94010 Shift Checklist

Date: (mm/dd) 
           
           
           
           
           
Time (hh/mm, 24:00)
 
 
 
 
 
Your Initials
 
 
 
 
 
Beam Energy (MeV)
 
 
 
 
 
Beam Current (uA)
 
 
 
 
 
SPOT  X/Y (mm)
 
 
 
 
 
Abs Beam Position X/Y (< 0.3 mm) 
 
 
 
 
 
Bscope in Logbook (pg. #)
 
 
 
 
 
Mott Pol (logbook pg #) 
 
 
 
 
 
Moeller Pol (logbook pg #)
 
 
 
 
 
Visual Hall Inspection
 
 
 
 
 
Argon High/Low Pres. 
 
 
 
 
 
Ethane High/Low Pres. 
 
 
 
 
 
Recorded (Y/N)
 
 
 
 
 
Electron VDC Gas Flow
 
 
 
 
 
Hadron VDC Gas Flow
 
 
 
 
 
FPP Gas Flow
 
 
 
 
 
Electron Arm Angle
 
 
 
 
 
Hadron Arm Angle
 
 
 
 
 
Electron Arm Collimator 
 
 
 
 
 
Hadron Arm Collimator 
 
 
 
 
 
 
Page 1.1, V1.1 TJNAF Exp. 94010 Checklist
 
 
 
Electron Quad #1 (A) 
 
 
 
 
 
Electron Quad #2 (A) 
 
 
 
 
 
Electron Dipole (A) 
 
 
 
 
 
Electron Dipole Probe Low (T) 
 
 
 
 
 
Electron Dipole Probe High  (T) 
 
 
 
 
 
Electron Quad #3 (A) 
 
 
 
 
 
Hadron Quad #1 (A) 
 
 
 
 
 
Hadron Quad #2 (A) 
 
 
 
 
 
Hadron Dipole (A) 
 
 
 
 
 
Hadron Dipole Probe 1 (T) 
 
 
 
 
 
Hadron Quad #3 (A) 
 
 
 
 
 
Cyro Levels Checked? (He>60.0%, N>40%)
 
 
 
 
 
Electron VDC #1 HV (kV)
           
           
           
           
           
Electron VDC #2 HV (kV)
 
 
 
 
 
Hadron VDC #1 HV (kV)
 
 
 
 
 
Hadron VDC #2 HV (kV)
 
 
 
 
 
Electron Scintillator HV #1
 
 
 
 
 
Electron Scintillator HV #2
 
 
 
 
 
Electron Cherenkov HV 
 
 
 
 
 
Hadron Scintillator HV #1
 
 
 
 
 
Hadron Scintillator HV #2
 
 
 
 
 
 
Page 1.2, V1.1 TJNAF Exp. 94010 Checklist
 
 
 
 
 
 
e-gas Cerenkov HV OK?
 
 
 
 
 
h-gas Cerenkov HV OK?
 
 
 
 
 
e preshower HV OK?
 
 
 
 
 
e shower HV OK?
 
 
 
 
 
h shower HV OK?
 
 
 
 
 
FPP Cham-1/2,3/4 Thresh. (V) 
 
 
 
 
 
FPP Cham-3 LV Good/Bad
 
 
 
 
 
FPP Cham-4 LV Good/Bad
 
 
 
 
 
Carbon doors all out?
 
 
 
 
 
FPP Cham-1,2 HV off? 
 
 
 
 
 
FPP Cham-3 HV/Cur<10uA Good/Bad
 
 
 
 
 
FPP Cham-4 HV/Cur<10uA Good/Bad
 
 
 
 
 
Latest Run Number
           
           
           
           
           
Computer Deadtime
           
           
           
           
           
VDC Efficiency (% HRSE/HRSH) 
           
           
           
           
           
FPP Chamber Efficiency (%)
           
           
           
           
           
 
Page 1.3, V1.1 TJNAF Exp. 94010 Checklist
 
 
 
 
 
 
Data Disk
 
 
 
 
 
Event 2 Prescale
 
 
           
           
           
Event 4 Prescale
           
           
           
           
           
Event 1 Rate
 
 
 
 
 
Event 2 Rate
 
 
 
 
 
Event 3 Rate
 
 
 
 
 
Event 4 Rate
 
 
 
 
 
 
http://www.jlab.org/~gilman/e94-010_checklist.html
Page 1.4, V1.1 TJNAF Exp. 94010 Checklist