CLAS12 Central Time of Flight (CTOF) Detector
CTOF Documentation:
- CTOF Operations:
- CTOF Notes and Reports:
- Software:
- CTOF Calibration Documentation:
- CTOF Calibration Suite:
- Performance Reports:
- CTOF Rate Studies:
- Light Monitoring System:
- Magnetic Shields:
- Detector Assembly:
- Cabling:
- Engineering FEA Calculations:
- Survey and Alignment:
- Design Details:
- CTOF Installation
- Compensation Coils:
- Presentations:
CTOF Photographs:
- CTOF Assembly Area:
- (2/15), (3/15),
(4/15), (5/15),
(6/15), (7/15),
(9/15), (4/16),
(12/16), (1/17),
(2/17)
- Counter #48 Work: (2015), (2018)
- Counter Wrapping
- Counter Gluing Repair
- Installation:
- Magnetic Shields:
- Central Detctor Status: (11/17), (8/18)
- Light Monitoring System:
- PMT/Divider Assemblies
- Miscellaneous
- CTOF Modern Art
Last modified: August 19, 2024
Daniel S. Carman