Purpose
Jefferson Lab maintains a compliant environmental monitoring and reporting
program in accordance with requirements of Department
of Energy (DOE) Order 458.1, Radiation Protection of the Public and the
Environment, and permits with regulatory agencies.
2.0
Scope
Environmental
monitoring focuses on the examination of the laboratory’s water and soil to
ensure emissions and discharges are compliant with all regulatory limits.
A major element of this program is the routine submission of monitoring data required by permits. In addition, to keep stakeholders informed about its environmental monitoring performance, monitoring information is summarized in a comprehensive annual report titled, “The Thomas Jefferson National Accelerator Facility Site Environmental Report”.
3.0
Responsibilities
NOTE: Management
authority may be delegated to a task qualified Jefferson Lab employee at the
discretion of the responsible manager.
Jefferson Lab uses both
internal and subcontracted staff and analytical laboratories to perform sampling and analysis.
3.1
Facilities
Management & Logistics
·
Maintains groundwater monitoring wells.
· Manages Hampton Roads Sanitation District (HRSD) related water pumps and meters and conducts meter readings/flow calculations.
· Notifies ESH&Q if any work may involve the disturbance of asbestos containing materials.
3.2 ESH&Q Division
·
Manages analytical subcontract associated with these requirements,
including assurance that laboratories have required certifications and
procedures.
·
Ensures the collection
and analysis of samples in accordance with this plan. Prepares/receives data, to
include providing for quality control/quality assurance data review.
·
Ensures the
consolidation and on-time delivery of data and information that meet all
quality objectives to DOE and/or regulatory agencies.
·
Reviews modified/new
site activities to determine the need for modifications to the monitoring
program or permit conditions.
4.0
Expectations
Sampling and analysis for environmental monitoring and surveillance for permit compliance is performed in accordance with Virginia Department of Environmental Quality (DEQ) and HRSD regulations, as well as DOE contractual commitments. As subcontracted laboratories are often used to perform analyses of samples, specific qualifications are established and verified throughout a contract’s procurement and execution.
4.1
Air Monitoring
No current laboratory activities or processes require air monitoring. Disturbance of asbestos containing materials may require notification to the State of Virginia. Jefferson Lab complies with the requirements of Title 40 CFR Part 61, Subpart H, “National Emission Standards for Emissions of Radionuclides Other Than Radon from DOE Facilities” through use of approved atmospheric dispersion models. No radionuclide emission monitoring is required during current operations, as calculated doses from emissions are below regulatory thresholds.
4.2
Water Monitoring – Groundwater
The
accelerator beam causes radiation that could activate nearby soil and
groundwater. Semiannual and annual sampling and analysis of groundwater is now
performed under DEQ Permit No. VA0089320. Groundwater extracted and discharged
to the surface is monitored and reported quarterly in accordance with DEQ
Permit No. VA0047200. A flowchart is maintained by ESH&Q for timely,
complete reporting in accordance with these permits.
4.3
Water Monitoring – Surface Water
Groundwater is collected at the end stations, pumped to the surface, and sampled annually for pH and indicator radionuclides under Permit No. VA0089320 (Outfall 001). The cooling tower discharge from the Central Helium Liquefier (CHL) cooling tower is sampled quarterly under VA0089320 (Outfall 002). This discharge is sampled for temperature, ammonia-N, total residual chlorine, hardness, pH, total dissolved copper, total dissolved zinc, and total phosphorus. A flowchart is maintained by ESH&Q for timely, complete reporting in accordance with this permit.
4.4
Water Monitoring – Sanitary Sewer
Routine compliance reporting to HRSD is coordinated by ESH&Q and transmitted via TJSO. Two types of data are required on a monthly basis:
1. pH readings from Manholes D and EF, taken by subcontractors in the first two weeks of each month.
2. Flow data from water meters throughout the site, to measure water volumes discharged to HRSD.
The HRSD, under Permit No. 0117, allows discharge of 5 Curies (Ci) of tritium and 1 Ci of all other radionuclides annually to the sanitary sewer, as authorized under Commonwealth of Virginia Department of Health Radiation Protection Regulations, 12VAC5‑481. All radioactive effluents to the sanitary sewer are monitored for activity. That monitoring is used to document the quantity of radioactivity released and is documented and available on request to HRSD and DOE.
A flowchart is maintained by ESH&Q for timely, complete reporting in accordance with this permit. FM&L has developed instructions for completion of the annual 7 day HRSD meter reading event.
4.5
Surface Water, Soil and Sediment
Monitoring
Surface water, soil and sediment in the vicinity of an accelerator enclosure can become activated or may serve as a sink for radionuclides released to the environment during facility operations. Long-term trends may be assessed by analyzing soil samples collected on the site grounds for radionuclides. Samples are collected periodically from selected sites at Jefferson Lab. The soil samples are analyzed via gamma spectroscopy. The need for samples, sampling location, frequency, and type is determined by periodically reviewing Jefferson Lab operations and the potential for radionuclide production. The procedure for sampling and analysis associated with this monitoring is contained in the RADCON Manual.
5.0
References
State and Sanitation
District Permits:
·
DEQ VA0089320 (groundwater and surface water)
·
DEQ VAR040079 (municipal separate storm sewer systems)
·
DEQ VA0047200 (groundwater extraction)
·
HRSD 0117 (discharges to sanitary sewer system)
Laboratory Programs and Plans:
· TJNAF Integrated Safety Management System (ISMS) Program Description
· TJNAF Environmental Management System (EMS) Plan
ES&H Manual Chapters:
· ES&H Manual Chapter 8020 Water Quality Program
· ES&H Manual Chapter 8030 Air Quality Program
DOE and Executive Orders:
·
DOE
O 450.1A, Environmental Protection
Program
· DOE O 458.1 Radiation Protection of the Public and the Environment
Health Physics Procedures:
6.0
Revision Summary
Revision 0.0 – 10/27/17
– Initial Content
|
ISSUING
AUTHORITY |
TECHNICAL
POINT-OF-CONTACT |
APPROVAL
DATE |
REVIEW DATE |
REV. |
Page 4 of 4 |
|
|
ESH&Q Division |
10/27/17 |
10/27/20 |
0.0 |
|
This
document is controlled as an on line file.
It may be printed but the print copy is not a controlled document. It is the user’s responsibility to ensure
that the document is the same revision as the current on line file. This copy was printed on 11/1/2017.