Final Schedule - 2003

Date Weekday Accelerator Hall A Hall A Hall B Hall B Hall C Hall C Priority FEL Notes
    GeV/pass/Pol Experiment GeV/mA Experiment GeV/nA Experiment GeV/mA Hall Status 1-11
01/01/03 Wednesday Holiday  Holiday      Holiday      Holiday               1 6  
01/02/03 Thursday Restore  –      –      –                
01/03/03 Friday Maintenance  –      –      –                
01/04/03 Saturday Restore  –      –      –                
01/05/03 Sunday Restore  –      –      –                
01/06/03 Monday 0.990/High  E01-012   1.046/15/p   e1   2.036/50/p   G0 Commission   3.026/40/p    A/C/B     FEL On      
01/07/03 Tuesday 0.990/High  Spin Duality   1.046/15/p   e1   2.036/50/p   G0 Commission   3.026/40/p    A/C/B     FEL On      
01/08/03 Wednesday 0.990/High  E01-012   4.016/15/p   e1   2.036/50/p   G0 Commission   3.026/40/p    A/C/B     FEL On      
01/09/03 Thursday 0.990/High  E01-012   4.016/15/p   e1   2.036/50/p   G0 Commission   3.026/40/p    C/B/A     FEL On      
01/10/03 Friday 0.990/High  E01-012   4.016/15/p   e1   2.036/50/p   G0 Commission   3.026/40/p    C/B/A     FEL On      
01/11/03 Saturday 0.990/High  E01-012   4.016/15/p   e1   2.036/50/p   G0 Commission   3.026/40/p    C/B/A          
01/12/03 Sunday 0.990/High  E01-012   4.016/15/p   e1   2.036/50/p   G0 Commission   3.026/40/p    B/C/A          
01/13/03 Monday 0.990/High  E01-012   5.006/15/p   e1   2.036/50/p   G0 Commission   3.026/40/p    B/C/A     FEL On      
01/14/03 Tuesday 0.990/High  E01-012   5.006/15/p   e1   2.036/50/p   G0 Commission   3.026/40/p    B/C/A     FEL On      
01/15/03 Wednesday 0.990/High  E01-012   5.006/15/p   e1   2.036/50/p   G0 Commission   3.026/40/p    C/B/A     FEL On      
01/16/03 Thursday 0.990/High  E01-012   5.006/15/p   e1   2.036/50/p   G0 Commission   3.026/40/p    C/B/A     FEL On      
01/17/03 Friday 0.990/High  E01-012   5.006/15/p   e1   2.036/50/p   G0 Commission   3.026/40/p    C/B/A     FEL On      
01/18/03 Saturday 0.990/High  E01-012   5.006/15/p   e1   2.036/50/p   G0 Commission   3.026/40/p    C/B/A          
01/19/03 Sunday 0.990/High  E01-012   5.006/15/p   e1   2.036/50/p   G0 Commission   3.026/40/p    C/B/A          
01/20/03 Monday 0.990/High  E01-012   5.006/15/p   e1   2.036/50/p   G0 Commission   3.026/40/p    C/B/A          
01/21/03 Tuesday 0.990/High  E01-012   5.006/15/p   e1   2.036/50/p   G0 Commission   3.026/40/p    C/B/A          
01/22/03 Wednesday 0.990/High  E01-012   5.006/15/p   e1   2.036/50/p   G0 Commission   3.026/40/p    C/B/A          
01/23/03 Thursday 0.990/High  E01-012   5.006/15/p   e1   2.036/50/p   G0 Commission   3.026/40/p    C/B/A          
01/24/03 Friday 0.990/High  E01-012   5.006/15/p   e1   2.036/50/p   G0 Commission   3.026/40/p    A/C/B          
01/25/03 Saturday 0.990/High  E01-012   5.006/15/p   e1   2.036/50/p   G0 Commission   3.026/40/p    A/C/B          
01/26/03 Sunday 0.990/High  E01-012   5.006/15/p   e1   2.036/50/p   G0 Commission   3.026/40/p    A/C/B          
01/27/03 Monday 1.000/High  E01-012   5.056/15/p   DC repair      G0 Move           FEL On      
01/28/03 Tuesday 1.000/High  E01-012   5.056/15/p   DC repair      G0 Move           FEL On      
01/29/03 Wednesday 1.000/High  E01-012   5.056/15/p   DC repair      G0 Move           FEL On      
01/30/03 Thursday 1.000/High  E01-012   5.056/15/p   DC repair      G0 Move           FEL On      
01/31/03 Friday 1.000/High  E01-012   5.056/15/p   DC repair      G0 Move           FEL On      
02/01/03 Saturday 1.000/High  E01-012   5.056/15/p   DC repair      G0 Move             1 6  
02/02/03 Sunday 1.000/High  E01-012   5.056/15/p   DC repair      G0 Move                
02/03/03 Monday 1.000/High  E01-012   5.056/15/p   DC repair      G0 Move           FEL On      
02/04/03 Tuesday 1.000/High  E01-012   5.056/15/p   DC repair      G0 Move           FEL On      
02/05/03 Wednesday 1.000/High  E01-012   5.056/15/p   DC repair      G0 Move           FEL On      
02/06/03 Thursday 1.000/High  E01-012   5.056/15/p   DC repair      G0 Move           FEL On      
02/07/03 Friday 1.000/High  E01-012   3.056/15/p   DC repair      G0 Move           FEL On      
02/08/03 Saturday 1.000/High  E01-012   3.056/15/p   DC repair      G0 Move                
02/09/03 Sunday 1.000/High  E01-012   3.056/15/p   DC repair      G0 Move                
02/10/03 Monday 1.000/High  E01-012   3.056/15/p   DC repair      G0 Move           FEL On      
02/11/03 Tuesday 1.000/High  E01-012   3.056/15/p   DC repair      G0 Move           FEL On      
02/12/03 Wednesday 1.000/High  E01-012   3.056/15/p   DC repair      G0 Move           FEL On      
02/13/03 Thursday 1.000/High  E01-012   3.056/15/p   DC repair      G0 Move           FEL On      
02/14/03 Friday 1.000/High  Install Septum      DC repair      G0 Move           FEL On      
02/15/03 Saturday 1.000/High  Install Septum      DC repair      G0 Move                
02/16/03 Sunday 1.000/High  Install Septum      DC repair      G0 Move                
02/17/03 Monday 1.000/High  Install Septum      DC repair      G0 Move                
02/18/03 Tuesday 1.000/High  Install Septum      DC repair      G0 Move                
02/19/03 Wednesday 1.000/High  Install Septum      DC repair      G0 Move                
02/20/03 Thursday Maintenance  Install Septum      DC repair      G0 Move               7  
02/21/03 Friday Maintenance  Install Septum      DC repair      G0 Move                
02/22/03 Saturday Maintenance  Install Septum      DC repair      G0 Move                
02/23/03 Sunday Maintenance  Install Septum      DC repair      G0 Move                
02/24/03 Monday Maintenance  Install Septum      DC repair      G0 Move                
02/25/03 Tuesday Maintenance  Install Septum      DC repair      G0 Move                
02/26/03 Wednesday Maintenance  Install Septum      DC repair      G0 Move                
02/27/03 Thursday Maintenance  Install Septum      DC repair      G0 Move                
02/28/03 Friday Maintenance  Install Septum      DC repair      G0 Move                
03/01/03 Saturday Maintenance  Install Septum      DC repair      G0 Move               1 6  
03/02/03 Sunday Maintenance  Install Septum      DC repair      G0 Move                
03/03/03 Monday Maintenance  Install Septum      DC repair      G0 Move                
03/04/03 Tuesday Maintenance  Install Septum      DC repair      G0 Move                
03/05/03 Wednesday Maintenance  Install Septum      DC repair      G0 Move                
03/06/03 Thursday Maintenance  Install Septum      DC repair      G0 Move                
03/07/03 Friday Maintenance  Install Septum      DC repair      G0 Move                
03/08/03 Saturday Maintenance  Install Septum      DC repair      G0 Move                
03/09/03 Sunday Maintenance  Install Septum      DC repair      G0 Move                
03/10/03 Monday Maintenance  Install Septum      DC repair      G0 Move                
03/11/03 Tuesday Maintenance  Install Septum      DC repair      G0 Move                
03/12/03 Wednesday Maintenance  Install Septum      DC repair      G0 Move                
03/13/03 Thursday Maintenance  Install Septum      DC repair      G0 Move                
03/14/03 Friday Maintenance  Install Septum      DC repair      G0 Move                
03/15/03 Saturday Maintenance  Install Septum      DC repair      G0 Move                
03/16/03 Sunday Maintenance  Install Septum      DC repair      G0 Move                
03/17/03 Monday Maintenance  Install Septum      DC repair      G0 Move                
03/18/03 Tuesday Maintenance  Install Septum      DC repair      G0 Move                
03/19/03 Wednesday Maintenance  Install Septum      DC repair      G0 Move                
03/20/03 Thursday Maintenance  Install Septum      DC repair      G0 Move                
03/21/03 Friday Maintenance  Install Septum      DC repair      G0 Move                
03/22/03 Saturday Maintenance  Install Septum      DC repair      G0 Move                
03/23/03 Sunday Maintenance  Install Septum      DC repair      G0 Move                
03/24/03 Monday Maintenance  Install Septum      DC repair      G0 Move                
03/25/03 Tuesday Maintenance  Install Septum      DC repair      G0 Move                
03/26/03 Wednesday Maintenance  Install Septum      DC repair      G0 Move                
03/27/03 Thursday Maintenance  Install Septum      DC repair      G0 Move                
03/28/03 Friday Maintenance  Install Septum      DC repair      G0 Move                
03/29/03 Saturday Maintenance  Install Septum      DC repair      G0 Move                
03/30/03 Sunday Maintenance  Install Septum      DC repair      G0 Move                
03/31/03 Monday Maintenance  Install Septum      DC repair      G0 Move                
04/01/03 Tuesday Maintenance  Install Septum      DC repair      G0 Move               1 5  
04/02/03 Wednesday Maintenance  Install Septum      DC repair      G0 Move                
04/03/03 Thursday Restore  Install Septum      DC repair      G0 Move                
04/04/03 Friday Restore  Install Septum      DC repair      G0 Move                
04/05/03 Saturday Restore  Install Septum      DC repair      G0 Move                
04/06/03 Sunday Restore  Install Septum      DC repair       E00-002 Comm  2.235/50             
04/07/03 Monday 1.087  Install Septum      e1 Comm   5.496/50/p   E00-002 Comm   2.235/50    B/C     FEL On      
04/08/03 Tuesday 1.087  Install Septum      e1 Comm   5.496/50/p   E00-002 Comm   2.235/50    B/C     FEL On      
04/09/03 Wednesday 1.087  Install Septum      e1 Comm   5.496/50/p   E00-002 Comm   2.235/50    B/C     FEL On      
04/10/03 Thursday 1.087  Install Septum      e1   5.496/50/p   E00-002 Comm   2.235/50    C/B     FEL On      
04/11/03 Friday 1.087  Install Septum      e1   5.496/50/p    E00-002  2.235/50    C/B     FEL On      
04/12/03 Saturday 1.087  Install Septum      e1   5.496/50/p   F2N   2.235/50    C/B          
04/13/03 Sunday 1.087  Install Septum      e1   5.496/50/p   E00-002   2.235/50    B/C          
04/14/03 Monday 1.087  Install Septum      e1   5.496/50/p   E00-002   2.235/50    B/C     FEL On      
04/15/03 Tuesday 1.087  Install Septum      e1   5.496/50/p   E00-002   2.235/50    B/C     FEL On      
04/16/03 Wednesday 1.087  Install Septum      e1   5.496/50/p   E00-002   2.235/50    B/C     FEL On      
04/17/03 Thursday 1.087  Install Septum      e1   5.496/50/p   E00-002   4.409/50    C/B     FEL On      
04/18/03 Friday 1.087  Install Septum      e1   5.496/50/p   E00-002   4.409/50    C/B     FEL On      
04/19/03 Saturday 1.087  Install Septum      e1   5.496/50/p   E00-002   4.409/50    C/B          
04/20/03 Sunday 1.087  Install Septum      e1   5.496/50/p   E00-002   4.409/50    C/B          
04/21/03 Monday 1.087  Install Septum      e1   5.496/50/p   E00-002   5.496/50    C/B     FEL On      
04/22/03 Tuesday 1.087  Install Septum      e1   5.496/50/p   E00-002   5.496/50    C/B     FEL On      
04/23/03 Wednesday 1.087  Install Septum      e1   5.496/50/p   E00-002   5.496/50    C/B     FEL On      
04/24/03 Thursday 1.087  Install Septum      e1   5.496/50/p   E00-002   3.042/50    C/B     FEL On      
04/25/03 Friday 1.087  Install Septum      e1   5.496/50/p   E00-002   3.042/50    C/B     FEL On      
04/26/03 Saturday Open House  –      –      –                
04/27/03 Sunday 1.087  Comm Hall      e1   5.496/50/p   E00-002   3.042/50    A/C/B          
04/28/03 Monday Energy Change  Comm Septum      g2b   3.792/50   E00-002   3.042/50    A/C/B     FEL On      
04/29/03 Tuesday 0.75  E97-110   1.542/15/p   g2b   3.792/50   E00-002   3.042/50    A/C/B     FEL On      
04/30/03 Wednesday 0.75  E97-110   1.542/15/p   g2b   3.792/50   E00-002   3.042/50    A/C/B     FEL On      
05/01/03 Thursday 0.75  E97-110   1.542/15/p   g2b   3.792/50   E00-002   3.042/50    A/C/B     FEL On      
05/02/03 Friday 0.75  E97-110   1.542/15/p   g2b   3.792/50   E00-002   3.042/50    B/A/C     FEL On      
05/03/03 Saturday 0.75  E97-110   1.542/15/p   g2b   3.792/50   E00-002   3.042/50    B/A/C         1 5  
05/04/03 Sunday 0.75  E97-110   1.542/15/p   g2b   3.792/50   E00-002   3.042/50    B/A/C          
05/05/03 Monday 0.75  E97-110   1.542/15/p   g2b   3.792/50   E00-002   3.042/50    B/A/C          
05/06/03 Tuesday 0.75  E97-110   1.542/15/p   g2b   3.792/50   E00-002   3.042/50    B/A/C          
05/07/03 Wednesday Maint/Change E  E97-110   1.542/15/p   e1   5.496/50/p    E01-002  5.496/100    C/A/B          
05/08/03 Thursday 1.087  E97-110   1.148/15/p   e1   5.496/50/p   Baryon Reson.   5.496/100    C/A/B          
05/09/03 Friday 1.087  E97-110   1.148/15/p   e1   5.496/50/p   E01-002   5.496/100    C/A/B          
05/10/03 Saturday 1.087  E97-110   1.148/15/p   e1   5.496/50/p   E01-002   5.496/100    C/A/B          
05/11/03 Sunday 1.087  E97-110   1.148/15/p   e1   5.496/50/p   E01-002   5.496/100    C/A/B          
05/12/03 Monday 1.087  E97-110   1.148/15/p   e1   5.496/50/p   E01-002   5.496/100    C/A/B     FEL On      
05/13/03 Tuesday 1.087  E97-110   1.148/15/p   e1   5.496/50/p   E01-002   5.496/100    C/A/B     FEL On      
05/14/03 Wednesday 1.087  E97-110   1.148/15/p   e1   5.496/50/p   E01-002   5.496/100    C/A/B     FEL On      
05/15/03 Thursday 1.087  E97-110   1.148/15/p   e1   5.496/50/p   E01-002   5.496/100    A/B/C     FEL On      
05/16/03 Friday 1.087  E97-110   2.235/15/p   e1   5.496/50/p   E01-002   5.496/100    A/B/C     FEL On      
05/17/03 Saturday 1.087  E97-110   2.235/15/p   e1   5.496/50/p   E01-002   5.496/100    A/B/C          
05/18/03 Sunday 1.087  E97-110   2.235/15/p   e1   5.496/50/p   E01-002   5.496/100    A/B/C          
05/19/03 Monday 1.087  E97-110   2.235/15/p   e1   5.496/50/p   E01-002   5.496/100    A/B/C     FEL On      
05/20/03 Tuesday 1.087  E97-110   3.322/15/p   e1   5.496/50/p   E01-002   5.496/100    A/B/C     FEL On      
05/21/03 Wednesday Acc. Dev.  –      –      –           FEL On      
05/22/03 Thursday Acc. Dev.  –      –      –                
05/23/03 Friday Acc. Dev.  –      –      –                
05/24/03 Saturday Down  –      –      –                
05/25/03 Sunday Down  –      –      –                
05/26/03 Monday Holiday  –      –      –                
05/27/03 Tuesday Restore  –      –      –                
05/28/03 Wednesday Restore  –      –      –                
05/29/03 Thursday Restore  –      –      –                
05/30/03 Friday 1.087  Configure Hall A      e1   5.496/50/p   E01-002   5.496/100    C/B         6  
05/31/03 Saturday 1.087  Configure Hall A      e1   5.496/50/p   E01-002   5.496/100    C/B          
06/01/03 Sunday 1.087  Configure Hall A      e1   5.496/50/p   E01-002   5.496/100    C/B          
06/02/03 Monday 1.087  Configure Hall A      e1   5.496/50/p   E01-002   5.496/100    C/B     FEL On      
06/03/03 Tuesday 1.087  Configure Hall A      e1   5.496/50/p   E01-002   5.496/100    C/B     FEL On     1 5  
06/04/03 Wednesday 1.087  Configure Hall A      e1   5.496/50/p   E01-002   5.496/100    C/B     FEL On      
06/05/03 Thursday 1.087  Configure Hall A      e1   5.496/50/p   E01-002   5.496/100    C/B     FEL On      
06/06/03 Friday 1.087  Configure Hall A      e1   5.496/50/p   E01-002   5.496/100    B/C     FEL On      
06/07/03 Saturday 1.087  Configure Hall A      e1   5.496/50/p   E01-002   5.496/100    B/C          
06/08/03 Sunday 1.087  Configure Hall A      e1   5.496/50/p   E01-002   5.496/100    B/C          
06/09/03 Monday 1.087  Configure Hall A      e1   5.496/50/p   E01-002   5.496/100    B/C     FEL On      
06/10/03 Tuesday 1.087  Configure Hall A      e1   5.496/50/p   E01-002   5.496/100    B/C     FEL On      
06/11/03 Wednesday 1.087  Configure Hall A      e1   5.496/50/p   E01-002   5.496/100    B/C     FEL On      
06/12/03 Thursday 1.087  Configure Hall A      e1   5.496/50/p   E01-002   5.496/100    B/C     FEL On      
06/13/03 Friday 1.087  Configure Hall A      e1   5.496/50/p   E01-002   5.496/100    C/B     FEL On      
06/14/03 Saturday 1.087  Configure Hall A      e1   5.496/50/p   E01-002   5.496/100    C/B          
06/15/03 Sunday 1.087  Configure Hall A      e1   5.496/50/p   E01-002   5.496/100    C/B          
06/16/03 Monday 1.087  Configure Hall A      e1   5.496/50/p   E01-002   5.496/100    C/B     FEL On      
06/17/03 Tuesday 1.087  Configure Hall A      e1   5.496/50/p   E01-002   5.496/100    C/B     FEL On      
06/18/03 Wednesday 1.087  Configure Hall A      e1   5.496/50/p   E01-002   5.496/100    C/B     FEL On      
06/19/03 Thursday 1.087  Configure Hall A      e1   5.496/50/p   E01-002   5.496/100    C/B     FEL On      
06/20/03 Friday 1.087  Configure Hall A      e1   5.496/50/p   E01-002   5.496/100    B/C     FEL On      
06/21/03 Saturday 1.087  Configure Hall A      e1   5.496/50/p   E01-002   5.496/100    B/C          
06/22/03 Sunday 1.087  Configure Hall A      e1   5.496/50/p   E01-002   5.496/100    B/C          
06/23/03 Monday 1.087  Configure Hall A      e1   5.496/50/p   E01-002   5.496/100    B/C     FEL On      
06/24/03 Tuesday 1.087  Configure Hall A      e1   5.496/50/p   E01-002   5.496/100    B/C     FEL On      
06/25/03 Wednesday 1.087  Configure Hall A      e1   5.496/50/p   E01-002   5.496/100    B/C          
06/26/03 Thursday 1.087  Configure Hall A      e1   5.496/50/p   E01-002   5.496/100    C/B          
06/27/03 Friday 1.087  Configure Hall A      e1   5.496/50/p    E00-116  5.496/100    C/B          
06/28/03 Saturday 1.087  Configure Hall A      e1   5.496/50/p   Duality   5.496/100    C/B          
06/29/03 Sunday 1.087  Configure Hall A      e1   5.496/50/p   E00-116   5.496/100    C/B          
06/30/03 Monday 1.087  Configure Hall A      e1   5.496/50/p   E00-116   5.496/100    C/B          
07/01/03 Tuesday 1.087  Configure Hall A      e1   5.496/50/p   E00-116   5.496/100    C/B          
07/02/03 Wednesday Maintenance  Configure Hall A      –      –                
07/03/03 Thursday Maintenance  Configure Hall A      –      –               1 5  
07/04/03 Friday Holiday  –      –      –                
07/05/03 Saturday Down  –      –      –                
07/06/03 Sunday Down  –      –      –                
07/07/03 Monday Restore  Configure Hall A      –      –                
07/08/03 Tuesday Restore  Configure Hall A      –      –                
07/09/03 Wednesday 1.038  Configure Hall A      e1   3.172/50/p    E01-004 Comm  4.210/100    C/B     FEL On      
07/10/03 Thursday 1.038  Configure Hall A      e1   3.172/50/p   E01-004 Comm   4.210/100    C/B     FEL On      
07/11/03 Friday 1.038  Configure Hall A      e1   3.172/50/p    E01-004  4.210/100    C/B     FEL On      
07/12/03 Saturday 1.038  Configure Hall A      e1   3.172/50/p   Pion FF   4.210/100    C/B          
07/13/03 Sunday 1.038  Configure Hall A      e1   3.172/50/p   E01-004   4.210/100    C/B          
07/14/03 Monday 1.038  Configure Hall A      e1   3.172/50/p   E01-004   4.210/100    C/B     FEL On      
07/15/03 Tuesday 1.038  Configure Hall A      e1   3.172/50/p   E01-004   4.210/100    B/C     FEL On      
07/16/03 Wednesday 1.038  Configure Hall A      e1   3.172/50/p   E01-004   4.210/100    B/C     FEL On      
07/17/03 Thursday 1.038  Configure Hall A      e1   3.172/50/p   E01-004   4.210/100    B/C     FEL On      
07/18/03 Friday 1.038  Configure Hall A      e1   3.172/50/p   E01-004   4.210/100    B/C     FEL On      
07/19/03 Saturday 1.038  Configure Hall A      e1   3.172/50/p   E01-004   4.210/100    B/C          
07/20/03 Sunday 1.038  Configure Hall A      e1   3.172/50/p   E01-004   4.210/100    B/C          
07/21/03 Monday 1.038  Configure Hall A      e1   3.172/50/p   E01-004   4.210/100    B/C     FEL On      
07/22/03 Tuesday 1.038  Configure Hall A      e1   3.172/50/p   E01-004   4.210/100    C/B     FEL On      
07/23/03 Wednesday 1.038  Configure Hall A      e1   3.172/50/p   E01-004   5.248/100    C/B     FEL On      
07/24/03 Thursday 1.038  Configure Hall A      e1   3.172/50/p   E01-004   5.248/100    C/B     FEL On      
07/25/03 Friday 1.038  Configure Hall A      e1   3.172/50/p   E01-004   5.248/100    C/B     FEL On      
07/26/03 Saturday 1.038  Configure Hall A      e1   3.172/50/p   E01-004   5.248/100    C/B          
07/27/03 Sunday 1.038  Configure Hall A      e1   3.172/50/p   E01-004   5.248/100    C/B          
07/28/03 Monday 1.038  Configure Hall A      e1   3.172/50/p   E01-004   5.248/100    C/B     FEL On      
07/29/03 Tuesday 1.038  Configure Hall A      e1   3.172/50/p   E01-004   5.248/100    C/B     FEL On      
07/30/03 Wednesday 0.93  Configure Hall A      eg2 Install      –       C/B     FEL On      
07/31/03 Thursday 0.93  Configure Hall A      eg2 Install      E01-004   3.772/100    C/B     FEL On      
08/01/03 Friday 0.93  Configure Hall A      eg2 Comm   4.702/50   E01-004   3.772/100    B/C     FEL On      
08/02/03 Saturday 0.93  Configure Hall A      eg2 Comm   4.702/50   E01-004   3.772/100    B/C          
08/03/03 Sunday 0.93  Configure Hall A      eg2 Comm   4.702/50   E01-004   3.772/100    B/C         1 5  
08/04/03 Monday Maintenance  Configure Hall A      –      –                
08/05/03 Tuesday Maintenance  Configure Hall A      –      –                
08/06/03 Wednesday Restore  Configure Hall A      –      –                
08/07/03 Thursday Restore  Configure Hall A      –      –                
08/08/03 Friday 0.93  Configure Hall A      eg2 Comm   4.702/50   E01-004   4.702/100    B/C          
08/09/03 Saturday 0.93  Configure Hall A      eg2 Comm   4.702/50   E01-004   4.702/100    B/C          
08/10/03 Sunday 0.93  Configure Hall A      eg2 Comm   4.702/50   E01-004   4.702/100    B/C          
08/11/03 Monday 0.93  Configure Hall A      eg2 Comm   4.702/50   E01-004   4.702/100    B/C     FEL On      
08/12/03 Tuesday 1.038  Configure Hall A      eg2   5.248/50    E00-108  5.248/100    A/C/B     FEL On      
08/13/03 Wednesday 1.038  Configure Hall A      eg2   5.248/50   Meson Duality   5.248/100    A/C/B     FEL On      
08/14/03 Thursday 1.038  Configure Hall A      eg2   5.248/50   E00-108   5.248/100    A/C/B     FEL On      
08/15/03 Friday 1.038  Configure Hall A      eg2   5.248/50   E00-108   5.248/100    A/C/B     FEL On      
08/16/03 Saturday 1.038  Configure Hall A      eg2   5.248/50   E00-108   5.248/100    A/C/B          
08/17/03 Sunday 1.038  Configure Hall A      eg2   5.248/50   E00-108   5.248/100    A/C/B          
08/18/03 Monday 1.038  Configure Hall A      eg2   5.248/50   E00-108   5.248/100    A/C/B     FEL On      
08/19/03 Tuesday 1.038  Configure Hall A      eg2   5.248/50   E00-108   5.248/100    A/C/B     FEL On      
08/20/03 Wednesday 1.038  Configure Hall A      eg2   5.248/50   E00-108   5.248/100    C/B/A     FEL On      
08/21/03 Thursday 1.038  Configure Hall A      eg2   5.248/50   E00-108   5.248/100    C/B/A     FEL On      
08/22/03 Friday 1.038  Configure Hall A      eg2   5.248/50   E00-108   5.248/100    C/B/A     FEL On      
08/23/03 Saturday 1.038  Configure Hall A      eg2   5.248/50   E00-108   5.248/100    C/B/A          
08/24/03 Sunday 1.038  Configure Hall A      eg2   5.248/50   E00-108   5.248/100    C/B/A          
08/25/03 Monday 1.038  Configure Hall A      eg2   5.248/50   E00-108   5.248/100    C/B/A     FEL On      
08/26/03 Tuesday 1.038  Configure Hall A      eg2   5.248/50   E00-108   5.248/100    C/B/A     FEL On      
08/27/03 Wednesday 1.038  Configure Hall A      eg2   5.248/50   E00-108   5.248/100    C/B/A     FEL On      
08/28/03 Thursday 1.038  Configure Hall A      eg2   5.248/50   E00-108   5.248/100    C/B/A     FEL On      
08/29/03 Friday 1.038  Configure Hall A      eg2   5.248/50   E00-108   5.248/100    C/B/A     FEL On      
08/30/03 Saturday Down  Configure Hall A      –      –                
08/31/03 Sunday Down  Configure Hall A      –      –                
09/01/03 Monday Holiday  Configure Hall A      –      –                
09/02/03 Tuesday Down  Configure Hall A      –      G0 Installation               7  
09/03/03 Wednesday Down  Configure Hall A      –      G0 Installation               1 5  
09/04/03 Thursday Down  Configure Hall A      –      G0 Installation                
09/05/03 Friday Down  Configure Hall A      –      G0 Installation                
09/06/03 Saturday Down  Configure Hall A      –      G0 Installation                
09/07/03 Sunday Down  Configure Hall A      –      G0 Installation                
09/08/03 Monday Down  Configure Hall A      –      G0 Installation                
09/09/03 Tuesday Down  Configure Hall A      –      G0 Installation                
09/10/03 Wednesday Down  Configure Hall A      –      G0 Installation                
09/11/03 Thursday Down  Configure Hall A      –      G0 Installation                
09/12/03 Friday Down  Configure Hall A      –      G0 Installation                
09/13/03 Saturday Down  Configure Hall A      –      G0 Installation                
09/14/03 Sunday Down  Configure Hall A      –      G0 Installation                
09/15/03 Monday Down  Configure Hall A      –      G0 Installation                
09/16/03 Tuesday Down  Configure Hall A      –      G0 Installation                
09/17/03 Wednesday Down  Configure Hall A      –      G0 Installation                
09/18/03 Thursday Down  Configure Hall A      –      G0 Installation                
09/19/03 Friday Down  Configure Hall A      –      G0 Installation                
09/20/03 Saturday Down  Configure Hall A      –      G0 Installation                
09/21/03 Sunday Down  Configure Hall A      –      G0 Installation                
09/22/03 Monday Down  Configure Hall A      –      G0 Installation                
09/23/03 Tuesday Down  Configure Hall A      –      G0 Installation                
09/24/03 Wednesday Down  Configure Hall A      –      G0 Installation                
09/25/03 Thursday Down  Configure Hall A      –      G0 Installation                
09/26/03 Friday Down  Configure Hall A      –      G0 Installation                
09/27/03 Saturday Down  Configure Hall A      –      G0 Installation                
09/28/03 Sunday Down  Configure Hall A      –      G0 Installation                
09/29/03 Monday Down  Configure Hall A      –      G0 Installation                
09/30/03 Tuesday Down  Configure Hall A      –      G0 Installation                
10/01/03 Wednesday Down  Configure Hall A      WC Repair      G0 Installation                
10/02/03 Thursday Down  Configure Hall A      WC Repair      G0 Installation                
10/03/03 Friday Down  Configure Hall A      WC Repair      G0 Installation                
10/04/03 Saturday Down  Configure Hall A      WC Repair      G0 Installation                
10/05/03 Sunday Down  Configure Hall A      WC Repair      G0 Installation                
10/06/03 Monday Down  Configure Hall A      WC Repair      G0 Installation                
10/07/03 Tuesday Down  Configure Hall A      WC Repair      G0 Installation                
10/08/03 Wednesday Down  Configure Hall A      WC Repair      G0 Installation                
10/09/03 Thursday Down  Configure Hall A      WC Repair      G0 Installation                
10/10/03 Friday Down  Configure Hall A      WC Repair      G0 Installation                
10/11/03 Saturday Down  Configure Hall A      WC Repair      G0 Installation                
10/12/03 Sunday Down  Configure Hall A      WC Repair      G0 Installation                
10/13/03 Monday Down  Configure Hall A      WC Repair      G0 Installation                
10/14/03 Tuesday Down  Configure Hall A      WC Repair      G0 Installation                
10/15/03 Wednesday Down  Configure Hall A      WC Repair      G0 Installation                
10/16/03 Thursday Down  Configure Hall A      WC Repair      G0 Installation                
10/17/03 Friday Down  Configure Hall A      WC Repair      G0 Installation                
10/18/03 Saturday Down  Configure Hall A      WC Repair      G0 Installation                
10/19/03 Sunday Down  Configure Hall A      WC Repair      G0 Installation                
10/20/03 Monday Down  Configure Hall A      WC Repair      G0 Installation                
10/21/03 Tuesday Down  Configure Hall A      WC Repair      G0 Installation                
10/22/03 Wednesday Down  Configure Hall A      WC Repair      G0 Installation                
10/23/03 Thursday Down  Configure Hall A      WC Repair      G0 Installation                
10/24/03 Friday Down  Configure Hall A      WC Repair      G0 Installation                
10/25/03 Saturday Down  Configure Hall A      WC Repair      G0 Installation                
10/26/03 Sunday Down  Configure Hall A      WC Repair      G0 Installation                
10/27/03 Monday Down  Configure Hall A      WC Repair      G0 Installation                
10/28/03 Tuesday Down  Configure Hall A      WC Repair      G0 Installation                
10/29/03 Wednesday Down  Configure Hall A      WC Repair      G0 Installation                
10/30/03 Thursday Down  Configure Hall A      WC Repair      G0 Installation                
10/31/03 Friday Down  Configure Hall A      WC Repair      G0 Installation                
11/01/03 Saturday Down  Configure Hall A      WC Repair      G0 Installation               1 2 3 4 5  
11/02/03 Sunday Down  Configure Hall A      WC Repair      G0 Installation                
11/03/03 Monday Down  Configure Hall A      WC Repair      G0 Installation                
11/04/03 Tuesday Down  Configure Hall A      WC Repair      G0 Installation                
11/05/03 Wednesday Down  Configure Hall A      WC Repair      G0 Installation                
11/06/03 Thursday Down  Configure Hall A      WC Repair      G0 Installation                
11/07/03 Friday Down  Configure Hall A      WC Repair      G0 Installation                
11/08/03 Saturday Down  Configure Hall A      WC Repair      G0 Installation                
11/09/03 Sunday Down  Configure Hall A      WC Repair      G0 Installation                
11/10/03 Monday Restore  Configure Hall A      WC Repair      G0 Installation                
11/11/03 Tuesday Restore  Configure Hall A      WC Repair      G0 Installation                
11/12/03 Wednesday Restore  Configure Hall A      WC Repair      G0 Installation                
11/13/03 Thursday Restore  Configure Hall A      WC Repair      G0 Installation                
11/14/03 Friday Restore  Configure Hall A      WC Repair      G0 Installation                
11/15/03 Saturday Restore  Configure Hall A      WC Repair      G0 Installation                
11/16/03 Sunday Restore  Configure Hall A      WC Repair      G0 Installation                
11/17/03 Monday Restore  Configure Hall A      WC Repair      G0 Installation                
11/18/03 Tuesday Restore  Configure Hall A      WC Repair      G0 Installation                
11/19/03 Wednesday Restore  Configure Hall A      WC Repair      G0 Installation                
11/20/03 Thursday Restore  Configure Hall A      WC Repair      G0 Installation                
11/21/03 Friday Beam Studies  Configure Hall A      WC Repair      G0 Beam Studies   3.026/40/p            6  
11/22/03 Saturday Beam Studies  Configure Hall A      WC Repair      G0 Beam Studies   3.026/40/p             
11/23/03 Sunday Beam Studies  Configure Hall A      WC Repair      G0 Beam Studies   3.026/40/p             
11/24/03 Monday Beam Studies  Configure Hall A      WC Repair      G0 Beam Studies   3.026/40/p            7  
11/25/03 Tuesday Beam Studies  Configure Hall A      WC Repair      G0 Beam Studies   3.026/40/p             
11/26/03 Wednesday Beam Studies  Configure Hall A      WC Repair      G0 Beam Studies   3.026/40/p             
11/27/03 Thursday Beam Studies  Configure Hall A      WC Repair      G0 Beam Studies   3.026/40/p             
11/28/03 Friday Beam Studies  Configure Hall A      WC Repair      G0 Beam Studies   3.026/40/p             
11/29/03 Saturday Beam Studies  Configure Hall A      WC Repair      G0 Beam Studies   3.026/40/p             
11/30/03 Sunday Beam Studies  Configure Hall A      WC Repair      G0 Beam Studies   3.026/40/p             
12/01/03 Monday Beam Studies  Configure Hall A      WC Repair      G0 Beam Studies   3.026/40/p             
12/02/03 Tuesday 0.99  Configure Hall A      DVCS Tests   5.006/50   G0 Eng. Run   3.026/40/p    C          
12/03/03 Wednesday 0.99  Configure Hall A      DVCS Tests   5.006/50   G0 Eng. Run   3.026/40/p    C          
12/04/03 Thursday 0.99  Configure Hall A      DVCS Tests   5.006/50   G0 Eng. Run   3.026/40/p    C          
12/05/03 Friday 0.99  Configure Hall A      DVCS Tests   5.006/50   G0 Eng. Run   3.026/40/p    C          
12/06/03 Saturday 0.99  Configure Hall A      DVCS Tests   5.006/50   G0 Eng. Run   3.026/40/p    C          
12/07/03 Sunday 0.99  Configure Hall A      DVCS Tests   5.006/50   G0 Eng. Run   3.026/40/p    C          
12/08/03 Monday 0.99  Configure Hall A      DVCS Tests   5.006/50   G0 Eng. Run   3.026/40/p    C          
12/09/03 Tuesday 0.99  Configure Hall A      DVCS Tests   5.006/50   G0 Eng. Run   3.026/40/p    C          
12/10/03 Wednesday 0.99  Configure Hall A      DVCS Tests   5.006/50   G0 Eng. Run   3.026/40/p    C          
12/11/03 Thursday 0.99  Configure Hall A      DVCS Tests   5.006/50   G0 Eng. Run   3.026/40/p    C          
12/12/03 Friday 0.99  Configure Hall A      eg2 Setup   4.016/50   G0 Eng. Run   3.026/40/p    B          
12/13/03 Saturday 0.99  Configure Hall A      eg2 Setup   4.016/50   G0 Eng. Run   3.026/40/p    B          
12/14/03 Sunday 0.99  Configure Hall A      eg2 Setup   4.016/50   G0 Eng. Run   3.026/40/p    B          
12/15/03 Monday 0.99  Septa Comm   2.036/100   eg2 Setup   4.016/50   G0 Eng. Run   3.026/40/p    B          
12/16/03 Tuesday 0.99  Septa Comm   2.036/100   eg2 Setup   4.016/50   G0 Eng. Run   3.026/40/p    B/C/A          
12/17/03 Wednesday 0.99  Septa Comm   2.036/100   eg2   4.016/50   G0 Eng. Run   3.026/40/p    B/C/A          
12/18/03 Thursday 0.99  Septa Comm   2.036/100   eg2   4.016/50   G0 Eng. Run   3.026/40/p    C/B/A          
12/19/03 Friday 0.99  Septa Comm   2.036/100   eg2   4.016/50   G0 Eng. Run   3.026/40/p    C/B/A          
12/20/03 Saturday 0.99  Septa Comm   2.036/100   eg2   4.016/50   G0 Eng. Run   3.026/40/p    C/B/A          
12/21/03 Sunday 0.99  Septa Comm   2.036/100   eg2   4.016/50   G0 Eng. Run   3.026/40/p    C/B/A          
12/22/03 Monday 0.99  Septa Comm   2.036/100   eg2   4.016/50   G0 Eng. Run   3.026/40/p    C/B/A          
12/23/03 Tuesday 0.99  Septa Comm   2.036/100   eg2   4.016/50   G0 Eng. Run   3.026/40/p    C/B/A          
12/24/03 Wednesday Maintenance  –      –      –                
12/25/03 Thursday Christmas                              
12/26/03 Friday Holiday                              
12/27/03 Saturday Holiday                              
12/28/03 Sunday Holiday                              
12/29/03 Monday Holiday                              
12/30/03 Tuesday Holiday                              
12/31/03 Wednesday Holiday