Written Document

The following table lists sections of the document being prepared for the review committee.
Section Postscript HTML CVS Repository Responsible Parties
Overview
  • Physics Goals
  • General Setup
  • Error Budget
- - - Ashot
HYCAL
  • Design, status - Detector
  • Design, status - Engineering
  • Support structure/transporter
  • Resolutions
  • Light Monitoring System
  • Veto Scintillators
- - -
Ashot
Mahbub
Mahbub
Ashot/Raphael
Sam/Yar
Eric
Luminosity/Normalization
  • Tagger
  • Target Thickness
  • Flux monitoring
    • TAC
    • Pair Spectrometer
    • Field Mapping
  • Lum. Monitoring w/ Compton
- - - Eugene
Rory

Dan, Dave, -
- Itaru, Aram
Abdellah
Dan
Rates/Backgrounds - - - Dave, Ashot
DAQ and Electronics
  • DAQ Electronics
  • Trigger Selection
  • Event Definition
  • Slow Controls
daq.ps HTML docs/readiness_review/DAQ Dave
""
""
Abdellah/Mark
Beamline
  • Beam Parameter Specs.
  • HARPs/BCMs
  • Online Beam Position Monitors
- - - Dustin
""
Liping/Phil
Energy Calibration - - - Dan/Liping
Schedule of Work from Readiness review to Run - - - Mark
Summary - - - Ashot