PrimEx Survey Data Transmittals

Data TransmittalDescription
B936Jan 28, 2004 inspection performed on the HyCal detector located in the Test lab
B940Hall B HyCal detector calibration performed on Aug. 27, 2004
B944Primex Target Calibration carried out September 1, 2004
B945TAC calibration survey performed on Sep 2, 2004
B946Hall B beam line survey performed during the week of Sep 1, 2004
B958HyCal detector alignment performed on Oct. 8, 2004

Mark M. Ito
$Id: index.html,v 1.3 2005/06/08 13:02:11 marki Exp $