Year | Dates | Calendar days | Energy, GeV | ABU1+ BANU2 | ABU | Experiment | Comment | PAC days3 |
---|---|---|---|---|---|---|---|---|
2016 | Feb, 3 - Mar, 23 | 49 | 12.0 | ? | ? | E12-06-102 | Engineering run, solenoid at 1200A | 3+25 |
2017 | Jan, 30 - Mar, 9 | 40 | 11.7 | 58% | 51% | E12-06-102 | Production | 20 |
2018 | Jan, 12 - Mar, 5 | 52 | 11.7 | 52% | 46% | E12-06-102 | Production | 26 |
2018 | Mar, 29 - May, 6 | 38 | 11.7 | 58% | 52% | E12-06-102 | Production | 19 |
2018 | Sep, 21 - Nov, 26 | 66 | 11.7 | 53% | 47% | E12-06-102 | Production | 33 |
2018 | Nov, 28 - Dec, 9 | 12 | 10.3 | ? | N/A | E12-10-011 | Commissioning, low energy | N/A |
2018 | Dec, 12 - Dec, 18 | 7 | 9.0 | ? | N/A | E12-10-011 | Commissioning, low energy | N/A |
2019 | Feb, 8 - Feb, 21 | 13 | 11.6 | 45% | N/A | E12-12-002 | 1/2 DIRC Commissioning | 6 |
2019 | Feb, 21 - Mar, 5 | 15 | 11.6 | 52% | 37% | E12-10-011 | Installation, Production on Be, LHe | 7.5 |
2019 | Mar, 8 - Apr, 15 | 38 | 11.2 | 73% | 68% | E12-10-011 | Production on LHe, FOM=0.854 | 16.5 |
2019 | Nov, 25 - Dec, 20 | 25 | 11.4 | 34% | 32% | E12-12-002 | DIRC commissioning, actual start Dec, 3. PAC days = 0.32*25 | 8 |
2020 | Jan, 10 - Mar, 24 | 75 | 11.4 | 62% | 56% | E12-12-002 | Production with DIRC at high rate. First 2 weeks - lower rate | 38 |
2020 | Jul, 27 - Sep, 21 | 56 | 11.4 | 46% | 38% | E12-12-002 | Production with DIRC at high rate | 21.5 |
1. ABU - Available Beam in Use (fraction of the calendar time)
2. BANU - Beam Available Not in Use (fraction of the calendar time)
3. PAC days - Assumed to be 50% of the calendar days
4. The figure-of-merit FOM for PRIMEX-η is estimated as FOM∝EBEAM2