1 Tyler Lemon, Sahin Arslan, Brian Eng, and Pablo Campero inspecting frame |
2 Tyler Lemon, Mindy Leffel, Sahin Arslan sliding frame into place |
3 Tyler Lemon reading frame schematics |
4 Tyler Lemon and Pablo Campero tightening screws |
5 Sahin Arslan tightening nut on RICH assembly base plate anchor |
6 Sahin Arslan on manlift assembling frame |
7 Sahin Arslan and Mindy Leffel assembling frame |
8 Pablo Campero, Brian Eng, Tyler Lemon, and Sahin Arslan attaching H-frame |
9 One side of RICH assembly structure assembled |
10 Mindy Leffel, Pablo Campero, and Sahin Arslan errecting one side of frame |
11 Mindy Leffel on manlift assembling frame |
12 Marc McMullen and Brian Eng moving gantry into position to lift sides of RICH assembly structure |
13 DSG using gantry crane to lift RICH assembly structure side to attach side to anchored base |
14 Brian Eng, Pablo Campero, Sahin Arslan, Tyler Lemon raising H-frame with gantry crane |
15 Amanda Hoebel and Pablo Campero assembling angle brackets for RICH assembly structure |
|