DT # |
Description |
Date |
Recipient |
|
C2069 |
Hall_C NPS detector grid |
05/16/2023 |
S. Malace, C. Munoz |
C557 |
Superharp survey and replacement of SH05/SH06 w/ SH09/SH10 |
10/19/99 |
Chen Yan |
C558 |
Superharp survey and replacement of SH01/SH02 w/ SH11/SH12 |
10/28/99 |
Chen Yan |
C560 |
Hall C Target Location survey nov 8th.. Optics / Solid Targets |
11/16/99 |
Ent Seely |
C566 |
SuperHarp survey at 3C12 >> SH11/SH12 replaced w SH14/SH13 |
12/02/99 |
YAN GUEYE |
C570 |
Post Run Target Survey Hall C (survey dec12,1999) |
1/19/00 |
Ent Seely |
C575 |
G zero octant plate survey |
2/18/00 |
Lassiter |
C582 |
Superharp survey from Jan2000 |
3/17/00 |
Chen Guye Mack |
C592 |
G zero light guide assembly(#4) qc survey |
4/11/00 |
Lassiter |
C594 |
QC light guide survey relaxed |
4/17/00 |
Lassiter |
C595 |
Ferris Wheel Axyz Survey Results |
4/21/00 |
Lassiter |
C605 |
HNSS detector |
5/23/00 |
Liguang Tang |
C610 |
Gzero Detector1 Light Guide Sag Survey |
6/14/00 |
Steve Lassiter |
C612 |
Hall C Loop 3 Target Data |
7/7/00 |
Jim Dunn |
C616 |
Hall C Target Cell Alignment |
7/11/00 |
Mike Seely |
C617 |
superharps |
7/11/00 |
Jim Dunne |
C618 |
Hall C Target Cell Alignment Origin Position |
7/12/2000 |
Mike Seely |
C633 |
Crane Survey |
10/3/00 |
Dave Kausch, Bill Rust |
C635 |
Hall C Cryogenic Target Location |
10/11/00 |
Mike Seely, Dave Meekins |
C637 |
Hall C Downstream beampipe |
10/18/00 |
Thia Keppel |
C638 |
G0 Rail Floor Topo |
10/19/00 |
Steve Lassiter |
C660 |
Hall C target |
3/9/01 |
Dave Meekins, Mike Seely |
C662 |
Hall C target |
3/13/01 |
Dave Meekins, Mike Seely |
C664 |
Hall C control |
3/29/2001 |
W. Kellner, S. Lassiter |
C670 |
Hall C target post run survey (GEN00) |
5/3/01 |
Dave Meekins, Mike Seely |
C676 |
Gen00 Bunker As Found |
6/26/2001 |
R. Madey, B. Anderson |
C677 |
HMS Pointing at 18 deg. |
6/28/2001 |
Marko Zeier, Rolf Ent, Mike Fowler |
C681 |
Charybdis magnet |
7/11/01 |
Glen MacLachlan |
C683 |
GEN01 super harp data |
7/16/01 |
Chen Yan, Paul Gueye, Yan Wang, Sam Donagoulian |
C684 |
Line C GEN01/Moeller components |
7/16/01 |
Jay Benesch, Mike Spata, Howard Fenker |
C685 |
Line C GEN01 diagnostic components |
7/17/2001 |
Jay Benesch, Mike Spata, Howard Fenker |
C686 |
Line C GEN01 chicane move (2.332GeV) |
7/27/2001 |
Jay Benesch, Donal Day, Rolf Ent |
C694 |
Gzero Target alignment and encoder values |
8/24/01 |
K. Gustafsson, S. Coving, G. Smith |
C696 |
GEN01 target fixture calibration |
8/30/01 |
Marko Zeier, Markus Hauger |
C2049 |
Hall C Target September 2022 check |
09/15/2022 |
D. Meekins, D. Gaskell |
C2046 |
Hall C Detector test stand for 2022 run |
08/05/2022 |
M. Mnycz, J. Zhang |
C2034 |
Hall C Target June 2022 run |
05/31/2022 |
D. Meekins, D. Gaskell |
C2034 |
Hall C Target June 2022 run |
05/31/2022 |
D. Meekins, D. Gaskell |
C2005 |
Hall C 3H line components coordinates report |
09/10/2021 |
D. Gaskell,J. Benesch, Y. Roblin |
C2004 |
Hall C 3C, Compton, and 3M components coordinates report |
09/10/2021 |
D. Gaskell,J. Benesch, Y. Roblin |
C1996 |
Hall C Downsteam Beampipe Asfound Locations |
06/28/2021 |
W. Kellner, S. Lassiter |
C1992 |
Hall C Crystal/Glass Quality Inspection |
12/11/2020 |
Tanja Horn, Vladimir Berdnikov |
C1985 |
A1N compass measurements |
10/13/2020 |
B. Sawatzky, JP. Chen, M. Roy, A. Tadepalli |
C1984 |
D2N Post run compass and target cell |
10/13/2020 |
B. Sawatzky, JP. Chen, M. Roy, A. Tadepalli |
C1982 |
SHMS Pointing from 11/27/2019 ~15.5 degrees |
09/18/2020 |
B. Sawatzky,D.Gaskel, M.Jones |
C1981 |
SHMS Pointing from 11/26/2019 ~33.0 degrees |
09/18/2020 |
B. Sawatzky,D.Gaskel, M.Jones |
C1980 |
HMS Pointing - ~12.5 deg - 11/27/2019 not processed earlier1980 |
09/18/2020 |
B. Sawatzky, D. Gaskel, M. Jones, S. Lassiter, M. Fowler |
C1975 |
Hall C Super Harp Girder IHA3H07B |
07/20/2020 |
D. Gaskell, J. Benesch |
C1956 |
moller, collimator As Found November 2019 |
12/04/2019 |
D. Gaskell |
C1956 |
moller, collimator As Found November 2019 |
12/04/2019 |
D. Gaskell |
C1956 |
moller, collimator As Found November 2019 |
12/04/2019 |
D. Gaskell |
C1953 |
HMS Pointing - 30 deg - 11/2019 |
11/27/2019 |
B. Sawatzky, D. Gaskel, M. Jones, S. Lassiter, M. Fowler |
C1938 |
moller, collimator, QE mags as-found summer 2019 |
08/29/2019 |
D. Gaskell |
C1917 |
Inspection of new pivot flange |
04/19/2019 |
B. Metzger |
C1904 |
Hall C Super Harp Girder, IHA3H07A,B_IPM3H07A,B,C |
02/07/2019 |
D. Gaskell, J. Benesch |
C1869 |
Hall C Target Post Run Survey |
06/20/2018 |
D. Meekins |
C1876 |
SHMS Pointing (2) 23 & 13 degrees - HMS at 65 degrees |
08/14/2018 |
B. Sawatzky, D. Gaskel, M. Jones, S. Lassiter, M. Fowler |
C1878 |
Hall C Target Fall Run Survey |
08/15/2018 |
D. Meekins |
C1881 |
IHA3H07A/7B plus radiator locations and encoder values(7A only) in decimal(after wire re-work) |
08/17/2018 |
D. Gaskell, J. Benesch, M. Keesee, C. Seaton, K. Cole |
C1889 |
IPM3H08 & 09 Locations |
09/27/2018 |
J. Musson, J. Benesch |
C1847 |
IHA3H07A & B locations and encoder values in decimal(after wire re-work)1847 |
01/10/2018 |
D. Gaskell, J. Benesch, M. Keesee, C. Seaton, K. Cole |
C1842 |
HMS Pointing at 35,15(twice),40(twice), 26 degrees |
01/02/2018 |
B. Sawatzky, D. Gaskel, M. Jones, S. Lassiter, M. Fowler |
C1834 |
IHA3H07A & B locations and encoder values in decimal |
12/01/2017 |
D. Gaskell, J. Benesch, M. Keesee, C. Seaton, K. Cole |
C1832 |
HMS Wire Chamber 1 & 2 |
11/30/2017 |
B. Sawatzky, D. Gaskell |
C1820 |
SHMS Dipole Mapper with new probe and a 90 degree offset1820 |
10/18/2017 |
S. Lassiter, P. Medeiros, E. Sun |
C1819 |
Hall C Target Fall 2017 Survey |
10/12/2017 |
D. Meekins, S. Lassiter |
C1814 |
SHMS Dipole Mapper |
09/11/2017 |
S. Lassiter, P. Medeiros, E. Sun |
C1812 |
SHMS Pointing - approximately at 15 degrees |
08/24/2017 |
B. Sawatzky, D. Gaskel, M. Jones, S. Lassiter, M. Fowler |
C1810 |
SHMS Pointing at approx 40 degrees |
08/08/2017 |
B. Sawatzky, D. Gaskel, M. Jones, S. Lassiter, M. Fowler |
C1809 |
HMS Pointing at approx 50 degrees |
08/04/2017 |
B. Sawatzky, D. Gaskel, M. Jones, S. Lassiter, M. Fowler |
C1808 |
SHMS Pointing - approximately at 25 degrees |
08/04/2017 |
B. Sawatzky, D. Gaskel, M. Jones, S. Lassiter, M. Fowler |
C1807 |
HMS Pointing |
08/04/2017 |
B. Sawatzky, D. Gaskel, M. Jones, S. Lassiter, M. Fowler |
C1806 |
SHMS Pointing - approximately at 15 degrees |
08/03/2017 |
B. Sawatzky, D. Gaskel, M. Jones, S. Lassiter, M. Fowler |
C1796 |
SHMS Pointing - using both sides. approx 20 degrees br |
06/14/2017 |
D. Gaskel, B. Sawatzky, M. Jones |
C1793 |
SHMS Pointing - using yokes and coils - close to beam line position |
06/07/2017 |
D. Gaskel, B. Sawatzky, M. Jones |
C1792 |
HMS Pointing - using both sides and checks using singular data |
06/07/2017 |
D. Gaskel, B. Sawatzky, M. Jones |
C1790 |
SHMS 1st Pointing results |
05/22/2017 |
D. Gaskel, B. Sawatzky, M. Jones |
C1780 |
HC super harp girder |
03/07/2017 |
D. Gaskell |
C1778 |
Hall C Target Survey 020617 |
03/06/2017 |
D. Meekins, D. Gaskill |
C1777 |
Hall C Mega BPM locations |
03/06/2017 |
J. Benesch, D. Gaskell, J. Musson, D. Moser, M. McCaughan |
C1776 |
SHMS Magnet Locations prior to KPP run. |
03/01/2017 |
P. Brindza, S. Lassiter, M. Fowler |
C1773 |
SHMS Dipole Yoke and Coil Aperture Offsets from 2B Alignment 021617 |
02/17/2017 |
P. Brindza, S. Lassiter, M. Fowler |
C1771 |
SHMS Detector locations, wire chambers 1 &2 and gas chamber |
02/16/2017 |
B. Sawatzky, M.Long |
C1768 |
HMS detectors |
02/13/2017 |
B. Sawatzky, D. Gaskell |
C1767 |
Hall C IPM3P02A-B |
02/08/2017 |
D. Gaskell, K. Cole, P. Francis |
C1733 |
flange locations near target can |
10/06/2016 |
P. Mederiros |
C1722 |
Line C MQF3M01 Girder |
06/08/2016 |
D. Gaskel |
C1705 |
Bender Magnet Mapping tube centers - with full tube complement and altered fiducials.1705 |
03/11/2016 |
M. Fowler, E. Sun |
C1702 |
Bender Magnet Mapping tube centers |
03/07/2016 |
M. Fowler, E. Sun |
C1691 |
HC Dump ISO wall profile. |
01/19/2016 |
G. Hayes, A. DiPette |
C1685 |
Pivot Flange Final As-found |
11/23/2015 |
B. Metzger |
C1683 |
Pivot Flange alignment |
11/13/2015 |
B. Metzger |
C1679 |
HMS central axis elevation |
10/23/2015 |
J. Benesch; D. Gaskell; M. Fowler |
C1676 |
Bender Mapper Plate Inspection |
10/15/2015 |
M. Fowler, S. Lassiter |
C1660 |
Hall C Dump Wall Profile |
07/30/2015 |
A. Dipette, G. Hayes |
C1651 |
HMS Detector Hut Frame Coordinates |
06/12/2015 |
B. Metzger |
C1648 |
Mapper aligned to Q1 |
06/05/2015 |
S. Lassiter, M. Fowler |
C1641 |
Qweak Target Survey November 2010 Revised |
05/19/2015 |
S. Woods, D. Gaskell, G. Smith, J. Dunne, S. Covrig |
C1622 |
Qweak QTor Z locations |
04/17/2015 |
G. Smith |
C1617 |
Mapper Probe Rotation Inspection |
03/25/2015 |
M. Fowler |
C1615 |
Q1 Mapper location |
03/24/2015 |
M. Fowler, S. Lassiter |
C1607 |
HALL C MAPPER QC |
03/06/2015 |
M.FOWLER, S.LASSITER |
C1563 |
Moller Coil Inspection 1-5 |
05/15/2014 |
P. Medeiros |
C1535 |
HMS Q1 surface profile. |
01/16/2014 |
B. Metzger |
C1517 |
Qweak Collimators upstream / mid post run 2011 |
07/29/2013 |
S. Wood, G. Smith, D. Gaskell, D. Mack, B. Sawatzky |
C1510 |
SHMS Bearing Survey |
06/11/2013 |
S. Wood, M. Fowler |
C1509 |
Hall C Wall Topo Survey |
05/22/2013 |
M. Fowler |
C1502 |
SHMS Rail and Pivot Inspection |
03/28/2013 |
Mike Fowler |
C1497 |
SHMS Bogie inspections. |
03/15/2013 |
M. Fowler |
C1491 |
Control Points for SHMS Rail Installation |
01/24/2013 |
M. Fowler |
C1489 |
Region 2 QWeak final data (data june 2012) |
01/15/2013 |
Mark Pitt |
C1482 |
Region 3 Quartz detectors post run survey June 30/2012 |
10/09/2012 |
D.Mack, D. Gaskell, D.Wood, M. Dalton |
C1479 |
Qweak target survey Nov 2011, June 2012 (recalculated) |
09/06/2012 |
S. Wood, D. Gaskell, G. Smith, J. Dunne, S. Covrig |
C1475 |
Qweak Post run H Target/Optics target relationship. |
08/06/2012 |
S. Wood, D. Gaskell, G. Smith, J. Dunne, S. Covrig |
C1472 |
Qweak BPM/SH post run survey. |
07/25/2012 |
D. Gaskell, N. Okay, J Benesch |
C1468 |
Qweak Post run Target Survey June 2012 |
07/03/2012 |
S. Wood, D. Gaskell, G. Smith, J. Dunne, S. Covrig |
C1464 |
Line C Compton E detector post run relative to MC3P03. |
06/19/2012 |
A. Narayan |
C1461 |
Electron detector |
06/08/2012 |
A. Narayan, D. Gaskell |
C1460 |
QW9C LINE COMPONENTS. |
06/04/2012 |
D. Gaskell |
C1459 |
Compton laser table/photon detector. |
06/01/2012 |
D. Gaskell |
C1426 |
Line C Compton detector pre-alignment/beamline position. |
01/04/2012 |
A. Asaturyan, A. Narayan, D. Gaskell |
C1420 |
Re-survey of the region 2 detectors Nov 2011 |
11/16/2011 |
Mark Pitt |
C1418 |
Region 3 detector after 6 month down |
11/10/2011 |
S. Wood, B Sawatzky, D. Armstrong, D. Gaskell |
C1417 |
Qweak Target Survey November 2011 |
11/10/2011 |
S. Woods, D. Gaskell, G. Smith, J. Dunne, S. Covrig |
C1416 |
Compton laser table/photon detector. |
11/08/2011 |
D. Gaskell |
C1414 |
quartz detectors as of Oct 26, 2011 |
10/28/2011 |
D. Mack, D. Gaskell, S. Wood |
C1413 |
Hall C Elevation Survey for HKS removal |
10/27/2011 |
R. Carlini, D. Gaskell, G. Smith, S. Wood |
C1406 |
Results from Region 2 survey |
09/08/2011 |
Mark Pitt |
C1396 |
Line C Compton E detector Z location. |
05/24/2011 |
A. Asaturyan, A. Narayan, D. Gaskell |
C1353 |
unser girder beam pipe circles QWeak |
12/01/2010 |
D. Mack, J. Benesch, D. Gaskell |
C1346 |
QWeak BPMs on Girder upstream of target |
11/11/2010 |
J.Benesch, D. Gaskell, N. Okay |
C1340 |
Qweak Target Survey November 2010 |
11/05/2010 |
S. Woods, D. Gaskell, G. Smith, J. Dunne, S. Covrig |
C1335 |
Region 3 detector / rotator - verifications |
10/20/2010 |
S. Wood, B Sawatzky, D. Armstrong, D. Gaskell |
C1333 |
Line C Compton electron det. + BPM's |
10/14/2010 |
D. Gaskell, J. Benesch, M. Dalton |
C1332 |
Qweak target fiducials. |
10/12/2010 |
J. Dunne |
C1329 |
Qweak Target Survey October 2010 |
10/11/2010 |
S. Woods, D. Gaskell, G. Smith, J. Dunne, S. Covrig |
C1325 |
Qweak H target cell cell length. |
10/05/2010 |
G. Smith, S Covrig |
C1321 |
Qweak optics target cell offsets. |
09/28/2010 |
G. Smith, S Covrig |
C1319 |
QTor Lintel Locations after moved |
09/21/2010 |
D.Mack, D. Gaskell |
C1317 |
Line C Compton detector pre-alignment. |
09/09/2010 |
A. Asaturyan, A. Narayan, D. Gaskell |
C1313 |
QWeak quads/dipoles from Q3C17 to QE3M03 |
08/24/2010 |
J.Benesch, D. Gaskell, N. Okay |
C1307 |
Qweak Target Survey |
07/22/2010 |
S. Woods, D. Gaskell, G. Smith, J. Dunne, S. Covrig |
C1305 |
Line C moller. |
07/16/2010 |
D. Gaskell, S. Wood |
C1302 |
Qweak scanner |
07/13/2010 |
P. Wang, D. Gaskell, S. Wood |
C1300 |
QWeak BPMs / Harps from Q3C17 to QW Target |
07/08/2010 |
J.Benesch, D. Gaskell, N. Okay |
C1298 |
Hall C dump viewer |
07/06/2010 |
J. Benesch, N. Okay, D. Gaskell |
C1295 |
Qweak Collimators 1/2/3 Step2b |
06/30/2010 |
S. Wood, G. Smith, D. Gaskell, D. Mack, B. Sawatzky |
C1293 |
QWeak Region 3 rotor repeatablity survey round 2 |
06/24/2010 |
S. Wood, B. Sawatzky, D. Gaskell |
C1292 |
Beampipe Flanges QWeak D/S of Ferris and dump flange |
06/18/2010 |
B Dillion-Townes, S. Worthington, D. Gaskell |
C1291 |
quartz detectors as of June 11 2010 |
06/04/2010 |
D. Mack, D. Gaskell, S. Wood |
C1288 |
location of beam dump flange |
05/21/2010 |
S. Worthington, B. Dillon-Townes |
C1286 |
QWeak Region 3 rotor repeatablity survey |
05/20/2010 |
S. Wood, B. Sawatzky, D. Gaskell, A. Kenyon |
C1283 |
QTOR coil check (field mapping discrepancy) |
05/07/2010 |
R. Carlini, W. Falk, S. Wood, D. Gaskell |
C1282 |
QTOR Lintel locations |
05/06/2010 |
S.Wood, D.Gaskell, G. Smith, A. Kenyon |
C1275 |
Qweak target vacuum windows. |
03/26/2010 |
S. Lassiter |
C1274 |
QTor all 8 coils step2b |
03/24/2010 |
S. Wood, D. Gaskell, G. Smith, A. Kenyon |
C1269 |
Line C moller collimator. |
03/11/2010 |
D. Gaskell |
C1268 |
Rotator position |
03/10/2010 |
D. Gaskell, B. Sawatzky, A. Kenyon |
C1265 |
Line C moller collimator. |
03/03/2010 |
D. Gaskell |
C1264 |
Rotator feet movements |
02/25/2010 |
A. Kenyon, D. Gaskell |
C1260 |
QTor all 8 coils step 1 check |
01/22/2010 |
S. Wood, D. Gaskell, G. Smith, A. Kenyon |
C1254 |
QWeak QTor Frame Asfound / Check |
12/18/2009 |
S. Wood, D. Gaskell, G. Smith, A. Kenyon |
C1251 |
HKS/HES sieve post run calibration. |
12/04/2009 |
T. Maruta, N. Nakamura |
C1250 |
HKS/HES post run survey results. |
11/23/2009 |
T. Maruta, N. Nakamura, M. Spata, N. Okay |
C1248 |
HKS/HES target/splitter post run survey. |
11/10/2009 |
T. Maruta, N. Nakamura |
C1247 |
QTor coil analysis |
10/28/2009 |
Greg Smith, Steve Wood, Karen Dow, Dave Gaskell |
C1244 |
Qweak pump housing. |
09/22/2009 |
J. Brock |
C1243 |
Pivot/HKS girder survey results. |
09/04/2009 |
M. Spata, N. Okay, R. Gonzales, N. Nakamura |
C1238 |
HKS/HES survey results. |
08/17/2009 |
T. Maruta, N. Nakamura, M. Spata, N. Okay |
C1236 |
Hall C dump viewer. |
08/05/2009 |
B. Dillon-Townes, S. Worthington |
C1234 |
HKS/HES target calibration. |
07/07/2009 |
T. Maruta, N. Nakamura |
C1232 |
HES sieve calibration. |
06/17/2009 |
T. Maruta, N. Nakamura |
C1231 |
HKS sieve calibration. |
06/16/2009 |
T. Maruta, N. Nakamura |
C1222 |
Sane girder calculation error |
03/05/2009 |
M. Jones, N. Okay, S. Wood |
C1220 |
Sane survey |
02/13/2009 |
M. Jones, N. Okay, S. Wood |
C1213 |
Sane target survey |
01/14/2009 |
M. Jones, N. Okay, S. Wood |
C1210 |
Hall C diagnostics to target Z dist. |
01/12/2009 |
M. Jones |
C1205 |
Sane survey |
12/17/2008 |
M. Jones, N. Okay, S. Wood |
C1203 |
Floor Elevations |
11/24/2008 |
B. Dillon-Townes, H. Park |
C1188 |
Check Survey of Sane Target Can |
10/16/2008 |
M. Jones, D. Day, M. Seely |
C1187 |
Sane Cerenkov Location & Fiducials (Preliminary) |
10/15/2008 |
M. Fowler |
C1178 |
Hall C HMS collimator survey. |
08/11/2008 |
M. Jones, S. Wood |
C1171 |
Hall C target post run survey. |
07/01/2008 |
D. Meekins, N. Okay, S. Wood, M. Jones |
C1169 |
Big Cal detector -44 Deg. position. |
06/20/2008 |
M. Jones, S. Wood, C. Perdrisat |
C1167 |
Big Cal detector -69 Deg. position. |
05/09/2008 |
M. Jones, S. Wood, C. Perdrisat |
C1161 |
Sane cerenkov 2b |
03/25/2008 |
M. Jones, E. Kaczanowicz, S. Wood |
C1160 |
Target survey. |
03/24/2008 |
D. Meekins, N. Okay, S. Wood, M. Jones |
C1159 |
IHA3C07a-b Harp fiducialization/2b. |
03/07/2008 |
A. Freyberger, S. Wood |
C1153 |
Big Cal detector -30.8 deg, -105.1 deg. positions. |
01/15/2008 |
M. Jones, S. Wood, C. Perdrisat |
C1152 |
Big Cal detector -32.2 Deg. position. |
01/07/2008 |
M. Jones, S. Wood, C. Perdrisat |
C1148 |
Big Cal detector 3rd position. |
12/03/2007 |
M. Jones, S. Wood, C. Perdrisat |
C1146 |
Big Cal detector 2nd position. |
11/26/2007 |
M. Jones, S. Wood |
C1142R |
Big Cal detector 1st position. |
11/15/2007 |
M. Jones, S. Wood |
C1139 |
HMS Pointings Oct 2007. |
11/06/2007 |
M. Jones, S. Wood |
C1134 |
Line C diagnostics/target survey. |
10/30/2007 |
S. Wood, M. Jones, D. Meekins, N. Okay |
C1130 |
HMS hut GEP detectors. |
10/08/2007 |
F. Wesselmann, C. Perdrisat |
C1129 |
Moller Magnets in 3C line |
09/24/2007 |
D. Gaskel, S. Wood, J. Benesch, Noel Okay |
C1127 |
Actual Laid out points for GEP experiment |
08/31/2007 |
C. Perdrisat |
C1120 |
Target survey. |
07/26/2007 |
J. Benesch, N. Okay, D. Meekins, P. Solvignon |
C1114 |
GEp-III focal plane polarimeter. |
06/01/2007 |
F. Wesselmann |
C1111 |
HMS Pointings May 2007. |
05/14/2007 |
P. Solvignon, S. Wood |
C1110 |
Target/beam line survey. |
05/08/2007 |
J. Benesch, N. Okay, D. Meekins, P. Solvignon |
C1109 |
Locations of stands / flanges for bpm box replacement |
04/27/2007 |
B. Miller, M. Wiseman |
C1106 |
G0 post run survey. |
04/20/2007 |
D. Gaskel |
C1104 |
BigCal fiducialization |
03/16/2007 |
C. Perdrisat |
C1085 |
Line C moeller polarimeter surveys |
11/13/2006 |
D. Gaskell, R. Ent |
C1076 |
Hall C pivot diagnostics girder survey |
09/14/2006 |
D. Gaskell, N. Okay, J. Benesch, Y. Wang, J. Grames |
C1075 |
HMS hut rail profile |
09/11/2006 |
B. Metzger |
C1069 |
G0 diagnostics components survey |
07/21/2006 |
D. Gaskell, N. Okay, J. Benesch, Y. Wang, J. Grames |
C1059 |
Cryo platform plate elevations |
05/22/2006 |
N. Wilson |
C1057 |
G0 diagnostics and halo girder surveys |
05/08/2006 |
D. Gaskell, N. Okay, J. Benesch, Y. Wang |
C1049 |
G0 backangle SMS, Ferris Wheel and Target survey |
03/15/2006 |
G. Smith, D. Gaskell, J. Benesch, Y. Wang |
C1048 |
Line C component survey (d/strm of hall center) |
03/13/2006 |
D. Gaskell, N. Okay, J. Benesch, Y. Wang |
C1046 |
Line C component survey (d/strm of shield wall) |
03/08/2006 |
D. Gaskell, N. Okay, J. Benesch, Y. Wang |
C1025 |
G0 back angle FW octant locations |
12/01/2005 |
L. Lee, D. Gaskell |
C1018 |
G0 Mini Ferris Wheel shim survey |
11/01/2005 |
B. Metzger |
C1017 |
G0 Mini Ferris Wheel octant inspection |
10/27/2005 |
L. Lee |
C1015 |
G0 Ferris Wheel support arm inspection |
10/17/2005 |
B. Metzger |
C1012 |
Survey of Hall C cryo cans |
10/06/2005 |
A. Guerra, R. Wolfley |
C1010 |
Fission chamber survey |
09/27/2005 |
M. Spata, N. Okay, L. Tang |
C1009 |
Fission chamber offset |
09/19/2005 |
W. Oren |
C997 |
HKS viewer locations |
06/07/2005 |
A. Bogacz, N. Okay, R. Ent, A. Freyberger |
C996 |
HKS spectrometer surveys |
06/06/2005 |
R. Ent, L. Tang |
C995 |
HKS beamline diagnostics component survey |
06/01/2005 |
R. Ent, M. Spata, A. Freyberger |
C992 |
Dump viewer survey |
04/25/2005 |
E. Abkemeier, A. Freyberger, N. Okay |
C986 |
Spool piece dictances around pivot |
04/12/2005 |
C. Hutton |
C985 |
Moeller Polarimeter survey |
04/07/2005 |
C. Yan |
C977 |
Pivot diagnostic girder post run survey |
02/01/2005 |
R. Ent, M. Spata, A. Freyberger |
C976 |
Tuna can target post run survey |
01/31/2005 |
D. Meekins, R. Ent |
C973 |
Enge slit collimator calibration |
01/21/2005 |
L. Tang, M. Sumihama |
C965 |
SOS drift chamber and Cerenkov alignment |
11/22/2004 |
R. Ent, P. Bosted, M. Fowler, P. Medeiros |
C955 |
Dump viewer and Pavelometer survey |
09/20/2004 |
E. Abkemeier, J. Benesch, M. Spata, S. Suhring |
C953 |
Tuna can target survey |
09/20/2004 |
D. Meekins, R. Ent |
C935 |
Pivot diagnostic girder and BPM survey |
06/18/2004 |
R. Ent, M. Spata, A. Freyberger |
C934 |
Tuna can target survey |
06/17/2004 |
D. Meekins, R. Ent |
C929 |
G0 beamline diagnostics post run survey |
05/24/2004 |
R. Ent, J. Yun, G. Smith |
C919 |
QWeak pre-collimator check measurements |
03/09/2004 |
M. Fowler, P. Brindza |
C909 |
G0 beamline diagnostics survey |
11/19/2003 |
R. Ent, J. Yun, G. Smith |
C898 |
Pivot diagnostic girder survey |
09/17/2003 |
M. Spata, R. Ent |
C896 |
Tuna Can target post run survey |
09/11/2003 |
D. Meekins, G. Warren, R. Ent |
C894 |
G0 target alignment and calibration |
09/10/2003 |
S. Covrig, L. Hannelius |
C877 |
HMS & SOS Pointings
July 2003. |
07/10/2003 |
R. Ent |
C853 |
HMS & SOS Pointings - Mar/Apr
2003. |
04/08/2003 |
J. Reinhold, G. Warren, R. Ent |
C852 |
Diagnostic Girder Components |
04/07/2003 |
M.Spata,R. Ent |
C851 |
Hall C target survey |
04/04/2003 |
D. Meekins, G. Warren, R. Ent |
C846 |
Line C components for G0 |
03/12/2003 |
R. Ent, P. Ross, G. Smith |
C826 |
HALL C G-ZERO components asfound |
11/01/2002 |
Rolf Ent, Philip Roos |
C822 |
Line C diagnostic girders. |
10/29/2002 |
Benesch, Spata, Yan, Yun |
C821 |
SOS rail survey. |
10/22/2002 |
W. Kellner |
C816 |
Hall C dump viewer |
10/02/2002 |
J. Benesch, M. Spata, S. Suhring |
C802 |
Line C components for G0 |
08/22/2002 |
J. Benesch, M. Spata, R. Ent, R. Carlini |
C797 |
G0 Sealing surface and ring flatness inspection (dump) |
07/26/2002 |
Steve Lassiter |
C788 |
Hall C pivot elevation |
06/19/2002 |
B. Metzger |
C786 |
Hall C target cool down. |
06/11/2002 |
G. Smith, S. Covrig |
C774 |
G0 octant alignment relative to FW. |
05/23/2002 |
Philip Roos |
C771 |
Hall C Pivot Bolt Holes |
05/15/2002 |
Bert Metzger |
C763 |
Hall C G0 target calibration. |
05/03/2002 |
Silviu Covrig |
C749 |
Line C chicane/target tune up position |
03/14/2002 |
O. Rondon, M. Jones, (J. Benesch - email) |
C748 |
Hall C polarized target shell |
03/13/2002 |
M. Sealy, D. Day, O. Rondon |
C739 |
Line C chicane/target tune up position |
02/14/2002 |
O. Rondon, M. Jones, (J. Benesch - email) |
C733 |
Line C chicane/90 degree position |
01/24/2002 |
O. Rondon, M. Jones |
C732 |
Line C chicane/target tune up position |
01/18/2002 |
O. Rondon, M. Jones, (J. Benesch - email) |
C729 |
G zero support rail heights. |
01/09/2002 |
Lassiter |
C728 |
Line C GEN01 chicane/target as found (3.481gev) |
01/04/2002 |
Donal Day, Jay
Benish,Marco Zeier, Chen Yan |
C715 |
HMS vacuum pipe |
11/02/2001 |
Rolf Ent |
C714 |
Line C GEN01 chicane/target move (3.481gev) |
10/30/2001 |
Donal Day, Jay
Benish,Marco Zeier, Chen Yan |
C713 |
Line C GEN01 chicane move (TUNE UP) |
10/18/2001 |
Donal Day, Jay
Benish,Marco Zeier, Chen Yan |
C710 |
G0 octant shim packs(2nd set). |
10/15/2001 |
S. Lassiter |
C707 |
GEN01 Target Can & target asfound survey 2001.10.10 |
10/10/2001 |
Donal Day, Marko Zeier |
C706 |
G0 octant shim packs(initial set). |
10/09/2001 |
S. Lassiter |
C705 |
GEN01 Target probe survey 25 Sep 2001 |
10/03/2001 |
Donal Day, Marko Zeier |
C704 |
GEN01 Target move 30 Jul 2001 |
10/01/2001 |
Donal Day, Marko Zeier |
C585 |
G Zero Octan 1 results |
03/20/2000 |
S. Lassiter |
C584 |
G Zero Octan 4 results |
03/16/2000 |
S. Lassiter |
C583 |
G Zero Octan 2 results |
03/15/2000 |
S. Lassiter |
C581 |
G Zero Octan 3 results |
03/10/2000 |
S. Lassiter |
|
|
|
|
|
|
|
|