A pyroelectric detector was also successfully checked off-line this week, and it will be installed
Monday at a synchrotron light port to monitor coherent synchrotron radiation at that port, thereby
enabling a cross-check of the Happek device.
The Optical Control Room is now very nearly ready for first light. Still missing are an x-term and
a workstation, and we are working to get them installed soon.