Appendix T2: Procurement
Requirements Related to Overhead
& Mobile Cranes, Hoists, and Rigging |
||
|
|||
All procurements or leases and related repair and maintenance services for overhead and mobile cranes, hoists, and rigging, contracted equipment, subcontracted services, follow the minimum procedure provided in Chapter 6140, Appendix T2: Procurement of Material Handling Equipment.
Additional requirements for the procurement lease or maintenance
of overhead and mobile cranes, hoists, and rigging are outlined in this
document.
This
document is performed in coordination with chapters 6140, Material Handling
Equipment Program and 6141,
Material Handling Equipment: Rigging, Cranes, and Hoists.
Note: Management authority may be delegated to a
task-qualified TJNAF employee at the discretion of the responsible manager.
·
Implement the requirements of ES&H Manual Chapter 6140
Appendix T2 Procurement of Material Handling Equipment.
· Create a Purchase Request for the purchase of material handling slings, hardware and rental of cranes and man lifts. In the POA section of the requisition use Proj and Org codes appropriate for the work followed by one of these Account codes:
o 043-028 for the purchase new equipment such as; chain hoists,
lever hoists, slings, rigging hardware and BTHLD’s
o 049-024 for the repair of material handling equipment
o 052-002 for the rental of mobile cranes, material handling equipment and man lifts
3.2
Material
Handling Manager (MHM)
·
Reviews Purchase
Requisitions for compliance with JLab, OSHA and ANSI requirements.
·
Receives and approves
Material Handling Lift Plans submitted by subcontractors.
· Coordinates inspection of Lift Plan execution on the day of a mobile crane lift or subcontractor lift using a JLab crane.
4.1
Rigging Equipment Requisitions and Purchase
Orders
All rigging equipment shall comply with
the following statements:
· Rigging equipment must meet the safety requirements of OSHA and
ANSI.
· Wire rope slings must be accompanied by proof of load test
certification.
4.2
Rental or Subcontractor provided Cranes/Hoists and Rigging
Requisitions and
Purchase Orders should state the following:
·
JSA/Jefferson Lab requires
assurance that the equipment meets the requirements of OSHA, and ANSI, safety
standards prior to operation on site.
·
A Jefferson Lab (JLab) Material Handling Lift Plan must be
submitted to the JLab Material Handling Manager (MHM) for approval several days
prior to the scheduled lift date. In the lift plan the subcontractor is to
identify rigging equipment and the rigging configuration needed to accomplish
the required lift. Rigging equipment and hardware must meet the requirements of
OSHA and ANSI standards. On the day of the lift the MHM will inspect rigging,
crane inspection certificate, crane operators training credentials, rigger
qualifications and signal person qualifications for conformance with OSHA and
ANSI criteria prior to the commencement of the lift.
4.3
Construction Subcontractors operating
Jefferson Lab Cranes
Requisitions and
Purchase Orders must specify the following:
·
Subcontractor may be approved
to operate Jefferson Lab cranes to accomplish work required. The
subcontractors’ crane operator(s) must possess proof of training meets the
operator qualifications of OSHA and ANSI.
·
A Jefferson Lab (JLab)
Material Handling Lift Plan must be submitted to the JLab Material Handling
Manager (MHM) for approval several days prior to the scheduled lift date. In
the lift plan the subcontractor is to identify rigging equipment and the
rigging configuration needed to accomplish the required lift. Rigging equipment
and hardware must meet the requirements of OSHA and ANSI standards. On the day
of the lift the MHM will inspect rigging, crane operators training credentials,
rigger qualifications and signal person qualifications for conformance with
OSHA and ANSI criteria prior to the commencement of the lift.” “Subcontractor
crane operator(s) and rigger(s) must attend a work area specific safety
orientation prior to being authorized to operate any Jefferson Lab cranes. The
crane operator’s skill will be observed by the MHM to conclude the approval to
operate.
·
Subcontractor will provide
proof of liability insurance.
· Subcontractor will provide their own rigging equipment.
5.0
Revision History
summary |
date |
|
2.4 |
- minor edits in sections 4.1 and 4.2 -
updated text in and revised format of headers and footers -
general editorial updates -
format of this section, changing the title to Revision History and changing to
tabular format -
no approval necessary |
03.25.2022 |
2.3 |
periodic
review; updated header
and footer, no approval needed |
03.25.2021 |
2.2 |
updated TPOC from BSperlazza to MLoewus |
01.24.2018 |
2.1 |
updated
TPOC from DKausch to
BSperlazza per BSperlazza |
02.09.2017 |
2.0 |
rephrased
and added sentences in all sections to accurately portray the procurement
processes used |
12.17.2015 |
1.0 |
periodic
review: no changes per
TPOC |
12.04.2014 |
updated
to reflect current laboratory operations |
04.12.2010 |
|
ISSUING
AUTHORITY |
TECHNICAL
POINT-OF-CONTACT |
APPROVAL
DATE |
REVIEW DATE |
REVIEW
CYCLE |
rev |
|
|
ES&H Division |
01.24.2018 |
03.25.2022 |
3 years |
2.4 |
|