Installation for noise test in Hall B

SVT ready to transfer to Hall B
1 SVT ready to transfer to Hall B
SVT lowered in Hall B
2 SVT lowered in Hall B.
SVT lifted in box
3 SVT lifted in box
SVT installation 4
4 SVT installation
SVT installation 3
5 SVT installation
SVT installation 2
6 SVT installation
SVT installation 1
7 SVT installation
SVT entering Hall B
8 SVT entering Hall B
SVT electronics rack structure relocated in Hall B
9 SVT electronics rack structure relocated in Hall B
SVT electronics rack structure
10 SVT electronics rack structure
SVT Cover
11 SVT Cover
SVT Cover-transportation cart
12 SVT Cover transportation cart
SVT coming down
13 SVT coming down
SVT chiller
14 SVT chiller
SVT attachment to carriage
15 SVT attachment to carriage
Sahin Arslan, Bob Miller, and Calvin Mealer checking SVT electronics rack structure
16 Sahin Arslan, Bob Miller, and Calvin Mealer checking SVT electronics rack structure
Sahin Arslan installing equipment in SVT electronics rack structure
17 Sahin Arslan installing equipment in SVT electronics rack structure
Sahin Arslan helping to set the SVT electronics rack structure  in the middle of the truck
18 Sahin Arslan helping to set the SVT electronics rack structure in the middle of the truck
Sahin Arslan and Mindy Leffel cabling
19 Sahin Arslan and Mindy Leffel cabling
Safety belts used to connect and distribute weight of SVT electronics rack structure
20 Safety belts used to connect and distribute weight of SVT electronics rack structure
Pablo Campero, Brian Eng, Amanda Hoebel, Tyler Lemon and Mary Ann Antonioli
21 Pablo Campero, Brian Eng, Amanda Hoebel, Tyler Lemon and Mary Ann Antonioli
Mary Ann Antonioli, Amanda Hoebel, Tyler Lemon and Pablo Campero during SVT transport
22 Mary Ann Antonioli, Amanda Hoebel, Tyler Lemon and Pablo Campero during SVT transport
Lifting SVT electronics rack structure  and testing its real weight (4.1K pounds) before move
23 Lifting SVT electronics rack structure and testing its real weight (4.1K pounds) before move
Ensuring SVT electronics rack structure using safety belts by Sahin Arslan
24 Ensuring SVT electronics rack structure using safety belts by Sahin Arslan
Brian Eng connecting SVT module cables to crates to perform the in Hall noise test
25 Brian Eng connecting SVT module cables to crates to perform the in Hall noise test
Brian Eng and Marc McMullen installing crates in SVT electronics rack structure
26 Brian Eng and Marc McMullen installing crates in SVT electronics rack structure
Bob Miller on SVT
27 Bob Miller on SVT
Bases of wood used to set SVT structure in place
28 Bases of wood used to set SVT structure in place
Attaching crane hooks to SVT electronics rack structure containing the crates and electronics
29 Attaching crane hooks to SVT electronics rack structure containing the crates and electronics