/04/2018 |
T. Whitlatch |
D1890 |
Fiducialization and Inspection of Hall D CompCal Detector |
10/10/2018 |
T. Whitlatch, |
D1843 |
High gran det's August 2017 |
01/02/2018 |
T. Whitlatch |
D1838 |
HD Muon Det as found survey |
12/14/2017 |
T. Whitlatch |
D1830 |
Fall 2017 FCAL location |
11/28/2017 |
T. Whitlatch |
D1825 |
HD Fall 2017 Goniometer/Tac |
10/26/2017 |
H. Egiyan, T. Whitlatch |
D1823 |
Fall2017 target/start counter survey |
10/26/2017 |
T. Whitlatch |
D1817 |
Hall D Elevation Monitoring 2017 |
09/19/2017 |
T. Carstens, T. Whitlach |
D1802 |
Tagger Goniometer Inspection |
07/12/2017 |
H. Egiyen, T. Whitlatch |
D1795 |
Collimator Alignment and Repeatability |
06/09/2017 |
H. Egiyen, T. Whitlatch |
D1791 |
Collimator 1 post run |
06/02/2017 |
H. Egiyen, T. Whitlatch |
D1766 |
HD Tagger Microscope/Hodoscope |
01/25/2017 |
T. Whitlatch |
D1748 |
Goniometer Foil and Axis location |
11/10/2016 |
H. Egiyan, T. Whitlatch |
D1746 |
Fall 2016 Target assembly/CompCal alignment |
10/28/2016 |
T. Whitlatch |
D1741 |
Collimator1, beam profiler, High gran det's Fall 2016 |
10/25/2016 |
T. Whitlatch |
D1737 |
HD Tagger Microscope/Hodoscope |
10/14/2016 |
T. Whitlatch |
D1729 |
Hall D Elevation Monitoring 2016 |
09/07/2016 |
T. Carstens, T. Whitlach |
D1724 |
Hall D Spring Run Target Cell Inspection |
07/12/2016 |
C. Keith, T. Whitlatch |
D1715 |
May post run survey |
05/13/2016 |
T. Whitlatch |
D1706 |
Line D tagger BPM/Quads |
03/18/2016 |
B. Zihlmann, T. Whitlatch |
D1694 |
HD/Tagger Sept2015-Jan 2016 surveys |
02/04/2016 |
T. Whitlatch |
D1682 |
Tagger/microscope |
11/12/2015 |
T. Whitlatch, A Barnes |
D1680 |
Fall 2015 Survey |
11/02/2015 |
A. Somov, T. Whitlatch |
D1672 |
High Granularity Detectors |
09/10/2015 |
A. Somov, T. Whitlatch |
D1663 |
Hall D Elevation Monitoring |
08/25/2015 |
T. Carstens, T. Whitlach |
D1625 |
HD Polarimeter |
04/21/2015 |
T. Whitlatch |
D1620 |
Hall D Tagger Goniometer Inspection |
04/08/2015 |
T. Whitlatch, H. Egiyan |
D1614 |
Hall D Low Granularity Detectors |
03/23/2015 |
T. Whitlatch, A. Somov |
D1612 |
HD Solenoid/Tgt survey 2015 |
03/20/2015 |
T. Whitlatch |
D1610 |
Hall D Tagger Goniometer Alignment |
03/11/2015 |
T. Whitlatch, H. Egiyan |
D1594 |
Hall D Elevation Monitoring |
01/23/2015 |
T. Carstens, T. Whitlach |
D1577 |
Survey of FDC 1-4 packages. |
10/29/2014 |
T. Whitlatch, H. Egiyan |
D1576 |
Fall 2014 Survey |
10/06/2014 |
T. Whitlatch, H. Egiyan |
D1574 |
Goniometer calibration. |
07/31/2014 |
T. Whitlatch, H. Egiyan, V. Kakoyan |
D1570 |
Start counter QC |
06/12/2014 |
T. Whitlatch, T. Carstens |
D1561 |
HD Tagger BPM/Harp |
05/02/2014 |
A. Freyberger, N. Okay |
D1559 |
Pair spectrometer mapper locations |
04/15/2014 |
Tim Whitlatch |
D1553 |
Tagger pole tip and fiducial locations. |
03/10/2014 |
T. Whitlatch |
D1547 |
Fcal crystal spacing. |
02/04/2014 |
John Leckey |
D1538 |
FDC 2a alignment. |
01/24/2014 |
B. Crahen, T. Whitlatch |
D1522 |
FCAL inspection |
11/21/2013 |
Tim Whitlatch |
D1521 |
Tagger magnet mapper inspection |
11/21/2013 |
Tim Whitlatch |
D1520 |
Hodoscope Plate Inspection |
11/21/2013 |
B. Crahen, T. Whitlatch |
D1519 |
FDC package inspection/fiducialization |
11/21/2013 |
Tim Whitlatch, Bill Crahen |
D1518 |
FDC package pre-alignment. |
08/08/2013 |
T. Whitlatch, W. Crahen, L. Lubomir |
D1511 |
Tagger magnet vacuum chamber/photon line flange. |
06/11/2013 |
T. Whitlatch, T Carstens |
D1503 |
Tagger magnet poletips / flanges |
04/15/2013 |
T. Whitlatch, T Carstens |
D1501 |
BCAL rail plates. |
03/27/2013 |
T. Whitlatch, T Carstens |
D1499 |
HD solenoid threaded hole locations. |
03/21/2013 |
F. Martin |
D1498 |
Tagger vacuum chamber inspection. |
03/20/2013 |
B. Crahen, T. Carstens |
D1494 |
Hall D Elevation Monitoring |
02/08/2013 |
T. Carstens, T. Whitlach |
D1487 |
FCAL frame |
12/20/2012 |
Tim Whitlatch |
D1474 |
Location of Hall D Cryo Building and Piers |
08/06/2012 |
A. Hageman, F. Martin |
D1473 |
Location of Hall D Cryo Building Corners |
07/25/2012 |
A. Hageman, F. Martin |
D1469 |
BCAL rail survey |
07/11/2012 |
D Rath, T Whitlatch |
D1432 |
Elevation Survey of Hall D Dump Berm |
02/07/2012 |
R. Yasky, K. Welch, C. Bitgood, T. Witherspoon |
D1431 |
Location of FDC Rails |
01/24/2012 |
T. Whitlatch, T. Carstens |
D1430 |
Location of Pair Spectrometer Rails |
01/19/2012 |
T. Whitlatch, T. Carstens |
D1427 |
Glue-x Upst Plenum disc. |
01/06/2012 |
T. Whitlatch, S. Razmyslovich |
D1424 |
Elevation Survey of Upper Platform Rails |
12/20/2011 |
T. Whitlatch, T. Carstens |
D1419 |
Elevation Survey of Hall D Berms |
11/15/2011 |
R. Yasky, K. Welch, C. Bitgood, T. Witherspoon |
D1415 |
Chimeneys on the Hall D Solenoid cryostats |
11/01/2011 |
Tim Whitlatch |
D1404 |
Check on Tunnel Extension walls |
08/05/2011 |
R.Yasky, C. Bitgood, T.Witherspoon, T.Whitlatch |
D1399 |
Check on Tunnel Extension floor |
07/13/2011 |
R.Yasky, C. Bitgood, T.Witherspoon, T.Whitlatch |
D1398 |
Check on Hall D photon beampipe b/w the Tagger & Hall D |
06/17/2011 |
R.Yasky, C. Bitgood, T.Witherspoon, T. Whitlatch |
D1395 |
Check on Hall D photon beampipe outside the Tagger hall |
05/09/2011 |
R.Yasky, C. Bitgood, T.Witherspoon, T. Whitlatch |
D1394 |
Check on Hall D photon beampipe in collimator cave |
04/21/2011 |
R.Yasky, C. Bitgood, T.Witherspoon, T. Whitlatch |
D1392 |
Check on Hall D photon beampipe |
04/18/2011 |
R.Yasky, C. Bitgood, T.Witherspoon, T. Whitlatch |
D1387 |
Check on Hall D collimator area beampipe and walls |
04/05/2011 |
T. Whitlatch, S. Razmyslovich |
D1383 |
Third check on Tagger photon beampipe (after concrete) |
03/17/2011 |
R.Yasky, C. Bitgood, T.Witherspoon |
D1382 |
Second Check on Tagger photon beampipe |
03/04/2011 |
R.Yasky, C. Bitgood, T.Witherspoon |
D1381 |
Check on Hall D photon beampipe |
02/22/2011 |
R.Yasky, C. Bitgood, T.Witherspoon |
D1380 |
Check on Tagger photon beampipe |
02/17/2011 |
R.Yasky, C. Bitgood, T.Witherspoon |
D1348 |
Check on Hall D rail trenches. |
11/16/2010 |
R.Yasky, C. Bitgood, T.Witherspoon, T.Whitlatch |
D1347 |
Check on Hall D collimator area walls and floor |
11/16/2010 |
R.Yasky, C. Bitgood, T.Witherspoon, T.Whitlatch |
D1337 |
Final solenoid pier survey after concrete. |
10/29/2010 |
R.Yasky, C. Bitgood, T.Witherspoon, T.Whitlatch |
D1314 |
Fourth check on solenoid pier plates |
08/26/2010 |
R.Yasky, C. Bitgood, T.Witherspoon, T.Whitlatch |
D1312 |
Check on Tunnel Extension / Tagger walls |
08/23/2010 |
C. Bitgood, T. Witherspoon, T. Whitlatch, R. Yasky |
D1311 |
Check on Tunnel Extension / Tagger floor elevation |
08/23/2010 |
C. Bitgood, T. Witherspoon, T. Whitlatch, R. Yasky |
D1310 |
Third check on solenoid pier plates |
08/17/2010 |
R.Yasky, C. Bitgood, T.Witherspoon, T.Whitlatch |
D1304 |
Second check on solenoid pier plates |
07/15/2010 |
R.Yasky, T.Witherspoon, T.Whitlatch |
D1297 |
Check on solenoid pier plates |
07/06/2010 |
R.Yasky, T.Witherspoon, T.Whitlatch |
D1294 |
Check on cyropipe penetrations |
06/29/2010 |
R.Yasky, T.Witherspoon, T.Whitlatch |
D1285 |
Check on Tunnel Extension mud slab elevation |
05/14/2010 |
C. Bitgood, T. Witherspoon, T. Whitlatch, R. Yasky |
D1281 |
Check on photon beampipe. |
04/30/2010 |
R.Yasky, T.Frye, T.Witherspoon, T.Whitlatch |
D1271 |
GlueX end plate inspections. |
03/17/2010 |
T. Whitlatch, S. Razmyslovich |
D1267 |
Check on photon control on Hall D site |
03/09/2010 |
R.Yasky, T.Frye, T.Witherspoon, T.Whitlatch |
D1253 |
Check on Hall D slab elevation |
12/09/2009 |
R.Yasky, T.Frye, T.Witherspoon |
D1246 |
Hall D solenoid coil inspections. |
10/21/2009 |
T. Carstens, F. Martin |
D1245 |
Check on slab elevation and control on Hall D site |
10/13/2009 |
R.Yasky, T.Frye, T.Witherspoon, S.Chandra, T.Whitlatch |
D1204 |
Hall D GlueX detector profiler. |
12/08/2008 |
W. Crahen, B. Kross, M. Stevens |
D1177 |
Sag check on Pb barrel colorimeter |
07/31/2008 |
Tim Whitlatch |
D1096 |
Gluex detector prototype flatness. |
02/13/2007 |
D. Carman, S. Taylor, B. Kross |
D1008 |
Scintillator Load Test. |
09/01/2005 |
P. Brindza |
|
|
|
|
|
|
|
|