Jefferson Lab > Engineering> Safety Systems Group
Privacy and Security Notice

Safety Systems Group at Jefferson Lab

To 2007 Design Review

12 GeV Design Review - 2009
Last update: 9/14/09



Personnel Safety System (PSS)
PSS Final Design Review Agenda
PSS Final Design Review Charge
12Gev PSS Concept
12Gev PSS Design Criteria
12Gev Requirements Document
Network Communications 


Drawings - updated hourly:
CEBAF Site Layout  Hall D / Tagger Site Layout
Tagger Area Detail  Hall D Detail
Tagger Rack Layout  Hall D Rack Layout
Tagger Sys-A I/O  Hall D Sys-A I/O
Tagger Area Sweep Hall D Sweep 
Tagger Run/Safe Wiring  Hall D Run/Safe Wiring
Tagger Access Room Hall D Access Room
Tagger Access Room PLC Enclosure Hall D Access Room PLC Enclosure
Tagger Access Room Interlocks Hall D Access Room Interlocks
PSS Console Hall D - Injector Interface
Segment Control Panel Hall D ODH System
Sys.A Network Overview  Sys.B Network Overview 
Intercom System  Message Display System 
Video System  10th Pass Pwr. Supply Intfc. 
S. Linac Racks  S. Linac RF Interface (typ.) 
N. Linac Racks  N. Linac RF Interface (typ.) 
MCC Racks  MCC I/O Sys. A 
Hall D iFix Screenshot  System-A I/O Allocation 
Beam Stop Status  Beam Stop Control 
Mfg. Manuals:  
Safety Engineering Distributed Safety
Fail Safe Modules Automation Modules

Machine Protection System (MPS)
MPS Design Criteria
FSD Master Requirements
FSD Master Specifications

12Gev FSD Injector Zone Wiring Diagram
12Gev FSD N. Linac Zone Wiring Diagram
12Gev FSD S. Linac Zone Wiring Diagram
12Gev FSD Tagger Wiring Diagram
12Gev FSD Hall D Wiring Diagram
12Gev FSD Master Motherboard
12Gev FSD Master Daughterboard
Beam Envelope Limit System
BELS Design Criteria

12Gev BELS Block Diagram

Beam Current Monitor (BCM)

Oxygen Monitoring (ODH)

content by SSG Team

last updated May 31, 2007