Photos of Supported Detectors
Hall B SVT
Installation for noise test in Hall B
1
SVT ready to transfer to Hall B
2
SVT lowered in Hall B.
3
SVT lifted in box
4
SVT installation
5
SVT installation
6
SVT installation
7
SVT installation
8
SVT entering Hall B
9
SVT electronics rack structure relocated in Hall B
10
SVT electronics rack structure
11
SVT Cover
12
SVT Cover transportation cart
13
SVT coming down
14
SVT chiller
15
SVT attachment to carriage
16
Sahin Arslan, Bob Miller, and Calvin Mealer checking SVT electronics rack structure
17
Sahin Arslan installing equipment in SVT electronics rack structure
18
Sahin Arslan helping to set the SVT electronics rack structure in the middle of the truck
19
Sahin Arslan and Mindy Leffel cabling
20
Safety belts used to connect and distribute weight of SVT electronics rack structure
21
Pablo Campero, Brian Eng, Amanda Hoebel, Tyler Lemon and Mary Ann Antonioli
22
Mary Ann Antonioli, Amanda Hoebel, Tyler Lemon and Pablo Campero during SVT transport
23
Lifting SVT electronics rack structure and testing its real weight (4.1K pounds) before move
24
Ensuring SVT electronics rack structure using safety belts by Sahin Arslan
25
Brian Eng connecting SVT module cables to crates to perform the in Hall noise test
26
Brian Eng and Marc McMullen installing crates in SVT electronics rack structure
27
Bob Miller on SVT
28
Bases of wood used to set SVT structure in place
29
Attaching crane hooks to SVT electronics rack structure containing the crates and electronics
Next:
MFC installation
Previous:
Decabling