Present : Z.-E. Meziani I. Kominis S. Incerti
Discussion : - What has been done : * Final estimation of the longitudinal residual field along the z axis in the Hall A from the measurements performed during E95001 maintenance days : 26 mG from the UP ramp 31 mG from the DOWN ramp Technical note almost ready. Just need to take into account the effect of the lock-in time constant. * RTD files received from JP and Steffen. * Update of the kumac files used to average the water signal by Karl. - What needs to be done : * Finish technical note on H1 * Match all the RTD values with the Mac files * Finish water files averaging with the kumac files * Some H1 measurements during the EPR when the capacitors are bypassed ?