DT # |
Description |
Date |
Recipient |
|
|
Z2063 |
SNS 2022 C005 final report |
01/20/2023 |
J. Fisher |
Z2045 |
SNS 2022 C004 final report - sent out as C004 |
07/25/2022 |
J. Fisher |
Z2044 |
SNS 2022 C003 final report - sent out as C003 |
07/25/2022 |
J. Fisher |
Z2043 |
SNS 2022 C002 final report - sent out as C002 |
07/25/2022 |
J. Fisher |
Z2042 |
SNS 2022 C001 final report - sent out as C001 |
07/25/2022 |
J. Fisher |
Z931 |
SNS HB vacuum vessel 04 inspection |
05/27/2004 |
T. Whitlach, B. Carpenter |
Z927 |
SNS HB space frame 12 inspection |
05/06/2004 |
T. Whitlach, B. Carpenter |
Z920 |
SNS HB vacuum vessel 07 inspection |
03/18/2004 |
T. Whitlach, B. Carpenter |
Z915 |
SNS HB space frame 07 inspection |
01/13/2004 |
T. Whitlach, B. Carpenter |
Z912 |
SNS MB07 arm survey |
12/15/2003 |
J. Preble, J. Hogan, J. Fischer, T. Whitlach |
Z902 |
SNS offset fixture inspection |
10/10/2003 |
J. Preble, B. Carpenter |
Z901 |
Cryomodule Assembly room pier distances |
10/02/2003 |
J. Preble, J. Hogan |
Z899 |
SNS MB06 arm survey |
09/30/2003 |
J. Hogan, T. Whitlach, M. Wiseman |
Z891 |
SNS MB04/05 arm survey |
09/03/2003 |
J. Hogan, T. Whitlach, M. Wiseman |
Z883 |
SNS mb space frame 08 |
08/04/2003 |
Tim Whitlatch and Brian Carpenter |
Z875 |
SNS HB SpaceFrame 02 |
07/02/2003 |
Tim Whitlatch, Brian Carpenter |
|
Z872 |
SNS cryomodule return end cap
10 |
06/16/2003 |
Ed Daly,Brian Carpenter |
|
Z871 |
Supply end cap 05 after
re-manufactured |
06/16/2003 |
Ed Daly,Brian Carpenter |
|
Z869 |
SNS cryomodule return end cap
05 re-inspection |
06/16/2003 |
Ed Daly,Brian Carpenter |
|
Z867 |
SNS Hi Beta Module 1 Flange movement |
06/03/2003 |
Joe Preble, Frank Humphrey |
|
Z862 |
Inspection of SNS Vacuum Vessel
09 |
05/07/2003 |
Tim Whitlatch and Brian Carpenter |
Z861 |
(Revision)Inspection High Beta space frame 01 SNS |
05/01/2003 |
Tim Whitlatch and Brian Carpenter |
Z855 |
Inspection of SNS Vacuum
Vessel hi beta 01 |
04/10/2003 |
Tim Whitlatch and Brian Carpenter |
Z836 |
Inspection of SNS Vacuum Vessel
06 |
01/09/2003 |
Tim Whitlatch and Brian Carpenter |
Z835 |
Inspection of SNS Vacuum Vessel
06 |
01/09/2003 |
Tim Whitlatch and Brian Carpenter |
Z834 |
SNS cryomodule return end cap
10 |
01/08/2003 |
Ed Daly,Brian Carpenter |
|
Z830 |
SNS cryomodule return end cap 06
after re-manifactured |
11/26/2002 |
Ed Daly,Brian Carpenter |
|
Z829 |
Supply end cap 05 after
re-manufactured |
11/26/2002 |
Ed Daly,Brian Carpenter |
|
Z827 |
SNS cryomodule supply end cap 07
after re-manufactured |
11/01/2002 |
Ed Daly,Brian Carpenter |
|
Z825 |
Inspection of SNS Space frame 05 |
10/31/2002 |
Tim Whitlatch and Brian Carpenter |
Z821 |
Inspection of SNS Vacuum Vessel
04 |
10/21/2002 |
Tim Whitlatch and Brian Carpenter |
Z819 |
SNS Spaceframe 2 re-inspection |
10/03/2002 |
Tim Whitlatch and Brian Carpenter |
Z814R |
Inspection of SNS Vacuum Vessel 03 |
09/23/2002 |
Tim Whitlatch and Brian Carpenter |
Z814 |
Inspection of SNS Vacuum Vessel
03 |
09/23/2002 |
Tim Whitlatch and Brian Carpenter |
Z813 |
Inspection of SNS Space frame 04 |
09/20/2002 |
Tim Whitlatch and Brian Carpenter |
Z809 |
SNS Bridging rings 8, 13, 15, and 19 |
09/12/2002 |
E. Daly, B. Carpenter |
|
Z808 |
Inspection of SNS supply and
return end cans 8 and 9. |
09/11/2002 |
E. Daly, B. Carpenter |
|
Z806 |
Inspection of SNS Space frame 03 |
08/29/2002 |
Tim Whitlatch and Brian Carpenter |
Z803 |
Inspection of SNS supply and return end cans 2-7 with bayonets
controlling roll |
08/26/2002 |
E.Daly, J.Preble, B. Carpenter |
|
Z796 |
SNS cryomodule supply end cap 04 |
07/23/2002 |
Ed Daly,Brian Carpenter |
|
Z795 |
SNS cryomodule return end cap 05 |
07/23/2002 |
Ed Daly,Brian Carpenter |
|
Z793R |
Inspection of SNS Space frame 02 |
07/16/2002 |
Tim Whitlatch and Brian Carpenter |
Z793 |
Inspection of SNS Space frame 02 |
07/16/2002 |
Tim Whitlatch and Brian Carpenter |
Z792 |
12 GeV lollipop inspection |
07/15/2002 |
K. Macha, J. Fischer |
|
Z785 |
SNS cryomodule return end cap #3. |
06/07/2002 |
Ed Daly,Brian Carpenter |
|
Z784 |
SNS cryomodule supply end cap #3. |
06/07/2002 |
Ed Daly,Brian Carpenter |
|
Z778 |
SNS cryomodule supply end cap 02
QC |
05/30/2002 |
E. Daly, B. Carpenter |
|
Z777 |
SNS cryomodule return end cap 02
QC |
05/30/2002 |
E. Daly, B. Carpenter |
|
Z767 |
Inspection of SNS Vacuum Vessel
02 |
05/09/2002 |
Tim Whitlatch and Brian Carpenter |
Z755 |
12Gev Space Frame 2 re-inspection |
04/09/2002 |
Tim Whitlatch, Brian Carpenter |
|
Z747 |
SNS cryomodule return end can 01 QC |
03/13/2002 |
E. Daly, B. Carpenter |
|
Z744 |
SNS 0.61 Beta space frame inspection |
02/28/2002 |
Whitlach, Daly |
|
Z743 |
SNS cryomodule supply end cap 01 QC |
02/22/2002 |
T. Whitlach, B. Carpenter |
|
Z742 |
SNS 0.61 Beta space frame inspection |
02/22/2002 |
Whitlach, Carpenter |
|
Z741 |
Inspection of SNS Vacuum Vessel
01 rail location at wheel placement |
02/22/2002 |
Tim Whitlatch and Brian Carpenter |
Z738 |
12 Gev cryomodule retun end cap 1&2 QC |
02/06/2002 |
T. Whitlach, B. Carpenter |
|
Z737 |
Inspection of SNS Vacuum Vessel 01 |
02/04/2002 |
Tim Whitlatch and Brian Carpenter |
Z735 |
12 Gev cryomodule supply end cap 1&2 QC |
01/29/2002 |
T. Whitlach, B. Carpenter |
|
Z731 |
SNS cavity transport rail inspection. |
01/14/2002 |
Brian Carpenter, Tim Whitlach |
|
Z724 |
SNS 0.61 Beta space frame inspection |
12/18/2001 |
Whitlach, Carpenter |
|
Z723 |
12 Gev Space Frame re-inspection |
12/18/2001 |
Whitlach, Carpenter |
|
Z717 |
12Gev Cryo. spaceframe |
11/06/2001 |
Brian Carpenter, Tim Whitlatch |
|
Z716 |
SNS Cryo. vacuum vessel |
11/06/2001 |
Brian Carpenter, Tim Whitlatch |
|
Z695 |
SNS Cryo. spaceframe |
8/27/01 |
Brian Carpenter, Tim Whitlatch |
Z691 |
SNS Cryo Rails |
8/10/01 |
Brian Carpenter |
Z690 |
SNS Cryo. vacuum vessel |
8/9/01 |
Brian Carpenter, Tim Whitlatch |
Z689 |
SNS Cryo. spaceframe |
8/7/01 |
Brian Carpenter, Tim Whitlatch |
|
|
|
|
|
|
|
|
|
|