Photos of Supported Detectors
Hall A ECAL
Super Module Assembly
1
Marc McMullen installs the last supermodule on the storage rack
2
Marc McMullen clamping and tightening frame screws
3
Marc McMullen measuring lead glass assembly
4
Marc McMullen releasing spring plates from the front flange
5
Wrapping foil on light-guide
6
Wrapping foil on assembled super-module
7
Tyler Lemon cutting springs
8
Tyler Lemon checking alignment during super-module's end-plate installation
9
Tightening chassis back-plate screws
10
Tightening back-plate screws
11
Taping foil
12
Super-modules bottom plate support with springs attached
13
Super-module
14
Super-module's support frame with end-plate attached
15
Super-module's lead-glass blocks wrapped in copper-foil
16
Super-module structural components engineering drawing
17
Super-module end-plate installation
18
Super-module end-plate installation
19
Super-module being assembled
20
Super-module's support frame
21
Springs
22
Spring-plate
23
Pablo Campero cutting spring
24
Pablo Campero assembling frame
25
Pablo Campero and Tyler Lemon tightening screws on end-plate of assembly jig
26
Pablo Campero and Tyler Lemon removing plate from in between end-plates
27
Pablo Campero and Tyler Lemon positioning assembly jig
28
Pablo Campero and Tyler Lemon checking allignment of lead-glass blocks
29
Modules in chassis front-view
30
Modules in chasis back-view
31
Mindy Leffel making final adjustments to set screws
32
Mindy Leffel loosening chassis cover-plate
33
Mindy Leffel inserting module into support frame
34
Mindy Leffel inserting end-plate with springs
35
Mindy Leffel cleaning spring-plates
36
Mindy Leffel assembling super-module
37
Mindy Leffel assembling lead-blocks in super-module
38
Mindy Leffel adjusting height of set screw
39
Loosening chassis back-plate screws
40
Light guide wrapped in foil
41
Installing end-plate screws
42
inserting spring-plate
43
Inserting spring-plate
44
Inserting screws
45
Gluing springs to spring-plates
46
Gluing spring-plates to end-plate
47
Gluing spring-plates to end-plate
48
Fixture to glue lead-glass blocks to light-guide
49
End-plate, spring-plates, and springs
50
ECAL super-modules assembly diagram
51
DSG working on Hall A ECAL
52
Cutting springs
53
Cutting Aluminum foil to wrap light guides
54
Cleaning springs
55
Cleaning spring-plates
56
Cleaning light-guide
57
Assembly jig
58
Aligning modules with clamp
59
George Jacobs installing screws in frame sides
60
George Jacobs loading the SM frame
61
George Jacobs positioning flange 1 in frame jig
62
Mindy Leffel_cutting foil to wrap lightguides
Next:
Super Module Heater Controls