Hall C Data Transmittals
----------------------

DT # Description Date Recipient
C2097 NPS Pointing angles 03/27/24 04/02/2024 P. Medeiros, C. Munoz Camacho, S. Lassiter
C2084 HC Diagnostic girder survey 09/05/2023 Dave Gaskell
C2085 HC Target 09/05/2023 D. Meekins
C2086 Hall C Moller target and solenoid as-found August 2023 09/07/2023 D. Meekins, D. Gaskell
C2082 NPS Pointing angles 06/08/23 08/22/2023 C. Munoz Camacho, S. Malace, P. Medeiros
C2080 Hall C Moller target and solenoid as-found SAD summer 2023 08/02/2023 D. Meekins, D. Gaskell
C2067 As-found location of Hall C Solid target 04/06/2023 M. Mnycz
C2069 Hall_C NPS detector grid 05/16/2023 S. Malace, C. Munoz
C557 Superharp survey and replacement of SH05/SH06 w/ SH09/SH10 10/19/99 Chen Yan
C558 Superharp survey and replacement of SH01/SH02 w/ SH11/SH12 10/28/99 Chen Yan
C560 Hall C Target Location survey nov 8th.. Optics / Solid Targets 11/16/99 Ent Seely
C566 SuperHarp survey at 3C12 >> SH11/SH12 replaced w SH14/SH13 12/02/99 YAN GUEYE
C570 Post Run Target Survey Hall C (survey dec12,1999) 1/19/00 Ent Seely
C575 G zero octant plate survey 2/18/00 Lassiter
C582 Superharp survey from Jan2000 3/17/00 Chen Guye Mack
C592 G zero light guide assembly(#4) qc survey 4/11/00 Lassiter
C594 QC light guide survey relaxed 4/17/00 Lassiter
C595 Ferris Wheel Axyz Survey Results 4/21/00 Lassiter
C605 HNSS detector 5/23/00 Liguang Tang
C610 Gzero Detector1 Light Guide Sag Survey 6/14/00 Steve Lassiter
C612 Hall C Loop 3 Target Data 7/7/00 Jim Dunn
C616 Hall C Target Cell Alignment 7/11/00 Mike Seely
C617 superharps 7/11/00 Jim Dunne
C618 Hall C Target Cell Alignment Origin Position 7/12/2000 Mike Seely
C633 Crane Survey 10/3/00 Dave Kausch, Bill Rust
C635 Hall C Cryogenic Target Location 10/11/00 Mike Seely, Dave Meekins
C637 Hall C Downstream beampipe 10/18/00 Thia Keppel
C638 G0 Rail Floor Topo 10/19/00 Steve Lassiter
C660 Hall C target 3/9/01 Dave Meekins, Mike Seely
C662 Hall C target 3/13/01 Dave Meekins, Mike Seely
C664 Hall C control 3/29/2001 W. Kellner, S. Lassiter
C670 Hall C target post run survey (GEN00) 5/3/01 Dave Meekins, Mike Seely
C676 Gen00 Bunker As Found 6/26/2001 R. Madey, B. Anderson
C677 HMS Pointing at 18 deg. 6/28/2001 Marko Zeier, Rolf Ent, Mike Fowler
C681 Charybdis magnet 7/11/01 Glen MacLachlan
C683 GEN01 super harp data 7/16/01 Chen Yan, Paul Gueye, Yan Wang, Sam Donagoulian
C684 Line C GEN01/Moeller components 7/16/01 Jay Benesch, Mike Spata, Howard Fenker
C685 Line C GEN01 diagnostic components 7/17/2001 Jay Benesch, Mike Spata, Howard Fenker
C686 Line C GEN01 chicane move (2.332GeV) 7/27/2001 Jay Benesch, Donal Day, Rolf Ent
C694 Gzero Target alignment and encoder values 8/24/01 K. Gustafsson, S. Coving, G. Smith
C696 GEN01 target fixture calibration 8/30/01 Marko Zeier, Markus Hauger
C2049 Hall C Target September 2022 check 09/15/2022 D. Meekins, D. Gaskell
C2046 Hall C Detector test stand for 2022 run 08/05/2022 M. Mnycz, J. Zhang
C2034 Hall C Target June 2022 run 05/31/2022 D. Meekins, D. Gaskell
C2034 Hall C Target June 2022 run 05/31/2022 D. Meekins, D. Gaskell
C2005 Hall C 3H line components coordinates report 09/10/2021 D. Gaskell,J. Benesch, Y. Roblin
C2004 Hall C 3C, Compton, and 3M components coordinates report 09/10/2021 D. Gaskell,J. Benesch, Y. Roblin
C1996 Hall C Downsteam Beampipe Asfound Locations 06/28/2021 W. Kellner, S. Lassiter
C1992 Hall C Crystal/Glass Quality Inspection 12/11/2020 Tanja Horn, Vladimir Berdnikov
C1985 A1N compass measurements 10/13/2020 B. Sawatzky, JP. Chen, M. Roy, A. Tadepalli
C1984 D2N Post run compass and target cell 10/13/2020 B. Sawatzky, JP. Chen, M. Roy, A. Tadepalli
C1982 SHMS Pointing from 11/27/2019 ~15.5 degrees 09/18/2020 B. Sawatzky,D.Gaskel, M.Jones
C1981 SHMS Pointing from 11/26/2019 ~33.0 degrees 09/18/2020 B. Sawatzky,D.Gaskel, M.Jones
C1980 HMS Pointing - ~12.5 deg - 11/27/2019 not processed earlier1980 09/18/2020 B. Sawatzky, D. Gaskel, M. Jones, S. Lassiter, M. Fowler
C1975 Hall C Super Harp Girder IHA3H07B 07/20/2020 D. Gaskell, J. Benesch
C1956 moller, collimator As Found November 2019 12/04/2019 D. Gaskell
C1956 moller, collimator As Found November 2019 12/04/2019 D. Gaskell
C1956 moller, collimator As Found November 2019 12/04/2019 D. Gaskell
C1953 HMS Pointing - 30 deg - 11/2019 11/27/2019 B. Sawatzky, D. Gaskel, M. Jones, S. Lassiter, M. Fowler
C1938 moller, collimator, QE mags as-found summer 2019 08/29/2019 D. Gaskell
C1917 Inspection of new pivot flange 04/19/2019 B. Metzger
C1904 Hall C Super Harp Girder, IHA3H07A,B_IPM3H07A,B,C 02/07/2019 D. Gaskell, J. Benesch
C1869 Hall C Target Post Run Survey 06/20/2018 D. Meekins
C1876 SHMS Pointing (2) 23 & 13 degrees - HMS at 65 degrees 08/14/2018 B. Sawatzky, D. Gaskel, M. Jones, S. Lassiter, M. Fowler
C1878 Hall C Target Fall Run Survey 08/15/2018 D. Meekins
C1881 IHA3H07A/7B plus radiator locations and encoder values(7A only) in decimal(after wire re-work) 08/17/2018 D. Gaskell, J. Benesch, M. Keesee, C. Seaton, K. Cole
C1889 IPM3H08 & 09 Locations 09/27/2018 J. Musson, J. Benesch
C1847 IHA3H07A & B locations and encoder values in decimal(after wire re-work)1847 01/10/2018 D. Gaskell, J. Benesch, M. Keesee, C. Seaton, K. Cole
C1842 HMS Pointing at 35,15(twice),40(twice), 26 degrees 01/02/2018 B. Sawatzky, D. Gaskel, M. Jones, S. Lassiter, M. Fowler
C1834 IHA3H07A & B locations and encoder values in decimal 12/01/2017 D. Gaskell, J. Benesch, M. Keesee, C. Seaton, K. Cole
C1832 HMS Wire Chamber 1 & 2 11/30/2017 B. Sawatzky, D. Gaskell
C1820 SHMS Dipole Mapper with new probe and a 90 degree offset1820 10/18/2017 S. Lassiter, P. Medeiros, E. Sun
C1819 Hall C Target Fall 2017 Survey 10/12/2017 D. Meekins, S. Lassiter
C1814 SHMS Dipole Mapper 09/11/2017 S. Lassiter, P. Medeiros, E. Sun
C1812 SHMS Pointing - approximately at 15 degrees 08/24/2017 B. Sawatzky, D. Gaskel, M. Jones, S. Lassiter, M. Fowler
C1810 SHMS Pointing at approx 40 degrees 08/08/2017 B. Sawatzky, D. Gaskel, M. Jones, S. Lassiter, M. Fowler
C1809 HMS Pointing at approx 50 degrees 08/04/2017 B. Sawatzky, D. Gaskel, M. Jones, S. Lassiter, M. Fowler
C1808 SHMS Pointing - approximately at 25 degrees 08/04/2017 B. Sawatzky, D. Gaskel, M. Jones, S. Lassiter, M. Fowler
C1807 HMS Pointing 08/04/2017 B. Sawatzky, D. Gaskel, M. Jones, S. Lassiter, M. Fowler
C1806 SHMS Pointing - approximately at 15 degrees 08/03/2017 B. Sawatzky, D. Gaskel, M. Jones, S. Lassiter, M. Fowler
C1796 SHMS Pointing - using both sides. approx 20 degrees br 06/14/2017 D. Gaskel, B. Sawatzky, M. Jones
C1793 SHMS Pointing - using yokes and coils - close to beam line position 06/07/2017 D. Gaskel, B. Sawatzky, M. Jones
C1792 HMS Pointing - using both sides and checks using singular data 06/07/2017 D. Gaskel, B. Sawatzky, M. Jones
C1790 SHMS 1st Pointing results 05/22/2017 D. Gaskel, B. Sawatzky, M. Jones
C1780 HC super harp girder 03/07/2017 D. Gaskell
C1778 Hall C Target Survey 020617 03/06/2017 D. Meekins, D. Gaskill
C1777 Hall C Mega BPM locations 03/06/2017 J. Benesch, D. Gaskell, J. Musson, D. Moser, M. McCaughan
C1776 SHMS Magnet Locations prior to KPP run. 03/01/2017 P. Brindza, S. Lassiter, M. Fowler
C1773 SHMS Dipole Yoke and Coil Aperture Offsets from 2B Alignment 021617 02/17/2017 P. Brindza, S. Lassiter, M. Fowler
C1771 SHMS Detector locations, wire chambers 1 &2 and gas chamber 02/16/2017 B. Sawatzky, M.Long
C1768 HMS detectors 02/13/2017 B. Sawatzky, D. Gaskell
C1767 Hall C IPM3P02A-B 02/08/2017 D. Gaskell, K. Cole, P. Francis
C1733 flange locations near target can 10/06/2016 P. Mederiros
C1722 Line C MQF3M01 Girder 06/08/2016 D. Gaskel
C1705 Bender Magnet Mapping tube centers - with full tube complement and altered fiducials.1705 03/11/2016 M. Fowler, E. Sun
C1702 Bender Magnet Mapping tube centers 03/07/2016 M. Fowler, E. Sun
C1691 HC Dump ISO wall profile. 01/19/2016 G. Hayes, A. DiPette
C1685 Pivot Flange Final As-found 11/23/2015 B. Metzger
C1683 Pivot Flange alignment 11/13/2015 B. Metzger
C1679 HMS central axis elevation 10/23/2015 J. Benesch; D. Gaskell; M. Fowler
C1676 Bender Mapper Plate Inspection 10/15/2015 M. Fowler, S. Lassiter
C1660 Hall C Dump Wall Profile 07/30/2015 A. Dipette, G. Hayes
C1651 HMS Detector Hut Frame Coordinates 06/12/2015 B. Metzger
C1648 Mapper aligned to Q1 06/05/2015 S. Lassiter, M. Fowler
C1641 Qweak Target Survey November 2010 Revised 05/19/2015 S. Woods, D. Gaskell, G. Smith, J. Dunne, S. Covrig
C1622 Qweak QTor Z locations 04/17/2015 G. Smith
C1617 Mapper Probe Rotation Inspection 03/25/2015 M. Fowler
C1615 Q1 Mapper location 03/24/2015 M. Fowler, S. Lassiter
C1607 HALL C MAPPER QC 03/06/2015 M.FOWLER, S.LASSITER
C1563 Moller Coil Inspection 1-5 05/15/2014 P. Medeiros
C1535 HMS Q1 surface profile. 01/16/2014 B. Metzger
C1517 Qweak Collimators upstream / mid post run 2011 07/29/2013 S. Wood, G. Smith, D. Gaskell, D. Mack, B. Sawatzky
C1510 SHMS Bearing Survey 06/11/2013 S. Wood, M. Fowler
C1509 Hall C Wall Topo Survey 05/22/2013 M. Fowler
C1502 SHMS Rail and Pivot Inspection 03/28/2013 Mike Fowler
C1497 SHMS Bogie inspections. 03/15/2013 M. Fowler
C1491 Control Points for SHMS Rail Installation 01/24/2013 M. Fowler
C1489 Region 2 QWeak final data (data june 2012) 01/15/2013 Mark Pitt
C1482 Region 3 Quartz detectors post run survey June 30/2012 10/09/2012 D.Mack, D. Gaskell, D.Wood, M. Dalton
C1479 Qweak target survey Nov 2011, June 2012 (recalculated) 09/06/2012 S. Wood, D. Gaskell, G. Smith, J. Dunne, S. Covrig
C1475 Qweak Post run H Target/Optics target relationship. 08/06/2012 S. Wood, D. Gaskell, G. Smith, J. Dunne, S. Covrig
C1472 Qweak BPM/SH post run survey. 07/25/2012 D. Gaskell, N. Okay, J Benesch
C1468 Qweak Post run Target Survey June 2012 07/03/2012 S. Wood, D. Gaskell, G. Smith, J. Dunne, S. Covrig
C1464 Line C Compton E detector post run relative to MC3P03. 06/19/2012 A. Narayan
C1461 Electron detector 06/08/2012 A. Narayan, D. Gaskell
C1460 QW9C LINE COMPONENTS. 06/04/2012 D. Gaskell
C1459 Compton laser table/photon detector. 06/01/2012 D. Gaskell
C1426 Line C Compton detector pre-alignment/beamline position. 01/04/2012 A. Asaturyan, A. Narayan, D. Gaskell
C1420 Re-survey of the region 2 detectors Nov 2011 11/16/2011 Mark Pitt
C1418 Region 3 detector after 6 month down 11/10/2011 S. Wood, B Sawatzky, D. Armstrong, D. Gaskell
C1417 Qweak Target Survey November 2011 11/10/2011 S. Woods, D. Gaskell, G. Smith, J. Dunne, S. Covrig
C1416 Compton laser table/photon detector. 11/08/2011 D. Gaskell
C1414 quartz detectors as of Oct 26, 2011 10/28/2011 D. Mack, D. Gaskell, S. Wood
C1413 Hall C Elevation Survey for HKS removal 10/27/2011 R. Carlini, D. Gaskell, G. Smith, S. Wood
C1406 Results from Region 2 survey 09/08/2011 Mark Pitt
C1396 Line C Compton E detector Z location. 05/24/2011 A. Asaturyan, A. Narayan, D. Gaskell
C1353 unser girder beam pipe circles QWeak 12/01/2010 D. Mack, J. Benesch, D. Gaskell
C1346 QWeak BPMs on Girder upstream of target 11/11/2010 J.Benesch, D. Gaskell, N. Okay
C1340 Qweak Target Survey November 2010 11/05/2010 S. Woods, D. Gaskell, G. Smith, J. Dunne, S. Covrig
C1335 Region 3 detector / rotator - verifications 10/20/2010 S. Wood, B Sawatzky, D. Armstrong, D. Gaskell
C1333 Line C Compton electron det. + BPM's 10/14/2010 D. Gaskell, J. Benesch, M. Dalton
C1332 Qweak target fiducials. 10/12/2010 J. Dunne
C1329 Qweak Target Survey October 2010 10/11/2010 S. Woods, D. Gaskell, G. Smith, J. Dunne, S. Covrig
C1325 Qweak H target cell cell length. 10/05/2010 G. Smith, S Covrig
C1321 Qweak optics target cell offsets. 09/28/2010 G. Smith, S Covrig
C1319 QTor Lintel Locations after moved 09/21/2010 D.Mack, D. Gaskell
C1317 Line C Compton detector pre-alignment. 09/09/2010 A. Asaturyan, A. Narayan, D. Gaskell
C1313 QWeak quads/dipoles from Q3C17 to QE3M03 08/24/2010 J.Benesch, D. Gaskell, N. Okay
C1307 Qweak Target Survey 07/22/2010 S. Woods, D. Gaskell, G. Smith, J. Dunne, S. Covrig
C1305 Line C moller. 07/16/2010 D. Gaskell, S. Wood
C1302 Qweak scanner 07/13/2010 P. Wang, D. Gaskell, S. Wood
C1300 QWeak BPMs / Harps from Q3C17 to QW Target 07/08/2010 J.Benesch, D. Gaskell, N. Okay
C1298 Hall C dump viewer 07/06/2010 J. Benesch, N. Okay, D. Gaskell
C1295 Qweak Collimators 1/2/3 Step2b 06/30/2010 S. Wood, G. Smith, D. Gaskell, D. Mack, B. Sawatzky
C1293 QWeak Region 3 rotor repeatablity survey round 2 06/24/2010 S. Wood, B. Sawatzky, D. Gaskell
C1292 Beampipe Flanges QWeak D/S of Ferris and dump flange 06/18/2010 B Dillion-Townes, S. Worthington, D. Gaskell
C1291 quartz detectors as of June 11 2010 06/04/2010 D. Mack, D. Gaskell, S. Wood
C1288 location of beam dump flange 05/21/2010 S. Worthington, B. Dillon-Townes
C1286 QWeak Region 3 rotor repeatablity survey 05/20/2010 S. Wood, B. Sawatzky, D. Gaskell, A. Kenyon
C1283 QTOR coil check (field mapping discrepancy) 05/07/2010 R. Carlini, W. Falk, S. Wood, D. Gaskell
C1282 QTOR Lintel locations 05/06/2010 S.Wood, D.Gaskell, G. Smith, A. Kenyon
C1275 Qweak target vacuum windows. 03/26/2010 S. Lassiter
C1274 QTor all 8 coils step2b 03/24/2010 S. Wood, D. Gaskell, G. Smith, A. Kenyon
C1269 Line C moller collimator. 03/11/2010 D. Gaskell
C1268 Rotator position 03/10/2010 D. Gaskell, B. Sawatzky, A. Kenyon
C1265 Line C moller collimator. 03/03/2010 D. Gaskell
C1264 Rotator feet movements 02/25/2010 A. Kenyon, D. Gaskell
C1260 QTor all 8 coils step 1 check 01/22/2010 S. Wood, D. Gaskell, G. Smith, A. Kenyon
C1254 QWeak QTor Frame Asfound / Check 12/18/2009 S. Wood, D. Gaskell, G. Smith, A. Kenyon
C1251 HKS/HES sieve post run calibration. 12/04/2009 T. Maruta, N. Nakamura
C1250 HKS/HES post run survey results. 11/23/2009 T. Maruta, N. Nakamura, M. Spata, N. Okay
C1248 HKS/HES target/splitter post run survey. 11/10/2009 T. Maruta, N. Nakamura
C1247 QTor coil analysis 10/28/2009 Greg Smith, Steve Wood, Karen Dow, Dave Gaskell
C1244 Qweak pump housing. 09/22/2009 J. Brock
C1243 Pivot/HKS girder survey results. 09/04/2009 M. Spata, N. Okay, R. Gonzales, N. Nakamura
C1238 HKS/HES survey results. 08/17/2009 T. Maruta, N. Nakamura, M. Spata, N. Okay
C1236 Hall C dump viewer. 08/05/2009 B. Dillon-Townes, S. Worthington
C1234 HKS/HES target calibration. 07/07/2009 T. Maruta, N. Nakamura
C1232 HES sieve calibration. 06/17/2009 T. Maruta, N. Nakamura
C1231 HKS sieve calibration. 06/16/2009 T. Maruta, N. Nakamura
C1222 Sane girder calculation error 03/05/2009 M. Jones, N. Okay, S. Wood
C1220 Sane survey 02/13/2009 M. Jones, N. Okay, S. Wood
C1213 Sane target survey 01/14/2009 M. Jones, N. Okay, S. Wood
C1210 Hall C diagnostics to target Z dist. 01/12/2009 M. Jones
C1205 Sane survey 12/17/2008 M. Jones, N. Okay, S. Wood
C1203 Floor Elevations 11/24/2008 B. Dillon-Townes, H. Park
C1188 Check Survey of Sane Target Can 10/16/2008 M. Jones, D. Day, M. Seely
C1187 Sane Cerenkov Location & Fiducials (Preliminary) 10/15/2008 M. Fowler
C1178 Hall C HMS collimator survey. 08/11/2008 M. Jones, S. Wood
C1171 Hall C target post run survey. 07/01/2008 D. Meekins, N. Okay, S. Wood, M. Jones
C1169 Big Cal detector -44 Deg. position. 06/20/2008 M. Jones, S. Wood, C. Perdrisat
C1167 Big Cal detector -69 Deg. position. 05/09/2008 M. Jones, S. Wood, C. Perdrisat
C1161 Sane cerenkov 2b 03/25/2008 M. Jones, E. Kaczanowicz, S. Wood
C1160 Target survey. 03/24/2008 D. Meekins, N. Okay, S. Wood, M. Jones
C1159 IHA3C07a-b Harp fiducialization/2b. 03/07/2008 A. Freyberger, S. Wood
C1153 Big Cal detector -30.8 deg, -105.1 deg. positions. 01/15/2008 M. Jones, S. Wood, C. Perdrisat
C1152 Big Cal detector -32.2 Deg. position. 01/07/2008 M. Jones, S. Wood, C. Perdrisat
C1148 Big Cal detector 3rd position. 12/03/2007 M. Jones, S. Wood, C. Perdrisat
C1146 Big Cal detector 2nd position. 11/26/2007 M. Jones, S. Wood
C1142R Big Cal detector 1st position. 11/15/2007 M. Jones, S. Wood
C1139 HMS Pointings Oct 2007. 11/06/2007 M. Jones, S. Wood
C1134 Line C diagnostics/target survey. 10/30/2007 S. Wood, M. Jones, D. Meekins, N. Okay
C1130 HMS hut GEP detectors. 10/08/2007 F. Wesselmann, C. Perdrisat
C1129 Moller Magnets in 3C line 09/24/2007 D. Gaskel, S. Wood, J. Benesch, Noel Okay
C1127 Actual Laid out points for GEP experiment 08/31/2007 C. Perdrisat
C1120 Target survey. 07/26/2007 J. Benesch, N. Okay, D. Meekins, P. Solvignon
C1114 GEp-III focal plane polarimeter. 06/01/2007 F. Wesselmann
C1111 HMS Pointings May 2007. 05/14/2007 P. Solvignon, S. Wood
C1110 Target/beam line survey. 05/08/2007 J. Benesch, N. Okay, D. Meekins, P. Solvignon
C1109 Locations of stands / flanges for bpm box replacement 04/27/2007 B. Miller, M. Wiseman
C1106 G0 post run survey. 04/20/2007 D. Gaskel
C1104 BigCal fiducialization 03/16/2007 C. Perdrisat
C1085 Line C moeller polarimeter surveys 11/13/2006 D. Gaskell, R. Ent
C1076 Hall C pivot diagnostics girder survey 09/14/2006 D. Gaskell, N. Okay, J. Benesch, Y. Wang, J. Grames
C1075 HMS hut rail profile 09/11/2006 B. Metzger
C1069 G0 diagnostics components survey 07/21/2006 D. Gaskell, N. Okay, J. Benesch, Y. Wang, J. Grames
C1059 Cryo platform plate elevations 05/22/2006 N. Wilson
C1057 G0 diagnostics and halo girder surveys 05/08/2006 D. Gaskell, N. Okay, J. Benesch, Y. Wang
C1049 G0 backangle SMS, Ferris Wheel and Target survey 03/15/2006 G. Smith, D. Gaskell, J. Benesch, Y. Wang
C1048 Line C component survey (d/strm of hall center) 03/13/2006 D. Gaskell, N. Okay, J. Benesch, Y. Wang
C1046 Line C component survey (d/strm of shield wall) 03/08/2006 D. Gaskell, N. Okay, J. Benesch, Y. Wang
C1025 G0 back angle FW octant locations 12/01/2005 L. Lee, D. Gaskell
C1018 G0 Mini Ferris Wheel shim survey 11/01/2005 B. Metzger
C1017 G0 Mini Ferris Wheel octant inspection 10/27/2005 L. Lee
C1015 G0 Ferris Wheel support arm inspection 10/17/2005 B. Metzger
C1012 Survey of Hall C cryo cans 10/06/2005 A. Guerra, R. Wolfley
C1010 Fission chamber survey 09/27/2005 M. Spata, N. Okay, L. Tang
C1009 Fission chamber offset 09/19/2005 W. Oren
C997 HKS viewer locations 06/07/2005 A. Bogacz, N. Okay, R. Ent, A. Freyberger
C996 HKS spectrometer surveys 06/06/2005 R. Ent, L. Tang
C995 HKS beamline diagnostics component survey 06/01/2005 R. Ent, M. Spata, A. Freyberger
C992 Dump viewer survey 04/25/2005 E. Abkemeier, A. Freyberger, N. Okay
C986 Spool piece dictances around pivot 04/12/2005 C. Hutton
C985 Moeller Polarimeter survey 04/07/2005 C. Yan
C977 Pivot diagnostic girder post run survey 02/01/2005 R. Ent, M. Spata, A. Freyberger
C976 Tuna can target post run survey 01/31/2005 D. Meekins, R. Ent
C973 Enge slit collimator calibration 01/21/2005 L. Tang, M. Sumihama
C965 SOS drift chamber and Cerenkov alignment 11/22/2004 R. Ent, P. Bosted, M. Fowler, P. Medeiros
C955 Dump viewer and Pavelometer survey 09/20/2004 E. Abkemeier, J. Benesch, M. Spata, S. Suhring
C953 Tuna can target survey 09/20/2004 D. Meekins, R. Ent
C935 Pivot diagnostic girder and BPM survey 06/18/2004 R. Ent, M. Spata, A. Freyberger
C934 Tuna can target survey 06/17/2004 D. Meekins, R. Ent
C929 G0 beamline diagnostics post run survey 05/24/2004 R. Ent, J. Yun, G. Smith
C919 QWeak pre-collimator check measurements 03/09/2004 M. Fowler, P. Brindza
C909 G0 beamline diagnostics survey 11/19/2003 R. Ent, J. Yun, G. Smith
C898 Pivot diagnostic girder survey 09/17/2003 M. Spata, R. Ent
C896 Tuna Can target post run survey 09/11/2003 D. Meekins, G. Warren, R. Ent
C894 G0 target alignment and calibration 09/10/2003 S. Covrig, L. Hannelius
C877 HMS & SOS Pointings July  2003. 07/10/2003 R. Ent
C853 HMS & SOS Pointings -  Mar/Apr 2003. 04/08/2003 J. Reinhold, G. Warren, R. Ent
C852 Diagnostic Girder Components 04/07/2003 M.Spata,R. Ent
C851 Hall C target survey 04/04/2003 D. Meekins, G. Warren, R. Ent
C846 Line C components for G0 03/12/2003 R. Ent, P. Ross, G. Smith
C826 HALL C G-ZERO components asfound 11/01/2002 Rolf Ent, Philip Roos
C822 Line C diagnostic girders. 10/29/2002 Benesch, Spata, Yan, Yun
C821 SOS rail survey. 10/22/2002 W. Kellner
C816 Hall C dump viewer 10/02/2002 J. Benesch, M. Spata, S. Suhring
C802 Line C components for G0 08/22/2002 J. Benesch, M. Spata, R. Ent, R. Carlini
C797 G0 Sealing surface and ring flatness inspection (dump) 07/26/2002 Steve Lassiter
C788 Hall C pivot elevation 06/19/2002 B. Metzger
C786 Hall C target cool down. 06/11/2002 G. Smith, S. Covrig
C774 G0 octant alignment relative to FW. 05/23/2002 Philip Roos
C771 Hall C Pivot Bolt Holes 05/15/2002 Bert Metzger
C763 Hall C G0 target calibration. 05/03/2002 Silviu Covrig
C749 Line C chicane/target tune up position 03/14/2002 O. Rondon, M. Jones, (J. Benesch - email)
C748 Hall C polarized target shell 03/13/2002 M. Sealy, D. Day, O. Rondon
C739 Line C chicane/target tune up position 02/14/2002 O. Rondon, M. Jones, (J. Benesch - email)
C733 Line C chicane/90 degree position 01/24/2002 O. Rondon, M. Jones
C732 Line C chicane/target tune up position 01/18/2002 O. Rondon, M. Jones, (J. Benesch - email)
C729 G zero support rail heights. 01/09/2002 Lassiter
C728 Line C GEN01 chicane/target as found (3.481gev) 01/04/2002 Donal Day, Jay Benish,Marco Zeier, Chen Yan
C715 HMS vacuum pipe 11/02/2001 Rolf Ent
C714 Line C GEN01 chicane/target move (3.481gev) 10/30/2001 Donal Day, Jay Benish,Marco Zeier, Chen Yan
C713 Line C GEN01 chicane move (TUNE UP) 10/18/2001 Donal Day, Jay Benish,Marco Zeier, Chen Yan
C710 G0 octant shim packs(2nd set). 10/15/2001 S. Lassiter
C707 GEN01 Target Can & target asfound survey 2001.10.10 10/10/2001 Donal Day, Marko Zeier
C706 G0 octant shim packs(initial set). 10/09/2001 S. Lassiter
C705 GEN01 Target probe survey 25 Sep 2001 10/03/2001 Donal Day, Marko Zeier
C704 GEN01 Target move 30 Jul 2001 10/01/2001 Donal Day, Marko Zeier
C585 G Zero Octan 1 results 03/20/2000 S. Lassiter
C584 G Zero Octan 4 results 03/16/2000 S. Lassiter
C583 G Zero Octan 2 results 03/15/2000 S. Lassiter
C581 G Zero Octan 3 results 03/10/2000 S. Lassiter