Weekly Meeting Minutes - February 13, 2004
Attending: Ashot, DanD, Doug, Mark, Raphael, Dustin, DaveL, Phil, Eric, Jouri, Vladimir, Rafael, Yar, Aram
Phone: Liping, Rory
Status:
Doug: Pressure tests of cooling system in progress.
HyCal ready to be worked on; decision to run chiller at 20 Celtigrade while electronics are being installed.
DaveL: DAQ update, discussion of progress.
Discussion of drain system inside HyCal; talk to Kashy.
Discussion of humidity detectors; see Christer.
Spare Parts:
DaveL: Electronics list & discussion.
Discussion of TAC use; relegated to Itaru.
LMS: Getting HV from pair spectrometer; need to test & order.
Run Conditions:
Mark: Schedule for accelerator.
Itaru: Presentation of DAQ analysis; discussion of trigger.
Aram: Presentation of flux control.
Open Questions & Discussion:
Upstream beamline.
Number of targets.
Compton effect.
Energy calibration.