Gradient maintenance. What needs to be done? What can be done at 2K? What can be done at 4K? Estimated time needed. Must, Shoulds and Likes
Presented by ALL
Session: Planning
Gradient maintenance. What needs to be done? What can be done at 2K? What can be done at 4K? Estimated time needed. Must, Shoulds and Likes
Presented by ALL on 3 Apr 2014 at 15:10
Session: Assemble/Intro
on 3 Apr 2014 at 08:30
Gradient, Qs and trip rates.
Presented by Jay BENESCH on 3 Apr 2014 at 09:25
results and implications of c100 activation measurements
Presented by George KHARASHVILI on 3 Apr 2014 at 11:35
C100/R100 performance with beam. Challenges during initial beam operations.
Presented by Ramakrishna BACHIMANCHI on 3 Apr 2014 at 10:45
C50-11 Qs, gradients, onset field emission data. Any remaining regions of interests in improving C50 Qs. Is this a dead horse?
Presented by Mike DRURY on 3 Apr 2014 at 10:20
Data of magnetic/magnetized components surveyed. Correlation of C50-11 Q0 of individual cavities with the ambient magnetic field at SL10 slot.
Presented by Rongli GENG on 3 Apr 2014 at 10:30
Session: Planning
CHL plans during the summer shutdowns, with emphasis on the impact to the Linac. Topics include: CHL-1 Maintenance summer of 2014, proposed 1.5kW external heater, modifications to support Linacs at 2K on one CHL, and anything else.
Presented by Mat WRIGHT on 3 Apr 2014 at 14:25
Status of the CHL-1/CHL-2 systems and performance during initial beam operations. Linac loads, pressure stablility and hat management to be presented with a bias towards cryogenic system needs.
Presented by Jonathan CREEL on 3 Apr 2014 at 11:05
Presented by ALL on 3 Apr 2014 at 11:50
Presented by ALL
Presented by ALL
Session: Assemble/Intro
Presented by Arne FREYBERGER on 3 Apr 2014 at 08:45
Session: Planning
CEBAF schedule for beam operations and shutdowns for the next three years.
Presented by Arne FREYBERGER on 3 Apr 2014 at 13:00
Data from recent heat load minimization tests
Presented by Geoff KRAFFT on 3 Apr 2014 at 11:20
Session: Planning
Algorithm for minimization of trip rate and heat load.
Presented by Balsa TERZIC on 3 Apr 2014 at 14:10
Session: Planning
RF power maintenance planned for the Summer of 2014. R100 Kylstrons installation. Estimated consumables (klystrons, controls) for the next several years of operation.
Presented by Steve COOPER on 3 Apr 2014 at 14:55
Session: Planning
With little gradient headroom, constant vigilance is required to achieve peak performance from the RF/SRF/Cryo systems. How shall we proceed? A strawman proposal will be presented and morphed into a robust plan with institutional buy-in from all parties. Peace in the middle east and an end to world hunger will be achieved, as well , during this discussion.
Presented by Arne FREYBERGER on 3 Apr 2014 at 15:40
What data was taken? how is it stored? Data access? Preliminary results.
Presented by Mike DRURY on 3 Apr 2014 at 09:00
Session: Planning
Plan and schedule of SRF maintenance work for Summer 2014 (and beyond). Tuner stand-off modifications? tunnel cabling clean-up?
Presented by Mike DRURY on 3 Apr 2014 at 14:40
Session: Planning
C50-12 plan, schedule and status. Likely date of return to CEBAF?
Presented by Joe PREBLE on 3 Apr 2014 at 13:35
Session: Planning
Status and plans of Plasma processing. Recent test results on FEL02?
Presented by John MAMMOSSER on 3 Apr 2014 at 13:15
Session: Planning
What is needed to complete the hand-off for robust operations of the C100s by operators and crew chiefs. What is the plan? What is the schedule?
Presented by Clyde MOUNTS on 3 Apr 2014 at 13:50